baseline schedule 中文意思是什麼

baseline schedule 解釋
基線進度計劃
  • baseline : 底線。球場兩端的邊界線。
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. The schedule of accommodation and preliminary design brief for core arts and cultural facilities states the number of car parking spaces for each of the core arts and cultural facilities as a requirement of the government s baseline for each individual facility concerned. however, proponents are not expected to provide an aggregate of all car parking spaces stated in the schedule of accommodation and preliminary design brief for core arts and cultural facilities ( 2, 300 in total ) for the exclusive use of the core arts and cultural facilities

    核心文藝設施的用途分配表和初步設計大綱列出每項核心文藝設施所需的停車位數量,訂明為政府基線計劃對有關的每一項設施的規定。不過,政府並沒有要求建議者把核心文藝設施的用途分配表和初步設計大綱所述、為數合共2300個的停車位,全部撥予核心文藝設施專用。
  2. Displays the schedule variance in a project, including start and finish dates, baseline and finish dates, and start and finish variances.

    顯示項目中的日程差異,包括開始日期與完成日期差異、比較比較基準與完成日期差異以及開始與完成差異
  3. Displays tasks that have either slipped behind their baseline scheduled finish date or that have n ' t been progressing on schedule

    顯示滯後於其比較基準排定的完成日期的任務,或者未按日程進度進行的任務。
  4. Displays resources with tasks that have either slipped behind their baseline scheduled finish date or have n ' t been progressing on schedule

    顯示滯後於比較基準日程的完成日期或未按日程進度進行的任務的資源。
  5. Use this task view to compare the baseline schedule with the actual schedule. ( you need to save a baseline in order to view baseline bars. )

    使用此任務視圖可比較比較基準日程與實際日程(為了查看比較基準條形圖,必須保存比較基準) 。
  6. Usually used with a modifier for example, cost baseline, schedule baseline, performance measurement baseline

    通常與修飾符(例如,成本基線、計劃基線、性能度量基線)一起使用。
  7. Some variances you should look for when comparing your updated schedule to the baseline plan include

    在比較更新日程和比較基準計劃時,需要查找下列差異:
  8. Variances occur when you set a baseline plan and begin entering actual information into your schedule

    在設置了比較基準計劃后開始將實際信息輸入到日程中時,會產生一些差異。
  9. After you save a baseline plan and begin updating your schedule, you may want to periodically save an interim plan

    保存比較基準計劃並開始更新日程之後,或許需要定期保存中期計劃。