高山隧道 的英文怎麼說

中文拼音 [gāoshānsuìdào]
高山隧道 英文
alpine tunnel
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 高山 : alp; high mountain
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密度、爆破進尺等幾個方面確定秦嶺終南光面爆破主要參數的選取,分析了該鉆爆設計在施工中的運用取得的成效,提了施工進度,同時也保證了施工質量。
  2. Landslip construction control in changjiashan tunnel of qi - lin superhighway

    祁臨速常家滑坡進洞施工控制
  3. The result is that the probability of high tensity rockburst in the tunnel is non - existent and the probability of lowgrade and moderate tensity rockburst in the tunnel is existent

    預測結果表明,雪峰不會出現烈度的巖爆,但某些地段可以出現級或級的巖爆。
  4. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  5. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  6. The xuefeng mountain highway tunnel, which is to be constructed, is the most deep - lying and longest tunnel in our country. its geological conditions are more complex, the problems of rockburst and large deformation maybe its main problems of engineering geology

    邵懷速公路雪峰是目前我國擬建埋深最大和最長的公路之一,地質條件較為復雜,巖爆問題和大變形問題是該的主要工程地質問題。
  7. Mr lo said : the route 8 project under construction is to provide a 15km long dual three carriageway between tsing yi and sha tin. it comprises the nam wan, eagle nest and sha tin height tunnels, the stonecutters bridge and a number of viaducts and interchanges

    盧耀楨說:興建中的八號干線工程,是一條連接青衣及沙田的雙程三線行車路,全長十五公里,當中包括南灣及沙田嶺昂船洲大橋和交匯處。
  8. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合水壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大水平主應力方向與洞軸線小角度相交,對圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣尚未進入地應力段,最大主應力量級為17mpa 20mpa 。
  9. The stones were 1m in height, with words " city of victoria 1903 " marked on them. the stones include the one at the kennedy town temporary recreation ground at sai ning street ; hatton road near po shan road ; the south of pokfulam road near the pedestrian subway of mount davis road ; bowen road near stubbs road ; old peak road near tregunter path, and the pedestrian road of the car park opposite to st. paul s convent school at wong nai chung road

    界石約一米,上面刻有" city of victoria 1903 "的字樣,它們分別位於堅尼地城西寧街堅尼地城臨時游樂場內、克頓近寶珊、薄扶林近摩星嶺的行人入口、寶雲近司徒拔、舊近地利根德里邊,及黃泥涌聖保祿學校對面停車場行人路。
  10. Through strange and provocative dreams, jack sees himself reincarnated as meng yi, a general who fell for the first emperors beautiful consort ok soo starring kim hee seon some 2000 years ago

    Jack乘直升機到酈上空,冒險跳入峽谷中的瀑布,情景一如夢境另方面william一直藉助科技儀器尾隨跟蹤,二人同時闖進一條通往懸浮天宮的
  11. The results of the studies show that the size, length, and scope of tunnel lining crack can be identify by infrared thermography images

    經實地檢測雄市西子灣雄縣大關,發現襯砌之孔洞與裂縫部位,其紅外線熱影像溫度差異變化大於沒有孔洞裂縫之襯砌。
  12. The revenue proposals included increasing the lion rock tunnel toll from 6 to 8, and increasing the cross - harbour tunnel tolls for private cars from 10 to 20 and for motorcycles from 4 to 8

    稅收建議包括將獅子下稱"獅"收費由6元提至8元以及將海底下稱"海"私家車收費由10元提至20元,電單車收費則由4元提至8元。
  13. At the meeting held on 16. 4. 99, hc agreed to set up a subcommittee to scrutinize public revenue protection ( revenue ) order 1999 ( the order ). the order was a temporary measure taken under the public revenue protection ordinance to give effect to most of the revenue proposals announced in the budget speech delivered by the financial secretary on 3. 3. 99 when moving the second reading of the appropriation bill 1999. the revenue proposals included increasing the lion rock tunnel ( lrt ) toll from $ 6 to $ 8, and increasing the cross - harbour tunnel ( cht ) tolls for private cars from $ 10 to $ 20 and for motorcycles from $ 4 to $ 8

    於1999年4月16日的會議上,內務委員會同意成立小組委員會,負責審議《公共收入保障(收入)令》 (下稱"該命令" ) 。該命令是根據《公共收入保障條例》而採取的短暫措施,以實施財政司司長於1999年3月3日動議二讀《 1999年撥款條例草案》的財政預算案演辭中,所宣布的大部分稅收建議。稅收建議包括將獅子(下稱"獅" )收費由6元提至8元;以及將海底(下稱"海" )私家車收費由10元提至20元,電單車收費則由4元提至8元。
  14. Replacement of high voltage switchboards, transformers and low voltage system of the tunnel power supply system in lion rock tunnel, replacement of field equipment of toll collection system in cross - harbour tunnel and replacement of ventilation control panels, exhaust fans, motors and flexible connectors in aberdeen tunnel

    更換獅子供電系統的壓配電板變壓器和低電壓系統更換海底車輛繳費系統的路面設備及更換香港仔的通風控制屏抽氣扇電動機和軟接頭
  15. The field trial, on the k7 + 008 ~ k7 + 053 slope of the west approach at zhegu mount tunnel road 317, evaluates fully construction techniques and protection function of the ecological material

    選取國317線鷓鴣西引k7 + 008 k7 + 063路塹巖質陡坡作現場施工試驗,全面評價草種、生態基材在寒氣候條件下的生態護坡功能及施工方法和工藝。
  16. Leong, j. c., heat transfer and fluid flow in rotating cylinders with a porous sleeve, ph. d. dissertation, school of aerospace and mechanical engineering, university of oklahoma, usa, 2002, 321 pp

    梁智創、蔡建雄,國五號北宜速公路坪林頭城段雪通風及火災煙流電腦模擬軟體,領航資訊系統股份有限公司,技術報告, 2005 。
  17. Created by renowned developer sun hung kai properties limited to blend traditional quality with a modern lifestyle, millennium city club is close to the mtr, within easy reach of the eastern harbour and tate s cairn tunnels and has ample parking

    會所由著名發展商新鴻基地產有限公司興建,融匯傳統質素與現代化生活格調,鄰近地鐵站,交通便利,更可直達東區及大老,另設有大型停車場,以供使用。
  18. The five government toll tunnels and one bridge are aberdeen tunnel, cross - harbour tunnel, lion rock tunnel, shing mun tunnels, tseung kwan o tunnel and lantau link comprising tsing ma bridge, ma wan viaduct and kap shui mun bridge

    一橋包括香港仔、海底、獅子、城門、將軍澳及青嶼干線(包括青馬大橋、馬灣路及汲水門大橋)
  19. The five government toll tunnels and one bridge are aberdeen tunnel, cross - harbour tunnel, lion rock tunnel, shing mun tunnels, tseung kwan o tunnel and lantau link ( comprising tsing ma bridge, ma wan viaduct and kap shui mun bridge )

    一橋包括香港仔、海底、獅子、城門、將軍澳及青嶼干線(包括青馬大橋、馬灣路及汲水門大橋)
  20. Huangmeishan tunnel is the controlling project of maanshan - wuhu expressway, and also the 1st large span twin - arch tunnel constructed under the condition of shallow burying soft surrounding rocks in anhui province. the depth buried at the port of the tunnel is shallow, and it is covered with accumulated and disposal soil

    黃梅是馬蕪(馬鞍?蕪湖)速公路控制工程,是安徽省在淺埋軟弱圍巖條件下修建的第一條大跨度雙連拱洞口段埋深淺,且為坡積物和人工棄土覆蓋,圍巖鬆散,自承能力差。
分享友人