cable load 中文意思是什麼

cable load 解釋
電纜負載
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. In single pylon cable stayed bridges, and cable stayed bridges without backstays, when the bottom of the tower bears the moment from the dead load, it is concluded that non - symmetric configuration of pile cluster corresponding to the upper structure is more practical than symmetric configuration of pile cluster

    當獨塔斜拉橋、無背索斜拉橋等橋梁塔底永久作用有彎矩時,與完全對稱的基礎形式相比較,和上部結構相協調的不對稱基礎形式更加適用。
  2. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  3. Due to slope cable bears barely alternative load longtime in nature environment, it is easy to corrosion and wreck. seriously, the bridge is possibility to collapse in strictness air empoison, water pollution, seashore and ocean surroundings. therefore, to study cable ’ s corrosion widely and to inhibit corrosion process are very important for increase endurance and safety of bridge construction

    由於斜拉索長期承受交變載荷並暴露于自然環境中,特別是大氣污染嚴重地區、水污染嚴重地區、海濱及海洋環境,極易發生腐蝕破壞,嚴重者還會因坍塌而造成生命及財產的巨大損失,因此,全面研究橋梁拉索的腐蝕,阻斷腐蝕的成因,對提高橋梁結構的耐久性與安全性具有重要意義。
  4. In order to ascertain the character of cable - replaced bridge, in addition, the thesis calculates mode shapes and natural frequencies of the bridge using algor software and estimates the result of dynamic load test and calculation in details

    為了評價換索后橋梁的工作特性,最後利用algor軟體對換索后的結構進行了振型和自振頻率分析,並對動載試驗檢測和計算成果作了詳盡的分析和評價。
  5. When fully loaded and non - load anchor hook can quickly release from cable

    滿載空載時錨鉤都能快速脫纜。
  6. Test methods for cable accessories. part 2 : test of load - cycling at constant voltage

    電纜附件試驗方法.第2部分:恆壓負荷循環試驗
  7. Therefore, the prestress of the cable should make sure that the cable is in the tight state in the entire process. the largest wind load which the prestressed cable truss can undertake is studied emphatically in the article

    因此,索中初始預應力應能保證索在工作的全過程中始終處于張緊狀態,以此為條件,本文重點研究了預應力索桁架所能承受的最大風荷載值。
  8. The geometric nonlinear analysis of three types of large - span annular cable truss structures is put forward by using commercial fem program. their static properties in deferent load case are concluded, and some suggestions for actual projects are also presented. base on the prime realization of its static property, parameter analysis of its static property is done consisting of deferent number of truss, deferent height of truss, deferent scale of height of masts, deferent boundary condition and deferent magnitude of pre - stress in deferent load case

    本文利用通用有限元軟體ansys對大跨度環形空腹索桁結構體系中三種典型的結構(即內外圈都為圓形、外圈圓形內圈橢圓形、內外圈都為橢圓形的三種外形的結構)進行了幾何非線性分析,總結出各自在不同荷載工況下的靜力性能,並提出一些有實際工程意義的建議。
  9. The prestressed cable is a long - span structure which represents tensegrity structure thought. tensegrity structure is not stable without prestress and structural stiffness should be guaranteed by prestress. the structural stiffness changes compatibly with the load

    張拉整體結構在無預應力情況下結構是不穩定的,結構的剛度依靠預應力予以保證,並隨著荷載的作用,結構的剛度不斷變化。
  10. As an example, the space analysis model about the wuhu changjiang river bridge is done and the internal forces about the wuhu changjiang river bridge due to dead load and lived load are analyzed. 2. the vibration analysis of the long span plate - truss composite cable - stayed bridges

    文中以蕪湖長江大橋為例,建立了該橋的空間有限元分析模型,並重點分析了該橋在自重恆載作用下的結構內力及車輛荷載對橋梁結構內力的影響。
  11. A space geometric non - linear static finite element analysis program about the long span plate - truss composite cable - stayed bridges is presented. not only it can be used to solve the space static analysis about the state of the dead load configuration ( geometry and internal forces ), but also it can be used to analyze the internal forces and deformations of the whole construction course

    基於以上理論,並結合斜拉橋的施工過程,編制了大跨徑斜拉橋的空間幾何非線性靜力分析程序,既可用於斜拉橋成橋狀態的空間靜力分析,也可結合斜拉橋的具體施工過程,進行施工過程中的內力與變形狀態的跟蹤分析。
  12. Some key issues in the modeling of a long span composite cable - stayed bridge are discussed such as cable tension, dead load, large deflection, concrete deck stiffness, concrete deck - steel girder connection, and boundary condition. some conclusion can drawn from the thesis : 1. the initial equilibrium configuration of the bridge is clarified in the thesis

    本文深入討論大跨度結合梁斜拉橋"基準"有限元模型建立過程中的幾個關鍵問題並得到一些有意義的結論: 1 .明確斜拉橋在索初應力和恆載作用下的初始平衡構型? ?處于初始平衡狀態時的幾何位置,給出了其計算方法。
  13. The main factors which affected the flight stability quality included : forward flight speed, slung - load and helicopter mass ration, slung - load aerodynamic forces and cable length, etc. through adjusting the above structure and performance parameters, rational flight parameters can be decided, which can ensure the safe helicopter mission operations of the slung - load flight

    影響飛行品質穩定性要求的主要因素為:直升機飛行速度、吊掛物/直升機質量比、吊掛物氣動特性、吊掛鋼索長度等。通過對上述結構參數、性能參數的調節,可確定合理、經濟的飛行參數,保證安全、高效的完成直升機機外吊掛飛行運輸任務。
  14. Study of load - bearing capacity for single - layer cable mesh point - supporting glass curtain

    單層索網點支式玻璃幕墻的承載性能研究
  15. Under selfgravity and secondary dead load, the wide steel box girder cable - stay bridge has a large deflection in transverse

    梁寬較大的斜拉橋鋼箱梁在自重和二期恆載的作用下,在橫橋向有著較大的撓度,在設計中必須予以考慮。
  16. The heavy load ropes used in the sea, fishery and coast industries, fishing system, rescue system, offshore platform systen, the ropes for berth, anchoring, survey system for the ociasion earthquake, and cable systems

    ? ?在海洋,漁業和海岸工業中使用的重負荷繩索。海上打澇系統,救援系統,海洋石油平臺系統,停泊、拋錨、嵌入系泊線、海洋地震勘測、海底電纜系統。
  17. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  18. Specific dead - end design and performance depends upon a number of factors such as cable brand and design, strength member construction, jacket type, tension load requirements, temperature and environmental operating conditions, and so on

    使adss光纜的表面及芯部光纖免受損傷。充分考慮有效地保護adss光纜,該類線夾採用內外層預絞絲結構。
  19. Assuming the loop is known to be only a single straight segment of 26awg cable, there is no additive loop or afe noise, and the remote - end is terminated by a high - impedance load for all frequencies, figure 5 shows the resulting selt performance

    假定已知環路只有一個單個的直段26awg電纜,沒有附加的環路或者afe噪聲,對所有的頻率遠端通過一個高祖抗負載終止,圖5給出了selt的性能結果。
  20. Concealed cable load capacity 44lbs 20 kg

    隱藏電纜負重達44磅20公斤
分享友人