base of dam 中文意思是什麼

base of dam 解釋
壩腳
  • base : n 1 基底,基,根基,底座;底層,底子;(紀念碑等的)基址;(山)麓。2 【軍事】基地,根據地。3 根...
  • of : OF =Old French 古法語。
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. Based on total stress index of property of statics and dynamics of dam body and dam base materials which obtained from test, utilizing duncan - chang hyperbola model and equipollence linearity model to analysis static state and dynamic stress state affected by earthquake of hada mountain dam body and dam base

    根據試驗得到的壩體和壩基材料的靜動力學性質的總應力指標,計算中採用duncan ? chang雙曲線模型和等效線性模型,分析了哈達山壩體和壩基的靜應力狀態以及它們在地震作用下的動應力狀態。
  2. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  3. According to status of huxi bank in xuzhou, jiangsu province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method in the base of study and analysis

    本文結合南四湖湖西大堤地下採煤的具體情況,利用數值分析理論及堤防加固技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  4. According to status of huxi bank in xuzhoujiangsu province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method in the base of study and analysis

    本文結合江蘇省徐州市湖西大堤地下採煤的具體情況,利用數值分析理論及堤防加固技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  5. According to status of mengshan clay core dam in zibo, shandong province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method hi the base of study and analysis

    本文結合山東省淄博市萌山水庫心墻壩的具體情況,利用數值分析理論及土石壩加固新技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  6. The base is divided into finite block element. so, the stress and load that this system divided can be calculated. combining analyzing morrow point dam on colorado river with this method, the rationality of it is validated

    應用上述方法,結合morrowpoint雙曲拱壩,計算了該壩的分載與徑向位移,其成果合理,驗證了本文建立的壩體虛擬彈性地基梁與壩基塊體有限元組合的拱壩分載法的合理性,且滿足工程精度的要求,有一定的實用價值。
  7. Evaluation of the deep stability against sliding of the dam base of fenhe no. 2 reservoir

    汾河二庫壩基深層抗滑穩定性評價
  8. Study on seepage stability of dam base for mopanshan reservior

    磨盤山水庫壩基滲透穩定研究
  9. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  10. Arch dam, which is fastened to the base rock, is a high _ order, hyperstatic, spacial body case structure. it has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function

    拱壩是固結于基巖的高次超靜定空間殼體結構,既有拱作用又有梁作用,其主要荷載是通過拱的作用傳到兩岸壩肩。
  11. It is an impotent part that plans and selects the place for sand & stone in the planning and the construction order of hydraulics and electric power project on base of concrete dam. material field choose and receive many kinds of restriction of terms is influence factor a lot of

    砂石料場的規劃選擇是混凝土壩為主體工程的水利水電工程施工組織設計中的重要環節,料場選擇受到多種條件的制約,影響因素很多。
  12. Base on studying the analyzed - approach of reservior - induced seimicity, writer bring forward the hydrogeological analyzed method for reservior - induced seimicity, and with that eatimated the reservior - induced seimicity of hydrogeological model model in dam - region. at the same time analyzed the reservior - induced seimicity danger of large - scale break in periphery of dam region

    在對比研究水庫誘發地震分析方法的基礎上,作者提出水庫誘發地震水文地質分析方法並利用該方法對壩區水文地質模型水庫誘發地震作出評價,同時對壩區外圍大型斷裂的水庫誘發地震進行了一定程度的分析。
  13. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  14. ( 3 ) generally, dam and base are operated in material viscidity status. by studying on the creep model of dam concrete and base rock, and combined them together, the coupling model of these factors is bringing forward

    ( 3 )通過研究壩體混凝土徐變模型和壩基巖體的蠕變模型,並將兩者有機結合,分別針對混凝土重力壩和拱壩,提出了考慮壩體徐變和壩基蠕變相互作用的組合模型。
  15. To determine if the dam base been liquefied through contrasting the shear stress which caused sand and gravel layer liquefied measured from indoor dynamic triaxial teat with calculated shear stress caused by earthquake in different depth of sand and gravel layer. and according to result of comparison to direct the design scheme of dam base

    根據室內系統的動三軸試驗測定的砂礫石層液化所需的剪應力與計算的砂礫石層中不同深度處由地震引起的剪應力相對比,從而最終判定壩基是否液化,並根據該結論指導了壩基設計處理方案。
  16. On the base of the study on the hydrogeochemistry at dam area, the author analyzes the last hydrochemistry data of bearing crevice water. from the diagram of piper and the correlation diagram of na / ca and na, it is known that the deep bearing tectonic fracture water is produced by two sources mix, meanwhile it is found out that there is better hydraulic power connection among bore d46, d503, d211, which shows there is better nnw hydraulic power connection at complex zone making up of fault no. 7, no. 15 and no. 2

    在壩區的水文地球化學的研究基礎上,整理分析了壩區以前的承壓裂隙水的水化學資料,從piper圖、 na ca ? na關系圖,說明了壩區深部承壓裂隙水是二源混合的產物,結合聚類分析表明了壩區d46 、 d503 、 d211鉆孔之間存在較好水力聯系,進而說明了在壩區f7與f15斷裂帶以及f2構成的復雜地帶存在北北西向較好的水力聯系。
  17. How to incorporate the reliability of dam ' s body with the reliability of dam ' s base is a high direction in the reliability study of arc dam in future

    如何把壩體和壩肩的可靠度結合起來成為拱壩的體系可靠度是今後拱壩可靠度的研究的主要方向。
  18. 15. gpr testing of the dam base of shenzhen longkou reservoir

    15 .深圳口水庫壩基探地雷達檢測
  19. Based on the design thought of " one engineering and four - base system " and getting full use of technologies of programming, network, software and the dam safety monitoring theory, the master dissertation embedded studies several important problems of the development of dam safety monitoring and controlling

    本文基於「一機四庫」的設計思想,充分利用當前計算機開發技術、網路技術、軟體工程、數據庫技術,並結合大壩安全監控的先進技術,就大壩安全監控系統開發中的幾個關鍵問題做了較深入的研究。
  20. As a project financed by yunfeng and ming tomb hydroelectric power station, the study on " mathematical model for dam safety monitoring and dynamic inverse model for underground power house " was conducted. according to the data observed in - situ, the under - fitting problems in regression models for dam safety monitoring were discussed, and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model

    本文利用大壩運行監測資料和水電站廠房結構的振動測試數據,對水工建築物的正反分析模型中的相關問題進行了探討,分析了大壩安全監測回歸模型存在的欠擬合現象,建立了通用的結構動力最優化反分析模型,實現用戶優化演算法對復雜結構的直接調用和優化計算,在計算模型方法的基礎上對雲峰寬縫重力壩的安全狀況和十三陵抽水蓄能電站的動力反演問題進行實例分析。
分享友人