built-in test 中文意思是什麼

built-in test 解釋
機內測試
  • built : adj. 1. 建造成的,組合的,拼成的。2. 〈俚語〉體型美的。n. 〈俚語〉體型美,肉體美。
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Jx5 microprocessor ’ s testing structure comprises built - in self - test ( bist ), boundary scan and internal scan

    Jx5微處理器的測試結構由bist 、邊界掃描和內部掃描三部分組成。
  2. In this paper we investigate and carry out boundary scan ^ internal scan and built - in self - test three dft technologies in the embedded microprocessor estarl and get satisfying result, the fault coverage is more than 96 %

    本文針對嵌入式微處理器estar1的結構特點,研究並實現了邊界掃描、內部全掃描和內建自測試三種可測性設計技術,取得了良好的效果,故障覆蓋率達到96以上。
  3. In this paper, the author combines the theory analysis with the experiment research method, and discusses the seismic behaviours, 3d elaborate finite element analysis and simplified model analysis of a kind of multi - function tall building - " sub - shearwall supported by frame ", which is applied widely today. the main contents are as follows : in order to observe the failure process and the earthquake response of the complex structure, and to analysis the seismic behaviour of the structural system and structural members, a 1 / 20 cement mortor model of a complex tall - building which is about to be built was producted and the shaking table test of this model under 26 sorts of earthquake loads was made. using sap2000 finite element analysis program, a 3d analysis model was built in computer, and the elastic time - history analysis of the model was done

    本文採用理論分析和試驗研究相結合的方法,研究了目前應用較多的綜合性大廈? ?框支分區剪力墻高層商住樓的抗震性能及空間精細分析和簡化分析方法,主要內容為以下幾方面:對一擬建的復雜高層建築結構,採用1 20比例的空間整體模型,進行了26種工況下的模擬地震振動臺試驗,觀察了結構的破壞過程和地震反應,分析了結構及構件的抗震性能;建立了結構的精細空間模型,利用sap2000n大型有限元分析程序對結構進行了彈性時程分析;通過有限元分析與試驗結果的對比,對結構的抗震性能和抗震能力做出綜合評價,認為該結構由於轉換層上部去掉部分樓板,既可滿足建築設計的通風、採光等要求,又可達到協調結構轉換層上、下樓層抗側剛度的效果,是一種較理想的有多道抗震防線的結構型式。
  4. The dynamic response of the experiment model is studied by transfer function response, and the natural frequency and vibration mode of the vibration system are measured, the dynamic characteristic is mastered, which provides the experiment test method of dynamic data for the structure design of reinforced concrete and the shock absorber design of the system, especially provides the design rules to vibration control of the machine equipment which are built in the building structure

    用傳遞函數響應方法對實驗模型進行動態響應實驗研究,測得振動系統的固有頻率和振型,掌握振動系統的動態特性,為鋼筋混凝土建築的結構設計和系統減振設計提供動力學的實驗測試方法,尤其給安裝在建築物內機械設備的振動控制提供了設計依據。
  5. Built in 1970s, li ' s hardware tool factory has over thirty year ' s experiences specialized on steel file, and the complete equipment and advanced test method guarantee a high quality of their durable products

    中國河北省李氏五金工具廠是專業生產鋼銼的廠家,本廠始建於七十年代,積三十多年之經驗工藝、技術,完整的配套設備,先進完善的檢測手段,經久耐用的產品質量,嚴守信義的企業宗旨。
  6. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  7. Since its release in may, . test has shipped with a set of over 200 built - in coding standards, or language - specific rules that help prevent software errors

    自從五月份發布以來,配備有二百種以上編碼標準組或有助於預防軟體錯誤的語言特定規則的
  8. Not only the scan route solution, the built - in self - test solution and the boundary scan solution of design for testability are summarized, but also the applications and countermeasures of these 3 solutions are analysed and compared in details

    摘要綜述了超大規模集成電路的幾種主要的可測試性設計技術,如掃描路徑法、內建自測試法和邊界掃描法等,並分析比較了這幾種設計技術各自的特點及其應用方法和策略。
  9. Built - in test equipment

    機內測試設備
  10. Abstract : the design that embedded computer is applied to phased array radar for built - in test equipment is introduced

    文摘:介紹了嵌入式計算機應用於相控陣雷達機內測試設備的設計。
  11. The composition, principle and design characteristic of built in test equipment of phased array radar and application specific electronic module for built - in test equipment are described

    敘述了機內測試設備和專用電子模塊的組成,工作原理以及設計特點。
  12. The built - in test ( bit ) is an integral capability of the mission system or equipment which provides an automated test capability to detect, diagnose or isolate failures

    機內測試( built - intest , bit )是系統或設備自身為故障檢測、隔離或診斷提供的自動測試能力。
  13. Built - in test ( bit ) technique is an important approach to improve testability and diagnostic capability of equipments and devices greatly. the domain of bit application has extended from electronic equipments to mechantronic equipments. however, the high false alarm rate ( far ) is one of the important factors that prevent bit from being more extensively applied

    機內測試( built - intest , bit )技術在提高武器裝備和機電系統的測試性、簡化維修過程和降低保障費用等方面發揮了重要作用,但虛警率高的問題一直阻礙著bit效能的充分發揮和更廣泛、更深入的應用。
  14. In the experiment of advanced aircraft electrical power distribution system ( aepds ), terminal built - in test equipment ( tbte ) is one of the most important equipments, which can not only simulate all remote terminal loads " work - states, but also monitor the buses " power quality

    為了加快先進飛機配電系統的設計,需要一個既能夠模擬系統終端多路負載和匯流條各種工作狀態,又能對匯流條進行電能質量監測的實驗裝置,以便進行地面實驗和測試工作。
  15. The design of a digital voltage regulator with built - in - test function using doubly salient electro - magnetic generator is also introduced. prototypes of doubly salient electro - magnetic motor and generator control system is set up. the experiment results are obtained on the prototypes, which prove that the theories and analysis are correct

    最後,分別對電勵磁雙凸極電機電動控制器和發電機調壓器試驗驗證系統進行了實驗,實驗結果表明兩個系統都具有良好的性能,驗證了理論分析和數字模擬以及系統軟、硬體設計的正確性。
  16. The different built - in test types produce different test results. for more information about test results, see

    不同的內置測試類型會產生不同的測試結果。
  17. The built - in test ( bit ) design of hardware and software is also introduced in this dissertation. the bit design consists of analog inputs, digital inputs and digital outputs

    本文還對匯流條控制器的模擬量輸入通道、數字量輸入通道、數字量輸出通道進行了自檢測設計,包括硬體bit設計和軟體實現方法。
  18. You used rational developer to create a simple web service and a web application that uses the web service, and then you ran the web service and application with the websphere application server rational developer s built - in test environment

    您使用rational developer創建了一個簡單的web服務和一個使用此web服務的web應用程序,然後,您用websphere application server ( rational developer的內置測試環境)運行了該web服務和應用程序。
  19. The design of a digital voltage regulator with built - in - test function using doubly salient electro - magnetic motor is also introduced. prototypes of doubly salient electro - magnetic motor control system is set up. the experiment results are obtained on the prototypes, which prove that the theories and analysis are correct

    最後,對電勵磁雙凸極電機電動控制器試驗驗證系統進行了實驗,實驗結果表明實驗系統具有良好的性能,驗證了理論分析和數字模擬以及系統軟、硬體設計的正確性。
  20. The techniques used to improve the reliability of the controller are explained in detail, and the formation and realization of bit ( built in test ) system are presented

    介紹了控制器設計中採用的可靠性保障措施和機內自檢測系統的構成與實現方案。
分享友人