blueprint machine 中文意思是什麼

blueprint machine 解釋
曬圖機
  • blueprint : n. 藍色照相,藍色版;藍圖,設計圖;計劃大綱;原本。2. vt. 為…制藍圖;曬(圖);為…制訂計劃。
  • machine : n 1 機(器),機械;機關,機構。2 印刷機器;縫紉機;打字機;汽車;自行車;三輪車;飛機;〈美俚〉...
  1. According to the parameter we carries on the structure, the hydraulic system design and the blueprint, making this machine realize rotary drilling movements, break the frozen coal and unload the frozen coal to the outside of rail car ; carries on the processing, the assembly and the debugging of this machine

    根據得出的參數進行結構和液壓系統的設計,繪制圖紙,使該機實現旋挖進給運動,破碎凍煤和凍煤卸車;進行零部件進行加工、裝配,經過樣機調試,達到了設計的目的。
  2. The general idea that the environment could affect the relative concentrations of competing transition molecules ? and thus affect the computation ? had already been suggested in the blueprint for the molecular turing machine

    在設計分子塗林機器的藍圖時,已經有人提出,環境可能會影響競爭狀態下過渡分子的相對濃度(也因此影響計算結果) 。
  3. Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out

    答:預備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護裝置或有聯跳迴路保護裝置,應編制試驗方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。
分享友人