bogie frame 中文意思是什麼

bogie frame 解釋
轉向構架
  • bogie : n. 1. = bogy. 2. 【鐵路】轉向架。3. 〈美空軍俚〉來路不明的飛機。4. 〈英口〉(運石料等的)低座四輪卡車。
  • frame : n 1 機構;組織;系統。2 結構,框架,構架,骨架,骨骼。3 體格,身軀。 4 精神狀態,心情。5 【園藝】...
  1. This paper expounds the characteristics about the body and the bogie of a vehicle for light rail transit, including the dimensions of the body, the layout within the body, the materials of the body, the structure of high and low floor cars, the arrangement of the doors, truck frame, the flexible suspension of motors and the drive, radial truck and independent wheel brake equipment, etc., intimates the consideration of future manufacture and technical exploitaion

    摘要闡述了輕軌車輛的車體及轉向架的特點,包括車體尺寸、車內布置、車體材料、高低地板車的結構、車門設置、轉向架構架及懸掛裝置、彈性車輪、牽引電動機懸掛及驅動、逕向轉向架及獨立車輪、制動裝置等。
  2. The conclusions drawn in this thesis can provide reference for design and calculation of bogie frame

    本文得到的結論,對轉向架構架的設計和計算具有借鑒和參考價值。
  3. As one of the most important necessary part of high speed locomotive, the bogie frame ' s property has significant impact on running quality and safety of locomotive. on the basis of making detailed finite element analysis and accessment of it ' s mechanic property, the design theory of frame has been probed. such work is of momentous significance in pushing forward the development of high speed train in china

    轉向架構架是高速機車最關鍵的部件之一,其性能對機車的走行品質和安全性具有重要影響,對構架結構進行詳細的有限元分析並對其力學性能進行評定,在此基礎上對構架的設計計算理論進行探索,對推動我國高速鐵路的發展具有重要意義。
  4. By inputting impulsive excitation, the dynamic simulation of vertical wheel / rail force, wheel / rail contact stress and accelerations of axle and bogie frame for resilient wheelset system is carried out and the results are analyzed and compared with the system of rigid wheelset. in additions, the stiffness of rubber is optimized

    其次通過輸入脈沖型激擾,對彈性輪對車輛軌道垂向耦合系統進行了輪軌力、輪軌接觸壓力和車軸及構架加速度的動力學模擬,並與剛性輪對車輛的計算結果進行了比較和分析,優化了橡膠的剛度。
  5. Based on studying the present situation of codes for design on bogie frame, the deficiencies in current codes are pointed out and the necessity for formulating code for design and calculation of bogie frame is also discussed

    在此基礎上,分析了我國轉向架構架設計計算規范的現狀,通過比較分析,指出了用現行規范作為計算規范的不足之處,探討了制定我國的轉向架構架設計計算規范的必要性。
  6. Verification regulation of special measurement tools for zhuan 8a bogie side frame

    轉8a側架專用量具檢定規程
  7. Finally, intensity of the frame that is the most complex component of a bogie is analyzed

    最後,對轉向架中受力最為復雜的構架進行了強度分析。
分享友人