cast-in hole 中文意思是什麼

cast-in hole 解釋
鑄成孔
  • cast : vt (cast; cast)1 投,扔,擲,拋。 ★此義動詞通常用 throw cast 只用於若干特殊句子。2 丟棄,拋棄;...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • hole : n 1 洞,穴,孔;(衣服等上的)破洞;傷口;漏洞;窩,坑;水流的深凹處,(河道的)緩流窪。2 (獸的...
  1. The bore - hole cast - in - situ pile foundation has been born widely used in bridge engineering

    鉆孔灌注樁基礎在我國橋梁工程中應用極為廣泛。
  2. The quantity direct control and trouble treatment of drill hole and cast - in - place pile

    鉆孔灌注樁的質量監督控制及事故處理
  3. Further more, the fracture possibility is analyzed with fracture mechanics after the stress calculation of local high stress area around the bolt hole in shell flange and the measurement of fracture toughness of gray cast iron. the improving structure of bolts connected head and shell flange is brought forward

    此外,在計算獲得缸體法蘭螺栓孔局部高應力區的應力水平后,由斷裂力學分析發生脆性斷裂的可能性,並提出烘缸缸體與缸蓋聯接結構的改進方案。
  4. The one in my left hand is a cast made from the hole in the rose bed.

    我左手拿的這個就是在花壇里留下的那個洞的壓模。
  5. Prevention of fissured nitrogen hole in cast iron produced with resin sand

    樹脂砂生產鑄鐵件裂隙狀氮氣孔及其防止
  6. Construction of cast - in - place pile of hand dug hole for 1780 project

    1780工程人工挖孔灌注樁施工
  7. Method to evaluate pile capacity precisely by using the coefficient of cleaning slime and coefficient of construction process and by controlling the total duration of construction is proposed herein after analyzing the influences of slime at pile bottom, thickness of mudcake by the side of pile, shape of hole wall, time of construction and construction process on the bearing capacity of large diameter cast - in - place pile

    本文通過分析樁底沉渣、樁側泥皮厚度、孔壁形狀、成樁時間及施工工藝等對大口徑灌注樁承載力的影響,提出了在樁承載力計算中引入清底系數及成樁工藝系數,並控製成樁總時間以較準確地評價單樁承載力的方法。
  8. Test and analysis of vertical load for clay excavation hole cast - in - place pile

    粘性土挖孔灌注樁豎向荷載測試與分析
  9. This paper effectively deals with water inflow for excavated and cast - in - place pile under water with the constrained condition and strata of large water content during the course of forming hole and casting pile by using triple tubes directional jet as waterproof curtain, to decrease the compression for river channel, and ensure safety and quality in the phase of construction

    摘要針對水中施工挖孔樁,條件受到限制、地層中含水量較大,為盡可能避免造成對河道的佔用與影響,採用三重管定噴技術做止水帷幕,有效地解決了成孔成樁過程中涌水等問題,保證了工程施工的安全與質量。
分享友人