高級測量師 的英文怎麼說

中文拼音 [gāoliángshī]
高級測量師 英文
senior surveyor
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 高級 : 1 (階段、級別達到一定高度的) senior; high ranking; high level; high; superb; higher; high stage...
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. Our company enjoy a large qualities of abundant technological personnel including high and middle cermaic and electrician engineer and artificer and identifier, that were engaged on the work about electronical ceramics for many years and were seasoned. the producing equipment and check - measure apparatus were perfected from day to day, so that affored stability base for stabilization of the quality of production

    我公司擁有包括、中陶瓷、電氣工程等工程技術人員在內的雄厚的技術力,並擁有一大批專業從事電子陶瓷多年、經驗豐富的技工和檢驗人員,生產設備和檢儀器的日臻完善,為產品質的穩定可靠提供了堅實的基礎。
  2. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作速公路路基填料,國內沒有先例,本論文就是結合導的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到路堤分層沉降監等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水、塑液限、顆粒配等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  3. A senior building surveyor of the buildings department was sentenced to one year s imprisonment, suspended for two years, for swindling private tenancy allowance totalling 190, 000

    一名屋宇署屋宇,向政府詐騙自行租屋津貼共十九萬元,被判入獄一年,緩刑兩年。
  4. The company is eq - uipped with 1500 sq. m of processing workshop and complete detecting means, including more than 20 sets of machine tools, three - coordinate measuring machines and motor detecting machine, etc, and with more than 30 technical workers and 10 engineers with professional title higher than the medium level. . .

    公司擁有加工車間1500平方米,精度各類機床二十多臺,三坐標儀電機檢儀等檢手段全,技術工人三十餘人,中以上工程十餘人同時,公司與華東理工大學機械工程學院和上海市電動工具研究檢所有著長期的協作關系,具備強大的研發和加工生產能力。
  5. A senior quantity surveyor of the main contractor for the construction of the sheung shui abattoir was sentenced to four weeks imprisonment for taking 80, 000 in bribes from a sub - contractor for proc

    一名上水屠房總承建商的物料,因收受分判商八萬元賄款,作為支付工程費用的報酬,被判入獄四星期。
  6. A senior quantity surveyor of the main contractor for the po lam station of the mass transit railway corporation was sentenced to six months imprisonment for accepting loans totalling 40, 000 for showing favour to a subcontractor

    一名為香港地下鐵路有限公司寶琳地鐵站總承辦商聘用的工料,收受共四萬元的貸款,作為給予某分判商優待的報酬,被判入獄六個月。
  7. A senior quantity surveyor of the main contractor for the po lam station of the mass transit railway corporation was charged for allegedly soliciting and accepting advantages for assisting in awarding contracts and showing favour to a subcontractor

    一名為香港地下鐵路有限公司寶琳地鐵站總承建商聘用的工料,涉嫌曾索取及收受利益,協助分判商取得合約及向其作出優待,被廉署落案起訴。
  8. He court of appeal dismissed the appeal by a senior quantity surveyor of the main contractor for the construction of the sheung shui abattoir against his conviction of accepting 80, 000 in bribes from a sub - contractor for processing payment of project fees, and ordered him to serve his four - week prison term

    該名工料,收受一名分判商八萬元賄款,以加速處理其付款申請,較早前被裁定罪名成立,被判入獄四個星期。
分享友人