anchor force 中文意思是什麼

anchor force 解釋
錨固拉力
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  • force : n 1 力,勢。2 體力,氣力,精力,魄力。3 暴力,壓力;兵力,武力。4 〈pl 〉 部隊,軍隊,兵力。5 勢...
  1. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究錨桿在不同荷載作用下,錨桿的工作狀態從彈性到彈塑性發展的整個過程,本文進行了錨桿受力的模型實驗研究,根據實驗結果提出了剪應力與位移的彈塑性本構關系表達式,並根據錨桿受力的基本方程,求解得出了錨桿在不同工作狀態下從彈性到彈塑性滑移的全過程中錨桿的內力分佈。
  2. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對錨索錨固力及錨索最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高預應力錨索錨固性能的措施,以及具體的施工方案和施工工藝。
  3. Secondly, by making use of the features of lattice frame anchor structure which can protect slope and retain stability of landslide together with its small space between beams and light anchor, the calculation model and formulas of slope force are dealt with and the design process of lattice beam and pillar as well as anchor and plate are introduced carefully

    利用格構式錨桿框架結構所採用的小間距、小噸位錨桿及連續格構樑柱,從而使格構樑柱受力較均勻,適合鬆散堆積體滑坡治理的需要,即同時滿足深層抗滑和淺層護坡。
  4. Rebounding displacement of slope and axial force of anchor bars increases as the increment of the included angle of the rebounding displacement vector and x positive axis will reduce as the increment of horizontal tectonic stresses. the reduction of lithologic characters and weak interplayer have unfavorable influence on stability

    支護錨稈軸力也增大;隨著水平構造應力的增加,回彈位移矢量與水平x軸正方向所形成的角度將減小;邊坡巖體巖性參數的弱化和軟弱央層的存在都對邊坡的穩定造成不利的鍘惻。
  5. Basic tests on the prestressing force anchor of a high slope project

    路塹高邊坡錨固工程預應力錨索基本試驗
  6. Through discussion of scenarios that are derived from current real life cases, they can see for themselves and gain insights on the hidden risks and their consequences, and appreciate how the force s shared values can help anchor them on the right track.

    透過討論取材自現實生活個案中的情節,他們可以身歷其境,洞悉隱藏的危機及其後果,並體會到警隊價值觀怎樣可以幫助他們堅守正軌。
  7. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼拱架內力(主要為軸力和彎矩)模型以及錨桿軸力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一定的指導意義。
  8. ( 6 ) the thesis puts forward the pile - top displacement control method, and it can account the least force of the anchor wire on anti - slide pile

    ( 6 )本文提出了錨拉抗滑樁錨拉力計算的樁頂位移控製法,計算控制樁頂位移所需的最小錨拉力。
  9. Ltd. the aim of this research is to find out the causes of abnormal axial force that results in fracture of bolts that anchor the shaft of planet gear and rupture of gear by means of force and deformation analysis, thus propose improving project of zl50 wheel type loader to enhance design quality. prime study content in the paper is described in the following

    本課題研究的目的是通過該變速箱的均載性能、各部件的受力、變形以及齒輪接觸應力的分析,尋找出直齒行星輪機構產生異常軸向力,從而導致變速箱行星軸止動螺栓斷裂及部分行星輪輪齒崩裂的原因,為柳工zl50裝載機行星齒輪變速箱的改進提出方案,提高設計質量和設計水平。
  10. Calculating method of landslides drive force, and determination of the diameters of borehole and anchor cable, the number of the anchor cables, the anchorage length and types of the anchor head as well are also discussed

    本文還探討了作用在抗滑樁上的滑坡推力設計值的計算方法,以及錨索材料的選定、錨固深度計算、錨頭類型選擇、錨索與樁的連接設計、施工工藝與質量控制措施、檢測與監測等等。
  11. Thus, the author attempt to develop a new model of anchor bolts so as to avoid the disadvantages. in the model, the interaction between the bolt and the geotechnical mass is taken as contact problem, in which if the tangential force at the interface has reached the limit resistance, the relative slide in the interface will occur along the tangential direction. also, the computational parameters in the model have tangible physical meanings and have less difficulty to obtain

    為此,本論文提出一種新的錨桿計算模型,它將錨桿與周圍巖土體間的相互作用作為接觸問題考慮,其計算理論比較嚴謹,能較好地模擬出錨桿的受力狀態及錨桿與巖土體間的剪切?滑移作用,即:錨桿?巖土體之間的接觸面具有抵抗強度,當接觸面上切向應力小於其抵抗強度時,錨桿與巖土體共同變形;達到抵抗強度時則沿切向發生相對滑動。
  12. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬分析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿軸力、支護及襯砌強度進行的量測與監控,對量測結果作出了科學分析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。
  13. At the same time, the thesis analyses the time - state curve of the axial force and bending moment of the steel framework and the axial force of the anchor bolt. the analysis results are compared with the results of the fem calculation

    同時,論文對現場監控量測獲得的鋼拱架軸力彎矩時態曲線以及錨桿軸力時態曲線進行了分析,並與理論計算進行了比較,驗證。
  14. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔錨固區節段最不利斷面在環向預應力與索力共同作用下塔壁的應力響應進行了研究。
  15. As the main method of measurement in the tests, some strain measuring points are arranged on the reinforced steel bars of the anchor bearing body. the changes of strain with different loading levels at their locations have been measured, through which range of influence and distribution of strain with loading in grout can be investigated, and corresponding distributions of axial force and bond stress are calculated according to hooke ' s law. making use of nonlinear curve fitting, distribution equation of bond stress of the fixed unit anchor length is achieved

    試驗測試手段通過在錨索承載體上布設應變測點,觀測錨索在不同的荷載級別下的應變變化情況,對不同荷載級別下,單元錨索注漿體內應變的影響范圍及分佈規律展開分析,依據虎克定律計算出了其軸力與粘結應力的分佈;並對測試結果進行了擬合,得出了錨固段粘結應力分佈的擬合方程。
  16. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  17. The anchor technology is a kind of method of active reinforcing that changes slope ' s stress status and inspires one ' s own stability by huge anchor force

    錨固技術是利用巨大的錨固力改變坡體應力狀態、調用坡體自穩能力的一種主動加固方法。
  18. In the stability graphical method, the basic property of rock mass is understood by engineering geology survey, the stability is analyzed at first, then the supporting parameters are determined, and the anchoring force is checked according to the type of cable - anchor

    穩定性圖解法通過巖體工程地質調查來掌握巖體的基本特性,首先對采場進行穩定性分析,在此基礎上確定其支護參數,並針對具體錨索型號驗算錨固力。
  19. By the test of anchor cable pull - out intensity, research is carried on anchor capability, stiffness coefficient and prestress losses of anchor cable in reinforcing similar soil slopes. the mechanisms of reinforcing similar soil slopes by prestressed anchor cable sash ( beam ) are studied by the method of combination of field test, theory analysis and numerical simulation, as a result, the calculational pattern of internal force of anchor cable sash ( beam ) is put forward

    本文通過大量野外調查,提出類土質邊坡的概念,並分析了它不同於一般粘性土邊坡的特性;通過錨索抗拔試驗研究了類土質邊坡的錨固力大小、錨索剛度系數和錨索預應力損失情況;通過現場試驗、理論分析和數值計算相結合的方法,研究預應力錨索框架(地梁)加固類土質邊坡的機理,提出預應力錨索框架(地梁)的內力計算模式。
  20. According to test results, author analyses deformation characters and its rules of prestress anchor cable composite soil nail supporting and pile anchor composite soil nail supporting, studies work mechanism of prestress anchor cable composite soil nail supporting structure, explores change regularity of inner force of soil

    三、對預應力錨索復合土釘支護結構進行了大量全方位的現場原位測試試驗。根據試驗測試結果來研究分析預應力錨索復合土釘支護結構和樁錨式復合土釘支護結構的變形特徵及規律。