body of wall 中文意思是什麼

body of wall 解釋
墻身
  • body : n 1 身體,體軀,肉體;屍首;軀干,【林業】立木。2 本體,主體;主力;本文,正文;部分。3 (衣服的...
  • of : OF =Old French 古法語。
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. An oes with a large capacious head, good pigmentation, wall eye or brown eyes, nice length of neck, correct angulation of the front and rear legs, good lay of shoulders, good quality and texture to the coat, nice topline, strong truncated muzzle with correct bite, compact body with enough leg under them, sound movement with good side extension and so on and so on is what makes an oes an oes !

    翻譯:一個有大容量腦子,良好色素,藍色或者棕色眼睛,美好長度的脖子,角度正確的前後腳,好的層次的肩,高質地的毛,美好的背線,強壯,短小,有適當咬合線的嘴,結構緊湊的身體,迴旋的聲音等等才是古牧的標準和特色。
  2. The anticlinal wall of a cell is perpendicular to the surface of the plant body

    細胞的垂周壁垂直於植物體的表面。
  3. The actor became typed in intense, neurotic roles for the next several years : in films he portrayed the obsessed father of a girl whose soul has been transferred into the body of another child in audrey rose 1976, an off - the - wall ventriloquist in magic 1978, and the much - maligned captain bligh opposite mel gibson s fletcher christian in bounty 1982

    1992年,安東尼霍普金斯以其在沉默的羔羊the silence of the lambs 1991一片中的傑出表現獲得了第64屆奧斯卡最佳男主角獎的殊榮。他是奧斯卡歷史上第三位獲此榮譽的英國演員。
  4. To the house of bricky structure, rock - bottom wall body area is large, the wall body area of superstratum is small, so similar unit, upstairs and downstair cover inside practical area or meeting discriminating ; same layer will tell, although be covered identically inside floor area, cover the unit of the unit inter of horn that compare clip inside usable floor area also is met a few smaller

    對磚結構的房子來說,底層的墻體面積厚,上層的墻體面積薄,所以同樣的單元,樓上樓下的套內實用面積還是會有差別的;同一層來講,即使相同的套內建築面積,把角的單元比夾在中間的單元套內使用面積也會小一些。
  5. Considering the special structure of multi - ribbed slab, founding diphase body mechanical model of compound material, strengthening rib beam and rib pillar by equivalent volume ratio of concrete and slice brick, the paper drew elastic compution constant and shear constant. based on the things, the paper simplified isotropy compution model to wall, gave practical design formula of elastic mold and shear mold, provided necessary parameter for practical design formula of elastic rigidity. finally the calculating results agree well with the text results

    結合密肋復合墻板的特殊構造,建立墻板的復合材料二相體力學模型,按照混凝土與砌塊體積比不變原則對肋梁肋柱同時加強,得出墻板的彈性計算常數及剪切常數,在此基礎上,進一步將墻板簡化為各向同性的計算模型,給出墻板彈性模量及剪切模量實用計算公式,為密肋復合墻板的實用彈性剛度計算公式提供必要的參數。
  6. Studies on the extraction and enzymology character of the crude protease from the body wall of holothurian

    海參體壁粗蛋白酶的提取及酶學性質研究
  7. Design of hot extrusion mould of roughcast of multi - joint thin - wall brazen valve body

    多接頭薄壁銅閥體毛坯熱擠壓模設計
  8. Due to the requirements of complex configuration of spatial curved surfaces and of continuity of fiber laying have becoming a difficult problem in cad technology for bicycle body frame of hybrid fibered compound material with multi - branch special shaped entire - body and sections of hollowed thin wall

    摘要對于多分支整體異形空心薄壁斷面混雜纖維復合材料自行車車架,由於復雜的空間曲面構形和纖維鋪設連續性要求成為其cad技術難題。
  9. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  10. The crowd filed up the aisles : the aged and needy postmaster, who had seen better days ; the mayor and his wife - for they had a mayor there, among other unnecessaries ; the justice of the peace ; the widow douglass, fair, smart, and forty, a generous, good - hearted soul and well - to - do, her hill mansion the only palace in the town, and the most hospitable and much the most lavish in the matter of festivities that st. petersburg could boast ; the bent and venerable major and mrs. ward ; lawyer riverson, the new notable from a distance ; next the belle of the village, followed by a troop of lawn - clad and ribbon - decked young heart - breakers ; then all the young clerks in town in a body - for they had stood in the vestibule sucking their cane - heads, a circling wall of oiled and simpering admirers, till the last girl had run their gantlet ; and last of all came the model boy, willie mufferson, taking as heedful care of his mother as if she were cut glass

    人們簇擁著順著過道往裡走:有上了年紀的貧苦的郵政局局長,他曾經是過過好日子的有鎮長和他的太太這地方竟然還有個鎮長,這和其他許多沒有必要的擺設一樣有治安法官有道格拉斯寡婦,她來歲,長得小巧而美麗,為人寬厚,慷慨大方而又心地善良,生活還算富裕,她山上的住宅是鎮上唯一漂亮講究的,可算得上殿堂,每逢節慶日,她可是聖彼德堡鎮上人們引以為榮的最熱情好客最樂善好施的人有駝背的德高望重的華德少校和他的夫人還有維爾遜律師,一位遠道而來的新貴客。再下面就是鎮上的大美人,後面跟著一大幫穿細麻布衣服扎著緞帶的讓人害單相思病的年輕姑娘。跟在她們后里的是鎮上所有年輕的店員和職員,他們一涌而進原來他們是一群如癡如醉的愛慕者,開始都站在門廊里,嘬著自己的手指頭,圍在那兒站成一道墻似的,一直到最後一個姑娘走出他們的包圍圈為止。
  11. Changes of some biochemical estimates in the hemolymph and body wall of dendrolimus punctatus infected by metarhizium anisopliae

    馬尾松毛蟲感染綠僵菌后某些生化指標的變化
  12. Aimed at the high temperature at furnace roof and wall, great lost of body heat radiation, poor leading heating ability and long soaking time, the compound ceramic fiber coating is used to hold temperature of furnace roof and wall, make the heating loss dropped, shorten soaking time, improve heating ability and reduce evergy consumption

    摘要針對環形爐爐頂爐墻表面溫度高、爐體散熱損失大、導致加熱能力低、待溫時間偏長的問題,選用了復合陶瓷纖維保溫塗料,使爐體散熱損失減少,待溫時間縮短,加熱能力提高,且能耗降低。
  13. The blue color and the green suit the dining room ground, may let the human body be able to arrive the countryside style joyfulness and the comfort, this series wall, brick, but also easy to let the human associate the sky profound and prairie vast ; the red series place brick, causes the ground to look very special, some one kind of magnificent feeling ; the pessimistic series place brick, has the cultural personal status and the nature character and style ; black and white contrast, may increase the ground the sense of depth and the structure feeling

    藍色和綠色適合餐廳地面,可讓人體會到田園風格的愉悅和舒適,這個系列的墻、地磚,還容易讓人聯想到天空的深邃和草原的遼闊;紅色系列的地磚,使地面看上去很特別,有一種華麗的感覺;灰色系列的地磚,更具文化品位和大自然風情;黑與白的對比,可增加地面的層次感和結構感。
  14. Industry : it has five solely - owned enterprises of carbon, thermal power, light steel, pressure vessel and wall body material and six enterprises with participating shares of shandong dongyue chemical industry co., ltd, printing center of newspaper office in the middle part of shandong, sida electric, plough textile company, xinquan cast iron co., ltd, laiwu kaiyuan wanxi company

    工業:擁有炭素、熱電、輕鋼、壓力容器、墻體材料等5個獨資企業,山東東岳化工股份公司、魯中晨報印務中心、思達電氣、北斗星紡織公司、鑫泉鑄鐵有限公司、萊蕪開源萬鑫公司等6家參股企業。
  15. Aimed at tube curve by sun shining, it analyzes and calculates the instance of curve when tube up and down face have difference in temperature, and discourses upon it influenced degree to cannon firing accuracy. for hot spread asymmetry caused tube curve, it explains it ' s form cause. for irregularly hot stress acting tube curve, it stressfully analyzes effect of body tube wall thickness difference

    重點分析了身管熱彎曲產生機理,針對太陽照射下的身管彎曲,分析計算了身管上下表面存在溫度差時的彎曲情況,論述了其對火炮射擊精度的影響程度;對于散熱不均引起的身管彎曲說明了其形成原因;對于不規則熱應力作用下的身管彎曲重點分析了身管壁厚差的作用。
  16. Through the analysis and studying of this subject, we can make conclusion as followed : during the whole heating season, the change law of the energy consumption of the thermal bridge is with the change law of the meteorological condition inside and outside the room : when airs temperatures indoor is steady, thermal bridge energy consumption increases with reducing of air temperature outside the room, reduce oppositely. the different position and the different structure patterns of the thermal bridges, even under the same meteorological condition inside and outside of the room, energy consumption of the building is different, and impact on heating energy consumption is different, this is mainly caused by the difference of the constructs thermal bridge and different influence in term of out wall, which lead to total mean heat - transfer coefficient different, when the heat - transfer coefficient is relatively small of outer wall, the impact of wall body is more obvious on heat - transfer coefficient of the thermal bridge

    然後確立了在節能建築中熱橋耗熱量與室內外氣象參數和熱橋構造型式的關系,分析與研究並得出:在整個採暖季節中,熱橋的能耗隨著室內外氣象條件的變化規律是:在室內空氣溫度一定時,熱橋能耗隨著室外空氣溫度的降低而增大,相反減小;不同部位的熱橋,其構造型式不同,即使在相同的室內外氣象條件下,產生的能耗也是不同的,並且對採暖能耗的影響也不同,這主要是由於不同構造的熱橋對外墻的總平均傳熱系數的影響不同所造成的,並且當外墻主體的傳熱系數較小時,熱橋對墻體的傳熱系數的影響更加明顯。
  17. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  18. There is no thoroughly rounded theory about displacement ventilation system in our country at present and our research begins recently. the study work of this paper will be useful for further optimization design of displacement ventilation system. this dissertation includes five parts. the first part introduces the development of the displacement ventilation and the background of research in domestic and oversea. in the second part, it gives working principle of displacement ventilation system and it ’ s advantages to the mixture ventilation. the study also gives a series of indexes to evaluate displacement ventilation system and specifies air supply terminal device and so on. it is needed to simulate and analyse the velocity field, temperature field and distribution of flow field. this is the third part. the forth part specifies the simulative method for thermal stratification of displacement ventilation system. it gives some factors affecting thermal stratification height such as inlet temperature, inlet velocity, heat transfer of wall body, distance of heat source and so on

    本文的研究工作主要包括以下幾個方面的內容: ( 1 )綜述了國內外相關的研究現狀和研究背景; ( 2 )簡介了置換通風的工作原理,並分析了它相對于混合通風的優良特性及評價指標、末端裝置等; ( 3 )對採用置換通風方式房間的溫度場、速度場和氣流分佈進行了模擬計算與分析; ( 4 )對採用置換通風方式房間的熱力分層高度進行了模擬計算,並分析其影響因素,如:送風溫度、送風速度、圍護結構傳熱和熱源分佈等; ( 5 )擬合了無量綱熱力分層高度相應于送風溫度t 、送風速度v 、熱源間距離l和圍護結構傳熱q的經驗公式。
  19. His excellency wants to be turned over on the other side, whispered the servant, and he got up to turn the heavy body of the count facing the wall

    「老爺想把身子轉向另一側啦, 」僕役輕聲地說道,他站了起來,讓伯爵把臉部向墻,將那沉重的身軀側向另一邊。
  20. The main body of the wall was engraved with nine huge dragons

    北海九龍壁建於西元1756年,已有二百多年歷史。
分享友人