高速沉降法 的英文怎麼說
中文拼音 [gāosùchénjiàngfǎ]
高速沉降法
英文
high speed sedimentation- 高 : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
- 速 : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
- 沉 : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
- 降 : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
- 法 : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
- 高速 : (高速度) high speed; high velocity (hv); high rate; swift; fast; express; high-speed
-
With the quick development of expressway in the soft soil area, the settlement and deformation of sub - grade of expressway has become a very outstanding question. this paper establishes the corresponding formulas of sub - grade 3 - d ( three - dimension ) settlement on inartificial foundation, bagged sand - drains foundation and semi - rigidity piles foundation, and the calculation results from the formulas is compared with the observation results of settlement. it proves that the methods adopted by the paper are feasible
本文擬根據馬鞍山?蕪湖高速公路軟土路基的沉降變形及其處理方法,對軟土路基的三維沉降計算和用袋裝砂井處理與粉噴樁半剛性樁處理時的沉降計算方法作一定的探討,同時與幾個路段的實際觀測資料分析比較,認為本文的沉降計算方法總體上是可行的。The inverse analysis method based on model discerning and all these curve fitting methods are used to forecast settlement of xuzhou - suqian expressway after completing. the result from calculation and analyzed shows the thinking and the method in the paper are suitable, and it can be proved its rationality and feasibility in studying and forecasting settlement after construction of the embankment
結合徐宿高速公路,進行了基於模型識別的路基沉降反演預測和各類曲線擬合法預測工后沉降的計算,通過計算驗證了模型識別反演預測思路和方法的適用性和改進指數法預測路基工后沉降的有效性和合理性。Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils
通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。The paper research the problem of depression of bridge approach of seasonal frozen zone according to highway chang ? u. it includes common ground soft ground, includes analysis of economic and engineering. at the same time, some treasures have been analyzed in contrast. the paper presents some measures to copy with soft ground and common ground
本文結合長余高速公路對季凍區的橋頭路堤沉降進行了分析,既有一般地基又有軟土地基,同時針對軟土地基的處置方式進行了深入的對比分析,既有技術上的又有經濟上的,還給出了對一般地基和軟土地基的一般處理方法,同時提出了應把橋頭跳車率控制在5以內的理論。Case - based reasoning approach to settlement of expressway on soft foundation
高速公路軟基最終沉降預測的範例推理方法One practical design method of soft foundation settlement forecast in expressway
高速公路軟基沉降預測實用設計方法In the same time, this paper applied the plane strain fem based on biot theory to analyzed calculated result and observation information hi scene. finally, this paper put forward a settlement forecast model based on the modified gaomujunjie method, using by inversion analysis theory to compare and analyze the settlement process of vhlcp. result indicated that the model inosculated with the fact data and the consolidation degree have finished 86 %, back - work settlement was 87mm
最後,根據實測沉降資料,採用一維反演分析法,推導最終沉降量計算公式,結合改進后的高木俊介固結度計算方法,建立真空堆載聯合預壓的沉降預測模型,並根據計算結果,對比實際沉降過程,對比表明:所建沉降預測模型與實測數據吻合,由此所得現場試驗的地基平均固結度達86 ,剩餘沉降為87mm ,滿足高速公路質量要求。The precision of the embankment ' s settlement forecast and analysis should be higher because the design of the expressway back - work settlement is exactly confined. therefore, the traditional algorithm method ca n ' t meet the demands
高速公路工后沉降的設計要求很高,相應對軟土地基沉降的預測分析精度要求也很高,傳統的計算方法已經無法滿足這一要求。The conventional stack - preloading method which we use at present can not meet the requirement of stabilization, time limit of construction and the settlement after completion of works, so a new kind of technique is to be introduced to soft soil treatment
高速公路的建設必須首先對這種地基進行處理。目前,常規堆載預壓法很難滿足施工穩定、工期和工后沉降的要求,必須採用新的技術措施進行處理。Based on the in - situ test of subgrade over soft soil reinforced by vacuum combined with fill preloading, the soil settlement property, controlling effect of post - construction settlement and preloading time that satisfy the settlement standards are analysed
摘要根據某真空聯合堆載預壓法加固深厚層軟土的試驗成果,分析了地基沉降規律、控制軟土地基路基工后沉降的效果,以及滿足高速鐵路路基工后沉降標準要求的預壓時間。Study on application of meshless method to settlement calculation of expressway
無單元法在高速公路沉降計算中的應用研究1. on the bases of some basic suppositions, terzaghi ' s one dimensional consolidation and principles of layered summation method, the paper draw the formula which can calculate the embankment of layered filling and take the formula into programme ; 2. building the finite difference model of layered high - stack soil, carrying out numerical simulation of construction sequence, construction velocity, interface element of layer - stacked, the author get the numerical solution
1利用一些基本假定,根據太沙基一維固結理論和分層總和法的基本原理,推導出來計算分層填築體自身沉降的公式,並編制了程序; 2建立了分層填築高填方路堤問題的有限差分模型,並對分層填築的施工順序、施工速度,界面單元進行了數值模擬,獲得了位移場和應力場的數值解。Various previous methods are summarized and classified into two categories : semi - math methods and pure - math methods. based on discussion of the common and difference among these methods, multiple - exponential model is presented. using the new method to predict settlement of some sections in su - jia - hang expressway, the result indicates that the new method can accurately predict settlement and has practical value
總結以往荷載穩定后的沉降預測方法,並將其劃分為半數學方法與純數學方法,尋找各種預測方法相互之間的聯系與差別,提出復合指數曲線預測方法,並運用新方法對蘇嘉杭高速公路重點段落的部分斷面進行沉降預測,驗證了新方法的預測功能和實用價值。Finally, this paper detailedly introduces the application of preloading method combining with vacuum stack - load in the practice of a freeway project. three sorts of experience calculation method of final settlement which based on the settlement data measured in - site are contrastively analysed, and points out the hyperbola method be recommended for settlement predicted because it accord with the actual instance of guangdong pearl river delta area, and bring up the range of settlement correcting coefficient corresponds to the characteristic of the region
最後,本文結合某高速公路工程實踐,詳細介紹了真空聯合堆載法在高速公路上的應用,並利用實測沉降曲線對三種預估最終沉降量的經驗方法進行了對比分析,提出了雙曲線法計算最終沉降量較符合廣東珠三角地區,並提出較符合地區特點的沉降修正系數取值范圍,可供類似工程參考。The focus is on description the aspects of design and construction of dim piles used in the part of jing - zhu freeway at dong xi hu, wuhan, hubei. an detail analysis of the observed settlement is also presented
本文結合介紹了這一工作的主要內容,著重闡述了京珠高速公路湖北省東西湖段粉噴樁處理方法的設計和施工方面的問題,並對沉降觀測結果進行了詳細分析。分享友人