beam plan 中文意思是什麼

beam plan 解釋
梁布置圖
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. In this article, the current status of epithermal neutron beams in the world is reviewed and also the design and construction plan of the epithermal neutron beam at the tsing hua open - pool reactor is reported

    本文將介紹世界各國在設計建造超熱中子照射管之現況,以及目前在國內清華水池式反應器建造超熱中子照射管之進展及計劃。
  2. In this thesis, ga is used to optimize the beam weights of intensity modulated radiation therapy ( imrt ) inverse planning, and 2d and 3d isodose contour as well as dose volume histogram ( dvh ) are used to evaluate the treatment plan

    本文應用遺傳演算法優化逆向調強放療計劃中射束的權重,用二維等劑量線、三維劑量分佈和劑量體積直方圖來評估計劃的優劣。
  3. The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent

    本文結合湖南省建設科技計劃項目「永久性肋樑柱錨桿擋土墻設計關鍵問題及計算軟體開發」 ,對預應力肋樑柱錨桿支擋結構進行了理論分析,提供了適合於工程的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一定的理論依據和設計建議。
  4. In enforcement plan, the beam and protect plate, and random resistance are analyzed, in which the normal random variable and maximum stress element as evaluation standard are considered

    研究了爐墻的改造,梁和護板的改造、腐蝕嚴重的部位的加固方案,分析了梁、柱改造方案的隨機抗力。
  5. At first, the author analyzed some chief factors such as light beam drift and atmospheric turbulence that affect the precision of the laser collimation in brief. then, the author studied the plan of the laser collimation generating nondiffracting beam and automatic level system with high precision. at last, the author completed the measurement of the straightness guideway by using ccd ( charge coupled device ) as the receiver and computer imaging processing

    文章首先簡要地分析了激光自身漂移、大氣湍流等影響激光準直精度的主要因素,然後對系統的激光準直方案進行論證,並確定了無衍射光束的生成方案、高精度自動安平系統的結構方案,最後以ccd為接收器件,通過計算機圖像處理,完成對軌道直線性的測量。
  6. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。
  7. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  8. According to the dalian - old iron mountain canal situation, considered changes the drinking water the transport node, by captain, the beam, the drinking water and the speed carries on the body form plan as the variable the combination

    摘要根據大連灣老鐵山水道的情況,考慮變吃水的運輸方式,以船長、船寬、吃水及航速作為變量來進行船型方案的組合。
  9. This paper introduces several experiences of hard horizontal beam erection from construction preparing, safety measures, and the emergency plan, etc., and analyzes on some existing problems and advances some suggestions

    從施工準備、安全措施、應急預案等方面介紹了硬橫梁架設中的幾點經驗,分析了存在的問題並提出了建議。
  10. Cause analysis of flange plate shear fracture and reinforcement plan selection of a t beam bridge

    梁橋翼緣剪切斷裂原因分析與加固方案選擇
  11. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩定性分析的基礎上,以邊坡穩定性最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加固防治方案:框架梁+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加固工程的具體布置時是否存在不穩定體從錨索或框架梁的薄弱部位剪出的可能性等一些細部措施,以達到合理設計,有效及經濟治理的目的。
  12. Finally, introduces the electric circuit realization of the transmitter principle prototype in the multi - beam bathymetric system. the hardware development divides into three modules to carry on, respectively was the module of signal occurrence, the central controller and the the module of power enlargement, the article separately discussed each module principle of work and the realization plan

    最後,介紹了多波束測深系統中發射機的原理樣機電路設計與實現,硬體研製分為三個模塊進行,分別是信號發生模塊、系統控制器和功放模塊,文章分別討論了各個模塊的工作原理和實現方案。
  13. Cultural relics experts climbed scaffolding that had been erected, surveyed data on the damaged section of the beam, and deliberated a plan for its restoration

    文物專家當場爬上搭起的腳手架,測量橫梁受損切面數據、研究修繕方案。
  14. The earthquake responses of the asymmetric - plan structure are researched and the main factors that influencing the structure ' s response are established. the influences of the earthquake type and the earthquake input in two directions are also researched. the effectiveness of regulation for the irregular rc frames in the code for the seismic design ( gb50011 - 2001 ) is discussed using the flexibility - based fiber - models beam - column elements in the 3d nonlinear analysis program

    本文結合國家自然科學基金資助項目「結構非線性地震扭轉作用和扭轉效應的研究」 (項目批準號: 59978055 ) ,對平面不規則結構的地震反應規律進行了深入研究,明確了影響平面不規則結構地震反應的主要結構參數,研究了不同地震動類型和雙向水平地震輸入對結構扭作用和扭轉效應的影響;採用基於有限元柔度法的纖維模型樑柱單元,建立鋼筋混凝土框架結構三維非彈性地震反應動力分析程序,對依據我國建築抗震設計規范( gb50011 - 2001 )設計的不規則結構進行地震反應模擬分析,討論了現行設計方法的有效性。
  15. Then we also study the effect of string on the dynamical characteristic under the symmetric load and not under the symmetric load as the prestressing is the key making beam string structure the balanceatie system, having large rigidity and embodying the superiority of dynamical characteristic of this structure, this paper studies and conceives how to deteimine the number of the prestressing in each stage of construction and through comparing between the plan of onetime and repeated pulling construction choose the suitable pulling construction plan

    並且本文還研究了在對稱荷載和不對稱荷載兩種工況下,結構的受力性能隨豎向撐桿數目、結構垂跨比以及下弦索預應力等參數改變時的變化情況,總結出該結構受力方面的特徵,為實際工程設計提供依據。鑒于預應力是使張弦梁結構形成自平衡體系、具備較大剛度和體現結構性能優勢的關鍵,本文研究和探討了結構施工各階段該預應力大小的確定方法,通過一次張拉與二次張拉方案各項指標的比較,選擇適當的預應力張拉施工方案。
分享友人