compile cost 中文意思是什麼

compile cost 解釋
編譯成本
  • compile : vt. 匯集,編輯,編制;搜集(資料)。 compile a dictionary 編詞典。 compile a budget 編預算。
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. It is very important to develop the paperless recording instrument ( dr1000 ). the study are based on the concept of intellectualized instrument, and i have adopted the method of low - cost automatic system. in the hardware, bring up an embedded system of single chip based on cpu ( 80c ! 96kc ) ; in the software, i used series 96 compile language and visual program based on vb in recording instrument

    本課題提出開發的無紙記錄儀是從智能儀器儀表開發的概念出發,採用低成本的自動化小系統的研究方法,提出了一種在硬體上基於以80c196kc為微處理器的單片機控制的小嵌入式系統,在下位機軟體基於96系列的通用匯編語言,而上位機基於vb的可視化編程。
  2. Compile & examine the cost of construction projects ; preparation of the bidding ( & the tender ) documents ; compile & examine target of calling for tender ( or bidding ) ; supervise cost of construction project

    建築工程造價編審,全過程造價監理,工程造價鑒定,招投標標底編審,招投標文件編制及咨詢。
  3. Next in order this paper presents the idea of establishing abc thought in the erp financial accounting module, mostly including first is establishing the relationship between cost driver and product 、 cost 、 expenses ; second is designing appropriate accounting evidence ; the third is establishing abc accounting process in financial system. and then bring up to reform the erp system from four aspects to adapt to the demand of abc cost accounting process design, we ( 1 ) divide activity center according to process means 、 process object 、 process craft and concentration degrees of geography position, ( 2 ) revise production craft flow detailed list, ( 3 ) compile resource requirements planning, ( 4 ) compile activity input / output control statement

    其次提出在erp財務會計模塊中構建abc思想的思路,主要包括建立成本動因與產品、成本、費用之間的聯系、設計適當的會計憑證、建立財務系統abc核算流程;而後提出從四個方面改造erp系統以適應abc成本核算流程設計的需要,一是按加工手段、加工對象、加工工藝和地理位置集中程度四個條件劃分作業中心、二是對生產工藝流程清單進行修訂、三是編制資源需求計劃、四是編製作業投入/產出控制報表。
  4. Java 5 added generics support to the language, giving developers a way to both check collection type - safety at compile time and hide the runtime casting involved with using a collection though at the cost of a sometimes very messy syntax for typing

    Java 5增加了對語言泛型的支持,使開發者既可以在編譯時檢查集合類型安全性,又可以隱藏使用集合所涉及的運行時重塑(盡管以一個輸入有時會非常雜亂的語法為代價) 。
  5. Each query plan and execution context has an associated cost factor that indicates how expensive the structure is to compile

    每個查詢計劃和執行環境都有相關的成本因子,可表明編譯結構所需的費用。
  6. It emphasize in the macro view that we should enhance the lawmaking, develop association about engineering cost management, and broaden the service field of the organization on engineering cost consultation etc. from the micro view, considering that the architecture ' s price may be totally formed by the market and it may connect with international tradition, we discussed how to ferry stream from quota price to bill - quantity price, how to ferry stream from government making - price to enterprise free making - price. also we discussed how to compile bill - of - quantity, how to determine price of bidding strategies of bidding and how to quote price under the bill - of - quantity model. study of a certain reasonable low price, problems and countermeasures of the lowest bid approach in making bid and inviting bid has been discussed too

    強調:宏觀上,工程造價管理要加強立法、加強工程造價管理協會的建設、拓寬工程造價咨詢機構的服務面等;微觀上,針對建築產品價格完全由市場形成及與國際慣例接軌的要求,討論在剛剛開始推行工程量清單計價模式下,如何使定額計價向工程量清單計價過渡,建築產品如何由政府定價向企業自主定價過渡,以及工程量清單編制、標底價格的確定、施工企業的投標報價;研究在工程招投標過程中, 「合理低價」的確定方法,無標底招標可能出現的問題及對策;最後提出費用組成及計價方式的改革,使得工程造價更符合工程的實際情況,更有利於企業間的競爭。
分享友人