高壓水迴路 的英文怎麼說

中文拼音 [gāoshuǐhuí]
高壓水迴路 英文
high pressure water loop
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 高壓 : 1 (殘酷迫害; 極度壓制) high handed 2 [氣象學] (高氣壓) high pressure3 (高電壓) high tension...
  1. Presents the steady - state programming with constant coolant average temperature and constant live steam pressure, an ideal programming for marine nuclear power plant ( npp ), under which, both the coolant average temperature and the live steam pressure of nuclear steam supply system ( nsss ) are constant when the steady state operating condition is varied, and points out that in comparison with the steadysate programming with constant coolant average temperature, the ideal programming can improve the overall operating performance of npp effectively, especially in low - load range, for instance, raise the heat efficiency of npp, decrease the operating noise of main coolant pump, and improve the conditions of design, operation and control of the secondary loop system

    雙恆定運行方案是船用堆核動力裝置的理想運行方案.在這種運行方案下,當裝置穩態功率變化時,冷卻劑平均溫度與蒸汽都保持不變,與通常採用的冷卻劑平均溫度恆定運行方案相比,有效地改善了核動力裝置的總體運行性能,特別是在低負荷運行時,可以提裝置經濟性、降低主泵運行噪聲、改善二系統的設計、運行和控制條件,這對于提船用核動力裝置的運行可靠性和安全性具有實際意義
  2. Transitional feature of the arc and metal droplet in the welding process with steam shielded arc is investigated by means of analysing the waveforms of welding voltage and current under different welding regimes and it is found that there are two types of arc process behavor ? " arc starting - arc blowing out - short - circuiting " and " arc - starting - short - circuiting ". under the condition of constant diameter of welding wire and its feeding speed, the arc process behavor can be changed by adjusting the inductance of welding circuit as well as the voltage of power supply. if arc process behaves as alternative process of " arc starting - arc blowing out - short - circuiting " with minimum time duration of arc blowing out and maximum frequency of short - circuit transition, the welding process will be stable with less spatter and smooth weld bead

    通過分析不同焊接規范下的焊接電和電流的波形.研究了蒸氣保護下電弧及熔滴過渡的特點,發現其電弧過程行為有「燃弧?熄弧?短」和「燃弧?短」兩種形式.在焊絲直徑和送絲速度一定的情況下,通過調節焊接中的電感量和電源電,可以改變電弧的過程行為形式.若電弧過程呈「燃弧?熄弧?短」交替進行,並且熄弧時間最短時,短過渡頻率最,在這種情況下,飛濺小,焊道成型好,焊接過程穩定
  3. To the steam generator a heat exchanger, which converts the feed water in the secondary circuit to high - pressure steam at about 67 bar or 6 700 kpa and deliver it to the " conventional island " via steam pipe for driving the turbine and generator

    內的帶到蒸汽發生器即熱交換器,蒸汽發生器會將二轉化為約67巴或6 700千帕的蒸汽,再經過蒸氣管送到常規島,以推動渦輪發電機。
  4. To the steam generator ( a heat exchanger ), which converts the feed water in the secondary circuit to high - pressure steam at about 67 bar ( or 6 700 kpa ) and deliver it to the " conventional island " via steam pipe for driving the turbine and generator

    內的帶到蒸汽發生器(即熱交換器) ,蒸汽發生器會將二轉化為約67巴(或6700千帕)的蒸汽,再經過蒸氣管送到常規島,以推動渦輪發電機。
  5. The high control criteria of water vapor quality in secondary circuit of 1000 mw pwr is introduced, and the criteria are compared with those in thermoelectric generating set

    介紹了堆核電站1000mw機組二汽質量的控制標準,並與火力發電機組的汽質量控制標準進行了對比。
  6. Mechanical ( precision machine / hydro / air circuit ) maintenance high skill experience

    機械(精密設備/油/空氣平的維護經驗。
  7. A new full - wave measurement circuit structure is put forward that would increase distribution automation system reliability and veracity. the distributed protection and monitoring unit in this paper can instead of general instruments of low voltage distribution system. it not only combines ampere meter, voltage meter, active power meter, reactive power meter and power meter, frequency meter into a meter, but also increases monitoring position switch, control bus switching alternately and monitoring energy

    本文研製的保護和測控單元,可替代低配電系統中所使用的常規儀表,將原來需要的電流表、電表、有功功率表、無功功率表和功率因數表、頻率表簡化為一塊表,並增加了位置開關量檢測,控制母線投切和電度監測功能,從而極大的簡化了低配電二次儀表設計、安裝調試,提了運行、維護和管理平。
  8. Test investigation on sgtr of single tube break and three - tube break is carried out on hpitf of ciae to deeply understand the thermal - hydraulic behavior during pressurized - water - reactor ( pwr ) sgtr and to provide an integral data base for code assessment and development. the facility, a full height and 1 / 1000 - scale ( by volume ) of qinshan nuclear power plant, incorporates two identical loops with active pumps and steam generators ( sg ). the initial steady state of the test basically simulated that of the reference plant operation

    為了深入了解核電廠蒸汽發生器傳熱管破裂事故發生后的熱工力現象,以及對堆( pwr )核電廠系統分析程序進行分析和評價,在綜合試驗裝置上開展了蒸汽發生器傳熱管破裂試驗研究綜合試驗裝置以秦山核電廠主系統為模擬對象,該裝置為雙環系統,容積比為1 : 1000 ,度比為1 : 1 。
  9. Water in the primary circuit is maintained at a high temperature of over 300 degree c under high pressure of above 150 bars to prevent it from boiling

    在運作期間,一溫會達攝氏300度以上,並保持150巴以上的,以防沸騰。
分享友人