bed section 中文意思是什麼

bed section 解釋
下節梯
  • bed : n 1 床,床鋪;床位,鋪;(動物的)窩;〈比喻〉安樂窩,墳墓;床墊;睡眠;就宿。2 婚姻,夫婦關系。3...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. Notice some corners much and much, will have already concealed to see a point to test you to probe an ability, a very divertive game. find out 12 kind things in the room first, there are more difficult several kinds to seek. bring about a pillow, the blind side that click the bedside and mattress contain one section battery, another a the section battery is also nearby in the bed, turning on a television, there is one personal dancing, he will point out a place finally, there is the star number manifestation, notice and wait film to broadcast to finish to click again 3 times, the safe - deposit box would appear

    多多注意一些角落,會有隱藏視點考考你的偵察能力,非常好玩的一個游戲.先在房間里找到12樣東西,有幾樣比較難找.把枕頭掀起,點擊床頭和床墊的縫隙處有一節電池,另外一節電池也在床附近,打開電視,有一個人跳舞,最後他會指出一個地方,有星號顯示,注意要等影片播放完再點擊3次,保險箱才會出現!
  2. An algorithm for generating section line based on tin of coal bed

    模型的剖面線生成演算法
  3. Under general geological study of exploratory development of coalbed gas and underground gasification of coal bed in eastern depression of liaohe basin, authors apply the basic principle of coal geology and the data of vitrinite reflectance and technical analysis of coal to ascertain that coal classification are dominantely the lignite, long - flame coal and gas coal of coal - bearing upper section of third member of shahejie formation, and then dissertate the variational regularity between coal rank and buried depth in vertical and otherness of vertical limit of coal rank in different coal - rich regions

    摘要運用煤田地質學基本理論和煤的鏡質組反射率值及工業分析等有關數據,確定了遼河盆地東部凹陷古近系沙三段含煤亞段的煤種主要為褐煤、長焰煤和氣煤;進而闡述了該煤段垂向上煤級與埋深的變化規律性、不同賦煤區各煤級垂向界限的差異性。
  4. 1. comparing reservoir beds in details step by step, we have divided and compared the deposition time unit in guan 3 - 6 sandstone bed sets, which has been divided into 20 small beds, 30 time units : rebuilding oil sandstone body data table, building graph database, further analyzing the level and section plane configuration and combination pattern of sandstone, and deducing the maze reservoir geology model of river sandstone, are the most important basis for oil reservoir description and residual oil distribution study

    1 、採用儲層逐級細分對比方法,對館3 - 6砂層組進行了沉積時間單元的劃分對比,共劃分出20個小層、 30個時間單元;重新編制了油砂體數據表,建立了圖表數據庫,並進一步分析了單層砂體平面、剖面形態以及砂體組合模式,總結出河道砂體屬迷宮式儲層地質模型,這是精細油藏描述及剩餘油分佈研究的最重要基礎。
  5. Then river width increased and the intensity of deep point lowing and bed material coarsening decreased and water level lowed continuously. so the bed form changed toward to u type. the bed regulation is realized through sediment silting in different parts in cross section during silting period and the deformation of bed form changed from broad u type channel to narrow and deep v type channel

    研究表明,河道在持續沖刷前期深泓點及水位下降與河床粗化同步發展,河床向v型發展;沖刷後期深泓點下降、河床粗化減弱,河道展寬增大,水位繼續下降,河床向u型發展;在以淤積為主時期的調整,是通過斷面不同部位的淤積來實現的,但都是由u型較大河槽向v型窄深小槽發展。
  6. The verification results show that the model can simulate well the tidal levels, current velocities, sediment concentration, bed load transport, diversion ratio in the bifurcation section, topographic change of the north and south channels, as well as sudden siltation caused by typhoons

    大量實測資料驗證表明,該數學模型可以較好地模擬長江口地區的潮位、流速、流向、含沙量、底沙、分流比、南北槽地形變化和臺風暴潮造成的航道驟淤情況。
  7. Through checking computations, it was shown that the analogue accuracy of the model was quite high, which can provide important basis for scientific decision - making on engineering measures. through analogue calculation and analysis of many regulation schemes, it was shown that combining the diversion weir works with the bed fixing works at the south branch is reasonable and feasible in the implementation of loushuikouzi river regulation works. in addition, it is suggested that the bed fixing works at the south branch should adopt the improved compound section scheme

    經對多個整治方案的模擬計算與分析,表明漏水口子河道整治採用分流魚嘴工程和南汊固床工程相結合的整治工程措施是合理可行的,通過模型計算研究還提出了南汊固床工程採用復式斷面形式的改進方案建議,該方案保證了南汊枯期通航和不斷流,而且對南汊及撫遠鎮的保護具有正面作用。
  8. The effect of overburden separation dynamic development under key stratum on grouting for bed separation space was analyzed, in order to deal with the problem that the current bed separation growing technology can not prevent the key stratum from breakage, put forward the isolated section - grouting technology for overburden bed separation space, integrated the virtue of growing for bed separation space and partial extraction, the bed separation grouting bodies, key stratum and isolated section pillars were made to constitute the load - carrying body all together, and to reach the purpose of reducing subsidence effectively, increase the coal seam extraction ratio, and accelerate the development of isolated section - growing technology for overburden bed separation space

    摘要分析了關鍵層下離層動態發育對離層充填的影響,針對目前離層區充填工藝不能阻止覆巖關鍵層初次破斷的問題,提出了「覆巖離層分區隔離注漿充填」技術,它綜合離層充填與條帶開采技術的優點,通過離層區充填置換或減小分區隔離煤柱寬度,使「離層區充填體關鍵層分區隔離煤柱」形成共同承載體,從而達到有效減緩地面沉降的目的,提高了煤層采出率,促進了覆巖離層充填減沉技術的發展。
  9. Guide for the procurement of power station equipment - boilers - boilers with fluidized bed firing - section 3 : boilers with fluidised bed firing

    發電站設備采購指南.鍋爐.流化床燃燒鍋爐.第3節:流化床燃燒鍋爐
  10. Analysis on separation process of three - section simulated moving bed chromatography

    三帶模擬移動床色譜分離過程的實驗分析
  11. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  12. The reason to creates this kind of destruction to be very many, the main of them is that the apron partially has not been able fully to display it to eliminate energy affect so causes the ditch bed to wash out, forms flushes the pit, leading to the apron, to guard against flushes the trough and both banks slope protection destruction, for a long time, disappear power design of plunge basin and layout have been focused on disappear power. but not to give the enough value on uses the sea to inundate the section to disappear power and adjust speed to reduced downriver washes out

    水閘閘下沖刷破壞的部位絕大多數發生在消力池下的海漫和防沖槽處,造成這種破壞的原因很多,其中很大一部分是由於海漫部分未能充分發揮其消能作用而引起渠床沖刷,形成沖坑,導致海漫、防沖槽及兩岸護坡的破壞。一直以來,人們把消能的研究重點放在消力池的消能設計及平面布置上,而對海漫段消能及調整流速功能研究甚少,至於對海漫加糙水流運動建立數學模型,在國內外還很少見相關的論文資料。
  13. The random mathematical model is described using equivalent markov equations. the time and state parameters are discrete. based on the model, the flow rate distributions along radial and average at any height can be calculated directly, moreover, the probability transition matrix of the flow can be determined via the statistic character of the random cumulate particles, and be corrected by s. cd the random theoretical model shown in fig. l, the section of the bed of tbr is divided into a series of concentric circles

    一、在常溫和常壓下進行滴流床反應器流率分佈的研究,以狀態離散、時間離散的齊次markov過程描述了滴流床在滴流區的流率分佈,建立了滴流床在滴流區流率分佈的隨機模型,根據此模型可以: 1 、可直接確定任一高度下的液體徑向流率分佈及平衡流率分佈; 2 、液體流動的概率轉移矩陣可由隨機堆積顆粒的統計特性確定,以參數s修正。
  14. And also about the objective conditions for developing is given to the well consolidation technology with sand - packs in soft foundation treatment area and the consolidation technology with cement - mixed piles in transitional section of road and bridge areas, and the detailed introduction is also given about workmanship for filling works in subgrade body, for filling works in transitional sections of the subgrade, and for construction of base bed of the subgrade. in each part caution items in the construction and the relevant technical issues are summarized

    然後著重介紹了秦沈客運專線一般軟土地段地基處理袋裝砂井加固技術、路橋過渡段水泥攪拌樁加固技術,並對路基本體填築施工工藝、路基過渡段填築施工工藝,路基基床施工工藝也進行了詳細的介紹,在每一部分中對施工注意事項及有關技術問題進行了總結歸納。
  15. There are several important issues to that attention should be paid in the design of test bed, such as the measurement of the temperature difference between the inlet and outlet of test section and the temperature of cooling water in the inlet and outlet of condensing tubes, filled volume of the steam boiler and its level control, the determination of the natural acting head of high temperature tank and design of the cooling water flow of measuring tank

    試驗臺由高溫工質自然循環子系統、冷卻水機械循環子系統和計算機監測控制子系統構成,試驗段進出口溫差及冷凝管進出口溫度的測試、蒸汽鍋爐充注量及液位控制、高溫水箱自然作用水頭的設計、冷卻水流量計量水箱的設計等是試驗臺設計中值得重視的問題。
  16. In this paper, gravel characteristics and variety along the river were studied with digital image technology ; variety of grain sizes distribution of the river bed along jinmahe section in minjian river was analyzed ; several representative formulas of bedload transport rate were proved according to the field data of dujiangyan

    本文採用數字圖象技術研究了卵石顆粒的幾何特徵及沿程變化;分析了岷江金馬河河段河床質級配的沿程變化;根據都江堰的輸沙率資料論證了幾家有代表性的推移質輸沙率公式的實用性。
  17. The main contents are as follows : section - of theory of sediment transportation - on the basis of comprehensive review of the study achievements on sediment transport, pros and cons in using classical regression model based on lms during establishing formula in sediment incipient motion and bed - load transport rate ; experiment data in non - uniform sediment with a wide distribution in flume experiment of stead sediment transportation are been collected and coordinated

    本文的主要內容包括:泥沙輸移理論部分:對前人的相關泥沙起動輸移研究結果總結性的回顧,分析了採用最小二乘法的傳統回歸模型在泥沙起動公式和輸沙率公式處理中的四川大學碩士學位論文人工神經網路理論及其在泥沙科學中的應用研究優點和缺點:收集並整理了兩組平衡狀態下的輸沙試驗資料。
  18. Abstract : based on set up a three - section simulated moving - bed system, the separation process and principle and the effects of the main operation parameters of the b - type three - section smbc are analyzed carefully. the switch time and the column asymmetry are discussed. these analysis were proved by the actual separation experiments of biphenyl and fluorene on the smbc system

    文摘:在自行設計組裝的一套三帶模擬移動床色譜系統基礎上,對三帶模擬移動床色譜系統的分離過程和主要的操作參數切換時間及柱不對稱性的影響作了比較詳細的分析.通過具體的分離實驗,驗證了三帶模擬移動床色譜的主要操作參數切換時間對分離結果的影響
  19. This paper introduce the test and application situation of some new techniques in the stone roadbed blasting of the seventh bidding section of the electrized speed increasing modification works of zhegan railway such as adding the flexible cushion on the hole - bed, making the smooth blasting, making the large - area multi - row short - delay loose blasting, and making the single - hole one - by - one blasting network, etc

    介紹了浙贛鐵路電化提速改造工程第七標段石方路基爆破中,孔底加設柔性墊層、光面(預裂)爆破、大區多排微差松動爆破、單孔逐個起爆網路等新技術的試驗和運用情況。
  20. The extreme effects of sand mining on local deformation of riverbed and evolution of river stretch in typical river sections such as straight river section, river bend and river fork are experimentally studied in micro - scale loose bed hydraulic model

    摘要採用微尺度動床河工模型試驗的方法研究了在順直、彎道與分汊等典型河道不同部位進行大規模采砂對河床局部變形及對河段變形的極限影響。
分享友人