cable-deck 中文意思是什麼

cable-deck 解釋
短艏樓甲板
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • deck : n 1 甲板,艙板;覆蓋物。2 【建築】平屋頂;橋面;【鐵路】客車車頂。3 〈俚語〉地面,地。4 〈主美〉...
  1. A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension bridges.

    以上鋼橋面重量的比較指出,斜拉橋介於連續梁和懸索橋之間。
  2. Marine cable glands for bulkhead and deck

    船舶艙壁和甲板用電纜密封套
  3. Cable stayed bridge - pylon above deck

    斜拉橋-橋面主塔工程
  4. Some key issues in the modeling of a long span composite cable - stayed bridge are discussed such as cable tension, dead load, large deflection, concrete deck stiffness, concrete deck - steel girder connection, and boundary condition. some conclusion can drawn from the thesis : 1. the initial equilibrium configuration of the bridge is clarified in the thesis

    本文深入討論大跨度結合梁斜拉橋"基準"有限元模型建立過程中的幾個關鍵問題並得到一些有意義的結論: 1 .明確斜拉橋在索初應力和恆載作用下的初始平衡構型? ?處于初始平衡狀態時的幾何位置,給出了其計算方法。
  5. World war ii footage has that familiar black - and - white scene : a heavily damaged war bird lands out of control on the stern of a straight - deck carrier and crashes into a steel cable net, which prevents it from ramming into aircraft waiting to take off

    講到第二次世界大戰的影片里頭,常常會出現一種熟悉的黑白場景:一架嚴重受損的戰機,失控降落在航空母艦筆直甲板的最末端,猛地沖入鋼纜製成的網子里頭,剛好沒有撞上其他正在準備起飛的戰機。
  6. As a result of increasing bridge span, deck flexibility and structure complexity, earthquake analysis of long span cable - stayed bridge becomes one of the most concern and challenge problems in bridge engineering field

    隨著橋梁跨度、橋面柔性和構造復雜性的增加,大跨度斜拉橋的地震動研究已經成為橋梁工程界最關心、最具有挑戰性的課題之一。
  7. 4. the side girders, the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time

    4 、金馬大橋在施工過程中採用邊主梁、橫隔梁和橋面板三部分分階段一次現澆。
  8. Cable car system to connect sai kung town to surrounding island to improve visitation and sightseeing. an observation deck could be constructed at fei ngo shan to view ho chung and pak sha wan. it could be connected to ho chung by cable car

    興建纜車系統連接西貢及四周島嶼,方便遊客前往觀光,以及在飛鵝山興建觀景臺,以瀏覽蠔涌和白的景色,並以纜車連接蠔涌。
  9. 3. the effective width of the deck of the cable - stayed bridge is up to profound research because there is no exactly definition in the applicable design standards

    3 、由於現行的有關橋梁設計規范沒有對斜拉橋主梁的有效寬度做出具體規定,從而使斜拉橋在設計中橋面板的有效寬度取值問題有待于進一步研究。
  10. The double - deck lantau link consists of the tsing ma bridge linking tsing yi to ma wan ; a viaduct over ma wan ; and the cable - stayed kap shui mun bridge linking ma wan to lantau

    青嶼干線採用雙層結構,其組成部分包括連接青衣與馬灣的青馬大橋、跨越馬灣的高架道路,以及採用斜拉橋設計、連接馬灣與大嶼山的汲水門大橋。
  11. Traditional approach to raise damping is installing passive damper between cable and deck, such as viscous ( oil ) dampers

    目前增加拉索阻尼的常用辦法是在拉索和橋面間安裝被動阻尼器,如油阻尼器。
  12. Specification for ships ' deck machinery - anchor cable stoppers

    船用甲板機械規范.錨纜制動器
  13. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜拉橋? ?青洲閩江大橋為背景,首先根據設計圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現場靜力試驗和環境振動試驗結果對初始有限元模型進行校正,通過參數的調整使模型靜、動力計算結果與實測值吻合。
  14. Stay cables of the long - span cable - stayed bridges are susceptible to vibration under wind loading, or wind incorporated rain excitation, or deck motion due to high flexibility, relatively small mass and very low inherent damping, such as vortex shedding, wake galloping, parameter resonance and wind - rain induced vibration. large - amplitude vibration of cables may reduce the life of cables and threaten safe traffic, and has been considered today as one of the most critical problems for this type of bridge

    大跨度斜拉橋拉索具有較小的質量和極低的阻尼,在風、風雨及橋面振動等外部激勵下極易發生振動,如渦激共振、尾流馳振、參數共振和風雨振等,拉索的大幅振動對拉索的使用壽命和橋梁安全運營構成極大威脅,它已成為大跨度斜拉橋急需解決的關鍵問題之一。
  15. Rio - antirio bridge : with four towers, the bridge with the longest cable - stayed suspended deck, spanning the gulf of corinth near 帕 特 雷, 希臘

    天空之橋:位於加拿大,是世界上最長的鐵路專用橋,橫跨弗雷塞河,它將新西敏市和素里市連接起來。
  16. Base on review of existed study and application in suppressing cable vibration in the world, technique of mitigating cable vibration with viscous damper and mr damper has been investigated in this dissertation, and the main contents and progresses in form of summary are as following : 1 the motion differential equations of the cable - damper system are formatted, which take into account these factors, such as the inclined angle, sag, stiffness etc. coupling motion between cable and deck is studied with analytical and numerical method. numerical results show that large amplitude vibration of cable with beat rhythm will occur when exciting frequency of deck equals two times modal frequency of cable

    本文在對國內外斜拉索振動控制研究與應用現狀進行綜合評述、分析的基礎上,針對上述問題進行了深入研究,具體的研究內容和取得的成果包括: 1 、建立了斜拉索-阻尼器系統運動方程,對拉索與橋面的耦合振動作了分析和研究,數值結果顯示當橋面激振頻率等於某階拉索模態頻率的兩倍時,很小的初始擾動將引起拉索的大幅振動,並呈現拍振的特徵,與實測的拍振信號一致。
  17. During the finite element modeling of the bridge, the factors affecting the accuracy of the finite element model are discussed in detail, such as, the geometrical non - linearity of the cable including gravitational sag and initial tension, and the structural orthotropic steel box - girder deck to be equivalent to physical orthotropic deck by using compound material mechanics, and so on

    在建模過程中,盡可能多地考慮了一些影響全橋有限元模型精度的因素:如斜拉索的幾何非線性(重力垂度和初始應力) ,將構造正交各向異性鋼箱梁橋面板用復合材料力學的方法等效為物理正交各向異性板等。
  18. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆孔樁施工、承載力3000kn斜拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。
  19. 2. the field ambient vibration tests induced by wind and normal traffic were carried to determine the real dynamic characteristics, including vertical, torsional, transversal and longitudinal frequencies and modal shapes, each cable tension force, as well as the figure of the bridge deck

    2 .進行實橋在環境激勵下的動載試驗,測量該橋的豎向、扭轉、橫向以及縱向的動力特性,所有拉索的索力及橋面線型。
  20. Eco - tourism, cultural heritage, theme park, cable car ( including those linking up the islands ), helicopter tour and other themed attractions ; - festival deck at yeung chau

    生態旅遊、文化遺產、主題公園、纜車(包括連接各個島嶼的纜車) 、直升機游覽,以及其他主題景觀;
分享友人