calculated amount 中文意思是什麼

calculated amount 解釋
計算量
  • calculated : adj. 1. 有計劃的,有意的,故意的。2. (預備)供…之用的,合於…之用的。3. 算清了的;被預測出的。
  • amount : vi. 1. 總計,共計,合計 (to)。2. 相當于,等於。3. 成為 (to)。n. 1. 總和,總額。2. 數值,量,金額。3. 結果,效果;要旨。
  1. The amount of free ions and labile complexes of copper has been determined and the apparent stable constants have been calculated in a proteose peptone medium by anodic stripping staircase voltammetry ( assv )

    採用陽極階梯溶出伏安法,測定了蛋白腖細胞生長液中的易變形態銅,並獲得了總銅量中易變形態的摩爾分數以及易變形態的表觀穩定常數。
  2. Article 6 the " tax base of an liability " shall refer to the carrying amount of a liability minus the amount that can be deducted according to the tax law when the amount of taxable income is calculated in the future period

    第六條負債的計稅基礎,是指負債的賬面價值減去未來期間計算應納稅所得額時按照稅法規定可予抵扣的金額。
  3. Conditional fees are different from the american form of contingency fee, where the lawyer s fee is calculated as a percentage of the amount of damages awarded by the court

    按條件收費與美國的按判決金額收費不同,按判決金額收費的律師費用是以法庭裁決的損害賠償的一個百分率計算。
  4. Article 213 unit of account mentioned in this law refers to the special drawing right as defined by the international monetary fund ; its equivalent in renminbi shall be the amount calculated in terms of the conversion rate from the special drawing right of the international monetary fund to renminbi as prescribed by the competent state foreign exchange authority at the date of the judgement of the court, the date of the award of arbitration agency or the date agreed between the parties concerned

    第二百一十三條本法所稱計算單位,是指國際貨幣基金組織規定的特別提款權;其人民幣數額為法院判決之日、仲裁機構裁決之日或者當事人協議之日,按照國家外匯主管機關規定的國際貨幣基金組織的特別提款權對人民幣的換算辦法計算得出的人民幣數額。
  5. To this area precipitation materials for many years, evaporate materials, surface flow materials, hydrometeorological materials, hydrogeological materials carry on exhaustive analysis, have analysed the state of water resource of the sand district, proceed from the heat of the earth ' s surface is balanced, water yield balanced basic theories, combine the amount of regional water resource set up of the materials, such as scene, hydrology, soil of the sand district, etc. and estimate models, have calculated the surface water, groundwater of this area, has carried on models to examine according to the real data, and has predicted to the state of water resource under different climate change scenes of future that analyse. have put forward the scheme that the water resource in this area utilized rationally, use the non - linear motive force model to predict the precipitation, utilize the materials of actual observation, the natural supply amount of calculating out groundwater of sand ground of balanced principle of the amount of water used at the same time, and can exploiting amount predict to groundwater, district of sand,

    本文以寧夏半乾旱地區鹽池縣沙地水資源為研究對象,對該地區多年降水資料、蒸發資料、徑流資料、水文氣象資料、水文地質資料進行了詳盡的分析,分析了沙區的水資源狀況,從地表熱量平衡、水量平衡的基本理論出發,結合沙區的氣象、水文、土壤等資料建立了區域水資源量估算模型,計算了該地區的地表水、地下水,根據實際資料進行了模型檢驗,並對未來不同氣候變化情景下的水資源狀況進行了預測分析,提出了該地區水資源合理利用的方案,運用非線性動力模型對降水量進行預測,同時利用實際觀測資料,運用水量平衡原理計算出沙地地下水的天然補給量,並對沙區地下水可開采量進行預測。
  6. Connie calculated the amount of strength it must have taken to heave up that chair and the bulky clifford : too much, far too much

    那得要好一番氣力那得要太大太在的一番氣力呵!假如他沒有因此而丟了命!
  7. At last, taking the example of maotiao river the amount of low water resources carrying capacity was calculated

    最後,本文以貓跳河流域為例分別從年徑流量和枯季徑流量的角度計算水資源承載力的大小。
  8. The accrued interest to be paid for tender amount exceeding hk 50, 000 may not be exactly equal to the figures calculated from the accrued interest per minimum denomination of hk 50, 000, due to rounding error

    需繳付的累計利息,可能與以萬港元最低投標額計算出來的利息數字略有出入。
  9. The monthly amount to be paid for the work shall equal the percentage of work incorporated into the project since the last billing period, certified by the owner, times the sum of the cost of work and the general conditions costs ( calculated in the manner specified in the written authorization ) for the billing period, plus a pro rata portion of the fee ( calculated in the manner specified in the written authorization ), minus five percent ( 5 % ) from the cost of work, general conditions costs and fee for retention and one hundred percent ( 100 % ) of previous payments

    每月為工程支付的數額應相當于自經業主確認的上次的收費期間收納入項目的工程的百分比,乘以本次收費期間工程造價和一般條件造價(按書面授權書上所列的方式計算)的數額,加上費用的一定比例(按書面授權書上所列的方式計算) ,再從工程造價、一般條件造價和費用減去百分之五( 5 % )作為滯留金以及先錢付款的百分之百( 100 % ) 。
  10. The amount of stamp entitled will be calculated per receipt

    換領之印花以每張購貨單售貨額獨立計算,不可累積。
  11. The scope of water - using system and its constraints were determined based on the investigation, and minimal amount of fresh water and wastewater in water - using system were calculated to optimise the design of water - using network

    在廠區用水情況調查基礎上,確定用水系統范圍及限制雜質;並計算所確定用水系統的最小新鮮水用量和最小廢水排放量;最後對其用水網路進行優化設計。
  12. Article 12 an enterprise is allowed to deduct the amortized expenditures of intangible assets calculated under the related provisions when calculating the taxable amount of incomes

    第十二條在計算應納稅所得額時,企業按照規定計算的無形資產攤銷費用,準予扣除。
  13. The amount of hydroxyacetic acid, equal to that of sodium chloride, produced from chloroacetice acid hydrolysis is determined by adopting moore method and there fore the ratio of transformation of chloroacetice acid hydrolyzed can be calculated

    摘要氯乙酸水解生產羥基乙酸的工藝過程中產生等物質量的氯化鈉,採用莫爾法測定氯乙酸水解的產物氯化鈉,並計算氯乙酸的水解轉化率,從而選擇和控制水解反應的條件。
  14. The calculated results of the model indicated that from year 2000 - 2020, the groundwater usage keeps a tendency of increase, while the amount of water introduced from yellow river is decreasing. this result is not only in favor of improving the eco - environment of yin - chuan basin, keeping the sustainable development of society and economy, but also play an important role in solving the problem of drying up of yellow river in downstream areas

    根據模型的運行結果,直到2020年,在總用水量未超過區內水資源允許使用量的前提下,盆地內的地下水開采量呈增長趨勢,而地表水引用量則呈下降趨勢,這不但有利於銀川盆地生態環境的改善,保持當地社會經濟的可持續發展,而且對于解決黃河斷流問題也有重要的意義。
  15. Based on the analysis of crop structure and crop yield according to the statistic data in 1949 ~ 2000 year. the total water consumption of main crops and the amount of rainwater utilized have been calculated. the rapid increase in water demand for crops production after the late eighties is the one of main reasons of the water resources crisis in baoding area. the efficient precipitation, the water demand and the deficiencies of main crops in different typical years and in different growth period in baoding plain have been studied in detail. the factors of water use efficiency of different crops have been put forward through the analysis of test data in typical year

    本文利用保定市1949 2000年主要農作物的種植面積與產量統計資料,在分析了歷年種植結構變化、單產變化的基礎上,明確了歷年糧食總產變化情況,計算了歷年糧食生產的總需水量及其變化;根據農作物的雨水資源的變化規律,分析了歷年用於糧食生產的有效降水量;得出了保定市農業用水量從90年代中後期大幅度增加而有效降雨量的明顯減小,是造成保定市水資源供需矛盾突出的主要原因之一。
  16. Measure of the amount of fluctuation in price of the underlying security calculated using the standard deviation of average daily price change

    對基礎證券價格波動程度的測量,利用每日價格變化的標準偏差來計算。
  17. Lastly, in the terms of controlling the schedule and the cost, we cancelled the previous methods that time was indicated the schedule and that amount of capital invested was calculated the project schedule. we calculated the realistic project schedule by the means of the earned value that we calculated amount of capital required using the working procedure, in the meantime, we applied the analysis of the cost current curve to achieve the cost and the schedule integrated

    在進度與費用控制上,改變原來用時間表示項目進度或用完成投資額來計算項目進度的做法,用完成工序(或工作量)相應的計劃資金需求量,稱為掙值( earnedvalue ) ,來計量項目的實際進度,利用費用流曲線的分析,實現了費用與進度的聯合控制。
  18. Normal vat payers doing old and waste materials business have the right to require deduction of input tax calculated on the money amount for purchase indicated in the purchase document

    40從事廢舊物資經營的增值稅一般納稅人收購廢舊物資,有按收購憑證上註明的收購金額計算進項稅額予以扣除的權利。
  19. Monthly means that the amount of interest is calculated on the last day of the month

    銀行將本月的日利息加起來並且在每月的最後一天支付。
  20. A model of letting out of no oil ubricated double whirlpools vortex air compressor was set up, the length of leak line of one cycle was calculated the change of the leak line at work, the change of the length of leak line varying with the crank corner, and the change of the leak amount varying with the pressure of revealing atmospheric and crank corner were analyzed

    摘要建立了無油潤滑雙渦圈渦旋壓縮機的泄露模型,根據型線的幾何理論計算了一個周期內泄漏線的長度,分析了在工作過程中泄漏線的變化,泄漏線長度隨曲柄轉角的變化,以及泄露量隨排氣壓力,曲柄轉角的變代情況。
分享友人