高水頭壩 的英文怎麼說

中文拼音 [gāoshuǐtóu]
高水頭壩 英文
high-head dam
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水頭 : waterhead; head; flood peak水頭落差 head fall; 水頭坡降 water table gradient
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用流沖毛技術,大大提了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接機械連接技術,有效提了接強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提,經濟成本大大降低;三峽二期工程持續強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提了建築物的整體性和耐久性。
  2. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批電站正在建設或規劃之中,其泄建築物孔口及愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  3. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先平; 2 .主持國家自然科學基金重大項目「摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工性能混凝土成套技術研究」 ; 4 .利部「工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨性能混凝土技術、上海寶鋼礦石碼鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  4. Comparison of water level between measured and computation shows that the local head loss coefficient cannot give head loss by spur dike completely, and the effective area of passage is difficult to be ascertain. for this reason the two methods for water surface profile computation cannot predict the raise of water level upstream the spur dike accurately

    計算結果表明,局部損失系數並不能完全反映出由於丁阻擋所帶來的損失,而丁附近的有效過面積難以準確地確定,這些導致前兩種方法均不能很好地計算出丁上游位的壅值。
  5. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決建設中泄建築物的流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  6. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是大庫的電站,還是低河床式樞紐,電站進口的取排沙歷來是一個倍受關注的問題。
  7. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩河海大學博士論文的存在抬面線的位置,其中在閘墩部尤其明顯;墩型對流量系數和面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的流量系數和更小的面壓力:不同的墩厚閘寬比t / b對泄流能力也將產生顯著的影響,隨著墩厚閘寬比的增加,面壓力降低,而當t / b二0 . 2時溢流具有更大的流量系數。
  8. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底庫運用后沙變化這一主要矛盾,通過分析研究以往典型時期的沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底庫運用后沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽庫運用後下遊河道河勢變化的規律和特點,探索小浪底庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東、東村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  9. Shui buya hydro - hinge is the upest cock step of three - step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of qingjiang river, which is going to be developped by hubei qingjiang hydroelectric development ltd after constructing ge he yan and gao ba zhou hydroelectric power stations

    布埡利樞紐是湖北清江電開發有限責任公司繼隔河巖、電站之後,在清江中下游幹流上實施三級梯級開發的最上一級龍電站工程。
  10. By the experiment in site and construction of two important water conservancy projects ( longhekou reservoir and hengpaitou diversion project ), we go a step further on the principle of the jet - grouting used on dam diaphragm - wall

    本課題是結合龍河口庫、橫排樞紐兩個大型利工程基防滲加固的實際要求,通過現場試驗和工程施工,對形成噴防滲墻原理和作用機理進行進一步分析。
分享友人