黃河上游 的英文怎麼說

中文拼音 [huángshàngyóu]
黃河上游 英文
the upper reaches of the yellow river2
  • : Ⅰ形容詞(像絲瓜花或向日葵花的顏色) yellow Ⅱ名詞1 (指黃河)short for the huanghe river:黃泛區the...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : 上名詞[語言學] (指上聲) falling-rising tone
  • : Ⅰ動詞1 (人或動物在水裡行動) swim 2 (各處從容地行走; 閑逛) rove around; wander; travel; tour 3...
  • 黃河 : the huanghe river; the yellow river黃河流域 the huanghe valley; 黃河三角洲 the huanghe delta
  1. With thousands years of diastrophism and human society ' s development, the natural environment of the upper - part of the yellow river has conceived its distinguished zoology and resource structure, therefore forms its special geographic upper - part - yellow river region ' s economy and society development model

    黃河上游的自然環境隨著千百年的地殼運動以及人類繁衍,孕育出了獨特的生態及資源結構,從而也形成了具有區域特色的黃河上游典型地區經濟和社會發展模式。
  2. This paper carries on the 3d finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of huang river as the carrier

    摘要以黃河上游擬建的某燈泡貫流式水電站為載體,對廠房壩段整體進行了三維有限元結構分析。
  3. In term of rational price the compensation benefit in the main stream of the yellow river mean annual is 5. 086 * 10a8 yuan. ( 4 ) with the long - liu regulated, the ning - meng irrigation guarantee rate increased from 31. 25 to 86. 25 percent, the downstream increased from 56. 25 to 80. 00 percent

    ( 4 )黃河上游水電站調節直接保證了寧蒙灌區與下省區的灌溉用水,經龍劉調節以後,寧蒙灌區灌溉年保證率由31 . 25提高到86 . 25 :下省區由56 . 25提高到80 . 00 。
  4. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往補償效益的研究都是靜態計算而言,本文結合不同水平年幹流梯級的滾動開發規劃,考慮不同年代補償效益的動態特性,採用幹流梯級水庫補償效益的模擬模型,計算了2000 、 2010以及2020三個水平年黃河上游徑流式梯級電站的發電補償效益。
  5. It decides the protective objectives for different ecological reserve area based on the study of channel wetlands and survey and analysis of top - grade species ( fishes ) of the yellow river : from the point of the basin, the main ecological protective objectives of the tipper stream are vegetation and forest for conservation of water supply ; soil and water conservation is the main in the middle reaches for vegetation protection and rehabilitation and ; the lower reaches takes types of wetlands protection and wetlands area maintenance as the main, protecting biodiversity and important birds resources

    道濕地研究和水體內頂級物種(魚類)的調查分析基礎,確定了不同類型生態保護區的生態保護目標:從流域角度而言,黃河上游的主要生態保護目標是植被和水源涵養林;中應以水土保持為主,主要是恢復和保護植被;下以保護濕地類型和維持濕地面積為重點,保護生物多樣性和重要鳥類資源。
  6. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦水電站700mw水輪機的參數選擇進行了研究,通過對國內外的大容量、高水頭水輪機的比轉速統計計算,利用水輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了水輪機主要參數選擇論證,提出了適合拉西瓦水電站水輪機的主要目標參數。
  7. The upstream of yellow river is rich in hydr opower resources and shoul d be listed in the priority development region

    黃河上游水力資源是我國水電建設的富礦,應為優先開發的重點。
  8. Thoughts on hydropower development on the upper yellow river

    關于黃河上游水電開發的若干構想
  9. An lnvestigation of traditional skin - raft - making technology in the upper reach of the yellow river

    黃河上游地區傳統皮船技術的調查研究
  10. All the problems mentioned above, restrict the cascade development of huanghe river ' s hydroelectric

    所有這些問題的存在,嚴重製約了黃河上游水電梯級滾動開發。
  11. The ningxia river section of the yellow river, which is 379km long, belongs to the upper section of lower reaches of the yellow river

    寧夏段屬黃河上游下段,全長397km ,重點治理的平原道長266 . 7km ,根據其特性可分為三段。
  12. ( 7 ) from analysis, the smg model with decaying recursion updating is the most suitable model for reservoir 10 day runoff forecast at liujiaxia and longyangxia. and neural network model is the next

    ( 7 )通過對比分析,認為加衰減遞推實時修正的smg模型是最適合黃河上游的中長期水文預報模型,神經網路次之。
  13. Though the study of basic theory and solution of cascade development gradation, the author brought two projects of the gradation of cascade hydroelectric development of huanghe upstream

    通過三大問題的研究,為黃河上游水電實現梯級滾動開發奠定了重要的理論基礎,並對西部大開發戰略的實施具有重要的參考價值。
  14. Because of the location and river characteristics, in winter, the ice flood is very serious and often cause ice flood disaster in inner mongolia reach of the yellow river, so it is one of the most important reaches of preventing ice flood

    黃河上游內蒙古段,由於其所處的地理位置及道條件等因素,冬季冰情嚴重,經常產生凌汛災害,為重點防凌段之一。
  15. The research of bend channel of reach guide - lijia flume from longyang flume to lijia flume in upstream of the yellow river is proceeded to present rules of feasibility analysis for navigation between the flumes and the riverbed stability

    摘要對黃河上游龍羊峽至李家峽間的貴德李家峽段的蜿蜒道進行了研究,為蓄水兩壩間的通航和床穩定性問題提供可行性分析依據。
  16. Following the requirement of the reservoir operation section of north - west electricity management bureau in developing a 10 day runoff forecasting scheme and considering the situation of no suitable forecasting model to serve the purpose, this thesis, from ge shouxi ' s and wmo ' s point, defined a group of standards which are practicability, information ability which means the ability of a model to adopt information contend in observed data, extension capacity and robustness, being used for evaluating performance of a forecast model and with them makes a comparison among systematic models as multi - regression model, generalized tank model, neural network method and system model of genesis ( in short smg ), and one conceptual model, the xinganjiang model

    針對西北電網水調部門提出的開發黃河上游徑流中長期預報軟體的任務,根據wmo和葛守西的總結,本論文利用四個系統模型和一個概念模型對黃河上游的龍、劉兩庫的汛期入庫徑流量進行旬徑流預報嘗試,並對所用的模型進行了泛化性、穩健性、模型結構、對水文信息反映和實用性及作中長期預報時何種系統模型的輸入最好作了比較研究,為龍、劉兩庫的徑流中期預報模型的採用提出了建議。
  17. Analysis of water and sediment materials from main hydro - stations in the upper reaches of the yellow river in qinghai province showed that, the area in the upper reaches of the yellow river was only 23. 4 % of the total yellow river basin, while its runoff was 47. 5 %, and sediment yield was only 3. 86 % of that of the whole basin, so it was a major area of water production and supply

    利用青海境內黃河上游主要水文測站的資料,對境內水沙來源及組成進行了分析,認為該區面積只佔流域面積的23 . 4 ,而徑流量佔47 . 5 ,輸沙量只佔3 . 86 ,是的主要產流區和水量供給地之一。
  18. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃河上游梯級運行特點,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工渡汛影響。
  19. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  20. After the changes of the construction management system of lijiaxia hydropower station have been studied, the paper puts forward some thoughts on establishing and operating the rolling - development mechanism in the hydropower step constru ction in the upstream of yellow river according to the requirements of modern en terprise system and on the basis of making full use of the rich experience of th e construction management of lijiaxia hydropower station, which could accelerate the hydropower development and alleviate the power shortage so that it could ma ke great contribution to promote the economic development in the northeast regio n and to our socialism build

    在研究了李家峽水電站建設管理體制的變革過程后,提出了按照現代企業制度要求,利用李家峽水電站工程建設管理的豐富經驗,建立、運作黃河上游水電梯級滾動開發機制的設想,以便加快開發速度,緩解電力嚴重不足的現象,振興西北經濟,為我國社會主義建設做出巨大的貢獻。
分享友人