dam 中文意思是什麼

音標 [dæm]
dam 解釋
n. 名詞 1. 水閘,壩,堰。
2. 壩中的水。
3. 【礦物】坑道堰。
4. (牙科用的)橡皮障。
5. 〈比喻〉障礙。
vt. 及物動詞 1. 築水閘堵住。
2. 阻塞,遮斷。
3. 抑制。
n. 名詞 1. 母獸。
2. 〈古、蔑〉母親。

  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  3. If magnitude of expansive stress caused by adscititious magnesia is too large, or its distribution is not uniform, it trends to damage the structure of cement concrete, and then affect seriously dam durability

    如果氧化鎂混凝土膨脹量過大或不均,都將破壞水泥混凝土結構,影響耐久性,甚至局部崩裂造成安全事故。
  4. After the first flood, we planted 300 olive and almond trees behind each dam.

    第一次洪水之後,我們在每個水壩後面補種了300棵橄欖樹和巴日杏樹。
  5. Based on the two methods above, the observed data of yunfeng dam was anglicized. the computational results show that under - fitting problems were solved perfectly

    因此,利用觀測資料進行廠房結構系統的反演分析,探討合理的計算模型和控制參量,是十分有價值的研究課題。
  6. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  7. Study and application of plate dam for meeting argent water retaining

    板壩式應急擋水子堤方案的研究與應用
  8. After like near future arrowroot continent dam flies a shop sign afresh go situation and to the limit of one ' s capacity rises should notice early days goes situation, if be pulled considerably, magnify again quantity, be about vigilance is banker shipment ( this time may be a few longer, banker is sucked prepare time to grow more, shipment time is long ), island visitting extensive region goes situation ( be about in first time to the limit of one ' s capacity first shipment ) if early days is to pass dish of full share, ( at present the individual thinks to have treasure new the sources of energy ) in the to the limit of one ' s capacity when breaking through strong line or resistance line but follow - up, that ability is really true the quantity adds valence to rise dropping is not must to the limit of one ' s capacity, and shrink the volume drops consequence is more serious, because early days banker already gave money, basically be, use odd amount to be bungled again dish, medicinal powder door meet disastrous

    如近期葛洲壩重新開牌后的走勢而放量上升要注重前期走勢,假如大幅拉升后再放大量,就要警惕是莊家出貨(這個時間可能比較長一些,莊家吸籌時間越長,出貨時間就長) ,看看寰島走勢(在第一次放量就要先出貨了)假如前期是經過盤整的股票, (目前個人認為有寶新能源)在突破勁線或阻力線時放量就可跟進,那才是真真正正的量增價升下跌不是一定要放量,而縮量下跌後果更嚴重,主要是因為前期莊家已出完貨,利用剩餘數量再砸一下盤,散戶就會損失慘重!
  9. Stress analysis of the rock fill dam with asphaltic concrete core wall

    冶勒堆石壩瀝青混凝土心墻型式及尺寸研究
  10. The old aswan dam was a barrage.

    老的阿斯旺壩是一個攔河閘。
  11. Work began on the aswan dam in nineteen sixty

    阿斯旺大壩的建築工作從20世紀六十年代開始。
  12. The aswan dam helps to control the river nile in egypt

    阿斯旺水壩有助於控制埃及的尼羅河水。
  13. Egypt ' s leadership in the arab was cemented by the aswan high dam

    阿斯旺大壩鞏固了埃及在阿拉伯世界的領袖地位。
  14. Aswan high dam, egypt

    印度阿斯旺水壩
  15. Aswan high dam egypt

    印度阿斯旺水壩
  16. Study on influences of asymmetry on arch dam foundation

    拱壩基礎不對稱性影響研究
  17. According to this, the temperature field stress field and autogeny body - expand - deformation field of yangchun arch dam during construction arid operation period are analyzed, thus many significant conclusions are got for reference

    由此,模擬分析了陽春拱壩施工期和運行期溫度場、自生體積膨脹變形場及應力場,得到了一些有參考意義的結論。
  18. Hyperbola model of mgo - mixed concrete ' s autogeny deformation, especially deduce of the model ' s parameter and building process of the model are analyzed in detail. ( 2 ) calculating method of autogeny deformation and creep are discussed. based on these, timely - simulation theory of dam body ' s temperature field stress field and pre - process back - process method are mainly studied

    ( 2 )對mgo混凝土的自生體積變形及徐變變形的計算方法進行了探討,在此基礎上,重點研究了壩體溫度場和應力場實時模擬的原理以及前後處理方法。
  19. Abb china chairman and president peter leupp announced yesterday the company has won contracts worth around us 60 million to supply a large 500 kv gas - insulated switchgear and 12 sets of power transformers for the right - bank power plant of the three gorges dam project

    這次客車企業能首先榮膺汽車行業的「中國名牌」 ,也是和客車企業長期以來特別重視品牌建設,打造名牌意識強烈分不開的。他們中的很多企業甚至已經喊出了要爭國際名牌的聲音。
  20. Like an iron bastion, the dam withstood the rushing floodwaters.

    大壩好似銅墻鐵壁,頂住了洪水的沖擊。
分享友人