高架橋 的英文怎麼說

中文拼音 [gāojiàqiáo]
高架橋 英文
elevated bridge
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 高架 : elevated; overhead
  1. Nowadays, the bridges are in wide use in china, many new types of bridges such as large span bridges, cloverleaf junction and complicated viaducts emerge

    近幾十年來,中國的梁建設突飛猛進,城市中大跨梁、立交工程和復雜高架橋梁大量涌現。
  2. Erection of segmental bridge decks by ground support method cpr - 2

    運用施工興建中的高架橋
  3. Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report

    基於以上各點,世界自然基金會認為上水至落馬洲支線隧道高架橋方案環境影響評估報告未能符合環境影響評估程序的技術備忘錄的要求,故懇請環境保護署署長否決該申請。
  4. Erection of segmental bridge deck by launching gantry no. 1

    運用吊梁機興建中的高架橋
  5. Erection of segmental bridge deck by launching gantry no. 2

    運用吊梁機興建中的高架橋
  6. Erection of segmental bridge decks by launching gantry no. 1

    運用吊梁機興建中的高架橋
  7. Erection of segmental bridge decks by launching gantry no. 2

    運用吊梁機興建中的高架橋
  8. A research over substructure design for jinbin light rail viaduct with jointless track

    採用無縫線路的津濱輕軌高架橋梁下部結構設計研究
  9. Construction of concrete parapet along viaduct

    高架橋建造梁護欄
  10. Construction of pierhead segment at b3 - 3 - b4 - 1

    興建中的高架橋柱頭
  11. Pierhead segments at viaduct c6 in progress

    興建中的高架橋柱頭
  12. Pierhead segment at b3 - 3b4 - 1 completed

    已完成的高架橋柱頭
  13. Erection of segmental bridge at viaduct c6 span 1

    正在進行安裝工作臺已完成的高架橋
  14. Progress of substructure construction for the approach viaduct

    施工中之高架橋墩建造工程
  15. After expounding the power supply and current collection modes of the rolling stock in shanghai umt pearl line in terms of technology and economy, the author argues that two current collection modes shall be adopted for shanghai umt pearl line, i. e. a third rail collector be on skybridge while the overhead contact line on the ground

    摘要闡述了城市軌道交通車輛供電受流方式的特點,並從技術和經濟兩方面對上海明珠線車輛供電受流方式進行了探討,提出了明珠線車輛應採用雙受流方式,即高架橋上採用接觸軌受流器受電,地面採用空接觸網受電弓受電。
  16. Trial test of steel panel of noise barrier nb8 in progress

    已完成的高架橋隔音屏試驗段的鋼
  17. This new track may also be used in umt, metro lines and elevated lines

    此種道床軌道可在城市軌道交通的地面、地下和高架橋上應用。
  18. With their aid a vital viaduct on the main athens railway line was destroyed.

    在他們的幫助下,破壞了雅典鐵路干線上的一座主要高架橋梁。
  19. Viaduct accounts for 86 percent of the pearl line

    摘要明珠線全長86 %是高架橋
  20. A general view of viaduct works at fuk hang tsuen

    位於福亨村的高架橋興建情況
分享友人