capital construction cost 中文意思是什麼

capital construction cost 解釋
基本建設成本
  • capital : adj 1 首位的,最重要的,主要的,基本的,根本的。2 〈口語〉優秀的,上好的,第一流的。3 大寫(字母...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. The capital cost involved in these construction is immense.

    建設投資相當驚人
  2. Controlling approach to the project cost in the prophase of capital construction

    工程造價在基本建設前期的控制途徑
  3. Article 34 with respect to major public construction projects and major policy implementation plans, before the budget estimates and budget proposals are compiled, a cost efficiency analysis report on the alternative measures and substitute measures must be first drawn up and attached with a description of the financing and capital employment. and the report should be forwarded to the legislative yuan for its files and reference

    第34條重要公共工程建設及重大施政計畫,應先行製作選擇方案及替代方案之成本效益分析報告,並提供財源籌措及資金運用之說明,始得編列概算及預算案,並送立法院備查。
  4. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編制投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格控制工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
  5. How to improve the investment quality of the cost of building in capital construction management

    基建管理如何提高工程造價編審質量
  6. The budget of the investment : the total investment capital is 20 million yuan rmb, the cost of the construction is 10. 5 million yuan rmb, the cost for purchasing the equipment is 7 million yuan rmb the foundation current capital is 2. 5 million yuan rmb

    投資預算:總投資2000萬元人民幣,建築工程費1050萬元人民幣,設備購置費700萬元人民幣,鋪底流動資金250萬元人民幣。
  7. The budget of the investment : the total investment capital is 14. 5 million yuan rmb, the construction cost is 9. 5 million yuan rmb, the investment of equipment fixing is 1 million yuan rmb, the cost for purchasing the equipment and tools is 1 million yuan rmb, the other costs are is 2 million yuan rmb, the current fund is 1 million yuan, the self capital is 4. 5 million yuan rmb and the capital importation is 10 million yuan rmb

    投資預算:總投資1450萬元人民幣,建築工程費950萬元人民幣,安裝工程費100萬元人民幣,設備工器具購置費100萬元人民幣,其他費用200萬元人民幣,鋪底流動資金100萬元人民幣,其中自有資金450萬元人民幣,引進資金1000萬元人民幣。
  8. In order to speed up the urban construction, guarantee " olympic games move plan " construction and development goal realization, widely attracts the social capital to enter the city infrastructure domain to solve the fund supply and demand contradictory of large - scale centralism construction time and eliminates the low efficiency and resources waste which the administrative monopoly and the state - owned capital monopoly brings, reduces the infrastructure construction and the operation cost, lightens

    為了加快城市建設進程,保證《奧運行動規劃》中各項建設和發展目標的實現,廣泛吸引社會資本進入城市基礎設施領域,解決大規模集中建設時期資金供需矛盾,消除行政性壟斷和國有資本壟斷造成的效率低下和資源浪費,降低基礎設施建設和運營成本,減輕政府財政補貼負擔,為廣大市民提供更優質的公共產品和服務,這些都要求北京市城市基礎設施投融資體制進行徹底地改革。
  9. The artide, the process contrd in construction project, analyzed the inner aned outer environment of the construction enterprise, considered the advanced managing experience of some construction enterprises in and out of china, researched the managing theories and summarized the practice experience from project cost contrd, progress contrd, quality contrd and capital contrd, and tried to find an efficacious way to superintend the process of the construction, the article indude five parts : 1. the necessity and strategic significance of carrying out the contructinn project process contrd. 2. the current situations and main problems of the project process contrd in china. 3. the experience of the project process contrd in and out of china, and the revelation for us. 4. the methods and contents of enhancing the project contrd in enterprise, include the methods and contents of the project cost contrd, highlighting quality contrd and improving quality standard, highlighting quality contrd and improving quality standard, the contrd of project planning progress and resource management, strengthening financial management and increasing the profits. 5. speeding up the reform of the project control institution, improving the scientific and efficacious managing institution, improving the scientific and efficacious managing institution, and some key respects in the project management process

    所有者缺位,企業沒有真正地建立起現代企業制度,決策缺乏科學性,人本管理、企業文化建設、制度建設沒有真正地的落到實處,企業的經營權力過分集中,經營者負盈不負虧,拼資源的現象普遍存在,管理水平不高,盈利能力較弱,競爭能力不強,人員素質較差,是大部分國有企業內部的通病。 《施工項目過程式控制制》這篇文章,通過對施工企業所處內外環境的客觀分析,結合國際國內的一些施工企業的先進管理經驗,從項目成本控制,進度控制,質量控制,資金控制等方面進行理論探索及實踐總結,力爭找出一條有效監控施工企業施工過程的成熟的管理之路,全文共分五個部分:一、實施施工項目過程式控制制的必要性及其戰略意義。二、當前我國項目控制的現狀及其存在的主要問題。
  10. Directing against some unreasonable practices of evaluation organizations in china at present, combined with evaluation work practices of more than ten years, requirements for strengthening preparation work before assets evaluation in power industry have been put forward, and essential factors for assets evaluation in power industry, such as capital cost, reasonable construction period, interest rate in the construction period, economic depreciation resulting from environmental protection etc., being expounded

    摘要針對當前我國評估機構的一些不合理之處,結合十多年評估工作實踐,從電力資產的特點出發,對電力資產評估要素,如資金成本、合理建設工期、建設期利率、環保因素產生的經濟性貶值等分別進行了論述。
  11. By analysing the conveyance cost, we can get the conclusion that the direct reason of high transport cost of shichang railroad is : capital over low, owing debt high, the capital construction unreasonable, the interest of bank loan heavy, high finance administrative expense. by means of the analysis of conveyance income, this article has pointed out that the lacking of carrying traffice resulting in conveyance income over low, is another reason for the high shichang railroad conveyance cost

    從運輸成本的分析中得知,石長鐵路資本金比例過低、負債過高、資本結構不合理、銀行貸款利息重、財務管理費用嚴重偏高是運輸成本高的直接原因。通過分析運輸收入,本文指出運量不足而造成的運輸收入過低,也是造成石長鐵路運輸成本偏高的另一個原因。
  12. Audit of public companies and all kinds of enterprises, asset appraisal, capital verification, examination and verification of the construction cost /, plan of transformation in line with stock system, taxation affairs and accounting consultant

    上市公司及各類企業審計、資產評估、資本驗證、工程造價、股份制改造策劃、稅務、會計咨詢顧問。
  13. In order to solve the conflict of supply and demand, firstly, this particle discusses the characters of the national budget investment the emission of stock, attracting foreign capital and invest direct, domestic banks " loan, international financial organizations and foreign governments " loan, and the emission of bond, the bot mode and other financing manners. also, the particle analyses the resources of each financing manner and characters concretely. then, it analyses the scale, cost, construction and manner of highways " raising project, and it emphasizes banks " loan domestic and overseas, the emission of stock and bond, the attornment of highway ' s charge rights, the capital cost of bot financing manner, and uses the model to calc ulate the compositive capital cost, then build the worst ( in the worst environment hypothetically ) and the best scheme ( in the best environment hypothetically ) accordingly, after the comparison, we can obtain the status of the project ' s net cash flux, the debt ' s endurance capability, income and a series of data in any possible state, so that to get the optimized scheme and prepare for the scientific decision

    為了解決資金的供需矛盾,本文首先論述了國家預算內投資、發行股票、吸收國外資本直接投資、國內銀行貸款、國際金融組織和外國政府貸款、發行債券、 bot方式等融資渠道的特點,具體分析了各融資方式的資金來源渠道及它們的特點;接著分析了公路項目籌資的規模、成本、結構和方式,重點分析國內外銀行貸款、發行股票和債券、轉讓公路收費權、 bot融資方式資金成本,用模型的方式具體計算綜合資金成本,建立相應的最差方案(在假設的最差條件下)和最佳方案(在假設的最好條件下)與之進行比較,獲取在各種可能條件下的項目凈現金流量狀況、債務承受能力和收益情況等一系列數據,確定整體最優方案,為科學決策做準備。
  14. Approach to cost control and management for prior work of capital construction of water conservancy

    水利基建前期工作造價控制和管理問題的探討
  15. At present stage, it is limited by the objective conditions to introduce consulting company to provide turnkey services for engineering management. improving investment benefits and seeking a rational balance among the construction period, quality and cost of project are the primary problems which the capital construction management department is facing with in scientific research institute

    現階段通過工程項目管理公司實行管理承包服務還受到一定的客觀條件的限制,如何發揮投資的效益,在工期、質量、成本上達到一個合理的平衡點,成為現階段科研院所基建管理部門面對的主要問題。
  16. A new method on cost - forecast and optimizing decision - making is built up, aiming at nonlinear problem of fire - electric power set capital construction time limit cost, based on gray system theory

    針對火電機組基建工期成本的非線性問題,基於灰色系統理論,提出了一種成本預測與優化決策的新方法。
  17. The management of construction engineering cost is to make the fullest use of the limited construction capital and the limited material as planned so that more output can be realized with less input this is the starting point and the settling place of capital construction as well as the purpose of construction engineering pricing management

    實行建設工程造價管理,是為了保證有限的建設資金和有限的物資得到有計劃、最充分的利用,以盡可能少的投入取得盡可能多的產出,這是基本建設的出發點和歸宿,是實行建設工程造價管理的宗旨。
  18. On the non - estate capital construction cost management

    關于加強工程造價管理的點滴思考
  19. For industrial enterprise investment, the fee of capital construction project planning consultant shall be exempted and a 50 % reduction of auxiliary cost of construction of small towns should be granted

    投資工業企業的,基本建設項目免收規劃咨詢費,小城鎮建設配套費減半徵收。
  20. Fc approved the funding proposal of an injection 2 billion from the capital investment fund to partly finance the construction cost of iec at clk

    財務委員會批準下述撥款建議:從資本投資基金撥款20億元,用以支付在赤角興建展覽中心的部分建造費用。
分享友人