building section 中文意思是什麼

building section 解釋
施工單位
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受應自建築線或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計施工編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  3. Gf of shop c and gf & cockloft of shop d, on lok building, d. d. 6 lot 1211 section c, kau hui chik kai, tai po, n. t

    新界大埔舊墟直街第6約第1211號地段c部份安樂樓c鋪地下及d鋪地下及閣樓
  4. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  5. On the structural design of chongqing grand theater, german architect request adopt not only shear wall around the building, but also frame columns whose cross section is gracile ( b h = 400mm 1000mm )

    在重慶大劇院結構設計中,德方建築師要求除建築物周邊採用剪力墻以外,中間框架部分全部採用細長截面( b h = 400mm 1000mm )框架柱。
  6. To do the investigating and studying work about the achievements of tackling key problem of the quondam exploration of front - zone of mountain, to analyze and study the applicability about the gathering technology used in the seismic exploration of the complicated construction belt of front - zone of mountainous ; 2. combining the quondam achievements, researching the design method of observation system objective of the complicated construction belt based on seismic - geology model, firstly, building the surface level and deep layer seismic - geology model of complicated construction belt and analyzing the forward model, secondly, designing the observation system aiming at the overthrust nappe structure in section and in area ; 3. aiming at the complicated earth ' s surface condition of front - zone of mountain, how to select the exciting method and the parameter, how to optimize the environment of exciting method and reception, how to pledge the normal combination of the datum of different exciting method ; 4

    根據山前帶的地震地質條件特點,本文主要研究了以下幾個方面的內容: 1 、對以往山前帶地震攻關成果開展調研工作,分析研究在山地山前復雜構造帶所採用的地震勘探採集技術的適用性; 2 、研究基於地震地質模型的復雜構造帶觀測系統目標設計方法:如何建立復雜構造帶的表層、深層地震地質模型,利用正演分析目標區的觀測系統;針對逆掩推覆體構造,如何分區分段有針對性設計觀測系統等; 3 、針對復雜地表條件的山地山前帶,如何選擇激發方式、參數,如何優選激發、接收環境,如何保證不同激發方式的資料能正常拼接; 4 、山前帶巨厚礫石區的表層結構調查技術及靜校正方法研究。
  7. The campus is composed of academic section ( teaching buildings ), comprehensive section ( auditorium, office building and library ), residential section ( dorm for college staff and students, dinning rooms and activities center ) and sports section ( palaestra, open air playground and other fields for sports )

    校園分為教學區(公共教學樓群) 、綜合區(禮堂,辦公樓,圖書館) 、生活區(教工宿舍、學生公寓、食堂、活動中心) 、運動區(體育場、風雨操場和其他運動操場) 。
  8. Different drilling fluid systems have been used in the horizontal well drilling in north tarim area, more specifically, polymer drilling fluid is used in the top hole of large size, and polysulfide drilling fluid for the lower interval ; for the building section and horizontal interval, polysulfide drilling fluid mixed with oil is used

    塔北地區水平井上部大井眼採用聚合物鉆井液體系、下部井段採用聚磺鉆井液體系、造斜段及水平段採用聚磺混油鉆井液體系。
  9. 1. comparing reservoir beds in details step by step, we have divided and compared the deposition time unit in guan 3 - 6 sandstone bed sets, which has been divided into 20 small beds, 30 time units : rebuilding oil sandstone body data table, building graph database, further analyzing the level and section plane configuration and combination pattern of sandstone, and deducing the maze reservoir geology model of river sandstone, are the most important basis for oil reservoir description and residual oil distribution study

    1 、採用儲層逐級細分對比方法,對館3 - 6砂層組進行了沉積時間單元的劃分對比,共劃分出20個小層、 30個時間單元;重新編制了油砂體數據表,建立了圖表數據庫,並進一步分析了單層砂體平面、剖面形態以及砂體組合模式,總結出河道砂體屬迷宮式儲層地質模型,這是精細油藏描述及剩餘油分佈研究的最重要基礎。
  10. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  11. Article 14. whenever units involved in matters such as national affairs, economic construction, building the national defense, and advanced science and technology are registered, evidence of the approval of the chief administrative section should be shown

    第十四條涉及國家事務、經濟建設、國防建設、尖端科學技術等重要領域的單位辦理備案手續時,應當出具其行政主管部門的審批證明。
  12. The eutrophication of taihu lake is a representative ecological problem, so it can be controlled by some ecological control. countermeasures, such as resuming aquicolous vegetation, restricting the area of breed aquatics in the taihu lake, biologically manipulating alga, building ecological agriculture section around the taihu lake and resuming the zoology of taihu bank

    太湖富營養化是典型的生態問題,因此可通過恢復湖泊水生植被,限制湖泊網圍養殖面積,實施生物操縱控藻,建設環湖生態農業區,恢復湖濱帶生態等生態防治對策加以控制。
  13. ( 3 ) by choosing core faultage of axial site in luohu fracture zone i. e. geological cross section in huangbeiling faultage f8 as geological model and utilizing finite element numerical method, change tendency of huangbeiling faultage f8 under self - weight stress and building loads is stimulated. and long - term development trend of fracture zone is also predicted, which has an important guiding meaning for works of geological disaster prevention in district of luohu jiancheng

    ( 3 )選取羅湖斷裂帶軸部的核心斷層?黃貝嶺f8斷層地質剖面作為地質模型,利用有限元數值方法模擬了黃貝嶺f8斷層在自重應力和建築物荷載共同作用下的變化趨勢,預計出斷層帶的長期發展趨勢,這對羅湖建成區的地質災害防止工作有重要的指導意義。
  14. Officer - in - charge building maintenance section

    建築及維修組組長
  15. This result has practical significance. in this paper ' s theoretical section, base on current shrinkage and creep calculational methods, analysis to the experiment project and tall building structure examples were made, and then the influence of shrinkage and creep to structure stress was put into discussion ; moreover, an fea program was compi led to calculate shrinkage and creep strain considering construction process, and through a tall building instance, the influence to tall frame structure stress was analyzed

    本文的理論部分在現有收縮徐變計算方法的基礎上對本試驗工程和高層建築結構進行了算例分析,通過與彈性計算值的對比,討論了收縮徐變對結構內力的影響,以及計算收縮徐變時是否考慮鋼筋和施工過程對結果的影響;本文還編制了考慮施工過程收縮徐變的有限元程序,並進行了算例分析。
  16. The bar can enhance the bearing capacity and stiffness of the member, so that the cross section area of member can be significantly reduced, and function area of the building can be increased

    由於截面中配置有型鋼,構件的承載能力、剛度大大提高,構件的斷面尺寸大大減少,房間的使用面積明顯增加,房間中的設備、傢具也能更好布置。
  17. By the adjustment of the capital construction and production construction, produce the high level building section and frame product with high additional value mainly, regarding a little amount of industrial section as complement, after 5 - 10 years, the capital construction will become reasonable, and the brand is famous in beijing, tianjing, and hebei, and can produce 20 kiloton model section product and 400 kilo square meter frame and act wall product per year, and can support high level decoration design, section producing and installing etc., and the enterprise has suitable scale and is full of competition ability

    通過資本結構和產品結構的調整,以高附加值的高檔建材、門窗產品為主導,以少量工業材為補充,力爭在五到十年內形成資本結構合理,京、津、冀地區具有較高知名度的集高檔裝飾、裝修的設計、材料生產、製作、安裝為一體的年產銷型材2萬噸、門窗及幕墻製品40萬平方米適度規模的富有競爭力的企業。
  18. The engineering quality certification system is established and improved, including administration responsible system, supervision company control system, building section ensuring system, designer service system, and government quality monitoring system

    建立完善了建管單位負責、監理單位控制、施工單位保證、設計單位服務、政府質量監督相結合的工程質量保證體系。
  19. We should contact with the cooperation company positively, and look for the cooperation opportunity, and create the fund channel by joint venture and cooperation, and change the capital construction, and reform thoroughly ; adjust the equipments, craft, and product construction appropriately, add the product surface process method for expand the product line ; re - make the business process flow, and set up the enterprise ' s core competition ability ; develop the high level building section products with the high additional value, and increase the product profit ability, and make the enterprise shining with vitality

    北京鋁材廠依託自身擺脫困境已經沒有可能,必須把握住劃轉地方、國內外廠商極為看好「奧運」潛在的巨大商機這一契機,積極尋找合作夥伴、尋求合作機會,通過合資、合作打通融資渠道,改變企業資本結構,徹底改制;對設備、工藝、產品結構進行適當的調整,增加產品表面處理手段以拓寬產品線;實施業務流程再造,構建企業核心競爭力;開發高附加值的高檔建材產品,提高產品盈利能力,使企業重新煥發生機。
  20. In the new managerial system, the department in charge is responsible for the mandatory management and supervision of construction unit, building section and construction control unit in the macro field. otherwise, the lareral administration by entrustment is executed by construction unit, building section and construction control unit in the micro field. the system of engineering supervision finds itself in an important position

    新型工程項目建設管理系統將政府主管部門放到了宏觀監督管理的位置,對建設單位,施工單位和監理單位實施縱向的強制性的宏觀監督管理,同時在直接參與項目建設的建設單位、監理單位與施工單位之間又存在橫向的委託性的微觀監督管理,工程項目建設管理系統中的建設監理系統在其中居於核心地位,這種宏觀與微觀相結合的工程建設項目監督管理體制,給我國工程建設領域帶來深刻的變化,有利地促進了工程建設按所要求的目標順利地進行。
分享友人