高拱 的英文怎麼說

中文拼音 [gāogǒng]
高拱 英文
gao gong
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. Had kind fate but willed her to be born a gentlewoman of high degree in her own right and had she only received the benefit of a good education gerty macdowell might easily have held her own beside any lady in the land and have seen herself exquisitely gowned with jewels on her brow and patrician suitors at her feet vying with one another to pay their devoirs to her

    她那雙秀麗的手和高拱起的腳背確鑿無疑地證明了這一點。倘若福星照,讓她投生上流社會家庭,並受到良好的教育,格蒂麥克道維爾就會成為與本國任何貴婦相比也毫不遜色的淑女。她額上就會戴起寶石,穿著講究,跟前必然圍滿了競相向她獻殷勤的貴公子們。
  2. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高拱壩壩身泄洪孔口、泄流過程以及壩下水墊塘的布置優化問題進行了討論。主要內容和成果有1
  3. Because of limit that invisibility and discommodious in anciently program, based on the method of limited rigid body equilibrium, using visual program language vb and connect autocad, realize plane and solid programme of abutment analysis of arch dam, provide alternation interface for designer. presently, our country constructing and will construct high 300m arch dam, it is important to judge security based on nonlinear fem analysis. basic theory of nonlinear fem analysis and its realization in ansys were studied

    針對傳統程序的存在問題,非直觀、不易操作特點,以剛體極限平衡法為基本分析方法, visualbasic作為操作平臺,結合autocad圖形軟體,完成了剛體極限平衡法二維、三維壩肩穩定分析程序設計,使之具有直觀性,可視性、易操作性,為設計人員提供了具有友好界面的工程使用軟體目前我國西部在建和將建一批300m級的高拱壩,運用有限元方法計分析壩穩定性、評判大壩安全度十分有必要。
  4. Three - dimensional nonlinear analysis of orifice of high arch dam

    混凝土高拱壩孔口三維非線性分析
  5. Fault tree analysis is used to analyse the high arch dam risk

    摘要利用故障樹分析法對高拱壩進行風險分析。
  6. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    高拱壩泄水墊塘襯砌穩定性研究
  7. Reinforcements across contraction joints of high arch dams to resist strong earthquakes

    強震區高拱壩橫縫配筋抗震措施
  8. Engineering measures for prevention of cracking and yielding of high arch dams

    防止高拱壩壩踵開裂和屈服的工程措施研究
  9. Application of locally incompatible meshes to stress analysis of high arch dams

    局部非協調網格在高拱壩應力分析中的應用
  10. Effect of unsymmetrical solar thermal radiation on thermal stresses of high arch dams

    左右岸日照差異對高拱壩下游壩面溫度應力的影響
  11. The analysis of high arch dam including cross - joint should be considered as a 3d elasto - plastic contact problem

    考慮橫縫的高拱壩結構分析本質上應按三維彈塑性接觸問題進行。
  12. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  13. The plane - wave analytic solution of the coupled fluid - air - solid system and the fem model of air cushion isolations are applied to study the influence of air cushion on earthquake response of dams. the calculations show that air isolation will reduce the hydrodynamic pressure significantly and restrain the dam vibrations during earthquakes. if the dam and reservoir is isolated by air cushions, it will decrease the hydrodynamic pressures by more than 90 % and the seismic stresses by 20 - 30 %

    將本文首次提出的水體-氣體-結構系統的平面波作用理論解和三維有限元模型,應用於溪洛渡雙曲壩的抗震安全性和氣幕隔震可行性研究中,表明氣幕對高拱壩具有良好的隔震性能,可降低動水壓力90以上,壩體地震應力20 30 ,減震效果顯著,並使壩體的抗拉安全系數從0 . 93提到3 . 58 。
  14. Along with the westward exploitation putting into practice, to make use of existing natural resources, several high arch dams will be built in the southwest of china where water resource is rich

    隨著西部大開發的實施,為了充分利用現有的自然資源,我國將在水力資源豐富的西南地區修建一批高拱壩。
  15. Because its complex of mechanics characteristic, shape of geometry and boundary condition, safety of the high arch dam under normal load is what engineers are concerned about

    因其受力特徵、幾何形狀、邊界條件等均較復雜,所以,高拱壩在正常荷載作用下的安全度,無疑是工程設計人員所關心的主要課題。
  16. A mathematic model is first introduced for optimizing the layout of flood - release structures in a high arch dam after an idea of the broad sense of construction costs for unit area gate is introduced, and the optimal computation of the layout of flood - release structures in xiao - wan arch dam demonstrates that this model is reasonable ; 4

    在引入了閘門廣義單位面積造價的基礎上,首次建立了高拱壩壩身泄洪建築物布置的數學優化模型,並通過對小灣壩壩身泄洪孔口的優化布置計算,說明所提出的數學優化模型是可用的; 4
  17. A method of classifying these structures is proposed, which is suitable for introducing a mathematic model for optimizing the layout of these structures

    高拱壩壩身泄洪孔口,提出了適合建立數學優化模型的分類方法; 2
  18. However the experience about design of high arch - darn is not enough in deep valley, especial when the dam is located in the areas of intensive earthquake. therefore the study of three dimension earthquake response is great significant in reality and history to the hydroelectric construction

    然而,由於缺乏在河谷寬比大的高拱壩設計經驗,特別是在地震烈度區修建高拱壩,因此,本項目的研究分析具有十分重要的現實意義。
  19. In order to reduce the equation complexity and adapt to complicaied noniinear ana1ysis of high arch dams with joints, finite element treatments are used with incompressibie water and massless foundation. the added mass of water and added stiffness of foundation are respectively used to substitute the influence of water and foundations. the efficiency in the computations is improved by means of static condensation

    為適應有橫縫高拱壩非線性分析的復雜性,採用不可壓縮水體和無質量地基假定進行有限元處理,以水體附加質量和地基附加剛度近似代替水體和地基的影響,通過靜凝聚提計算效率。
  20. A bearing surface transmits the interaction between an arch dam and its foundation, the strength of which directly affects the constraint of the bedrock to the dam, and thus affects the stress and deformation of the dam. the influence is studied in this paper with nonlinear finite element method, as an example, for a high arch dam in design. the results show that the influence on stress is only limited within the local area near the bearing surface, larger on the maximum principal tensile stress than on the principal compression stress, and the decrease of the strength does not cause unlimited increase of the maximum stress. the influence on the displacement of the top of the dam is smaller than that of the bottom of the dam, especially the relative downstream displacement. at the lower strength of the bearing surface, the relative downstream displacement at the bottom of the dam increases with the decrease of the strength

    建基面是傳遞壩和基巖相互作用的紐帶,它的強度直接影響基巖對壩體的約束,從而影響壩體的應力和變形.採用非線性有限單元法,以設計中的某高拱壩為例,分析建基面強度對壩體應力和變形的影響.結果表明建基面強度對壩體應力的影響僅限於建基面附近的局部范圍,對最大主拉應力的影響要大於對最大主壓應力的影響,建基面強度的降低不會無限地增大壩體的應力數值;建基面強度對壩頂位移的影響較小,但對壩底位移(尤其是順河向相對位移)的影響較大,當建基面強度較低時,壩底順河向相對位移隨建基面強度的降低而增大
分享友人