completion period 中文意思是什麼

completion period 解釋
完井工期
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  1. When the renewal inspection is completed more than three months before the expiry date of the existing certificate, the new maritime labour certificate shall be valid for a period not exceeding five years starting from the date of completion of the renewal inspection

    如果在現有證書到期之前三個月前完成了換證檢查,新海事勞工證書的有效期從完成換證檢查之日起不超過五年。
  2. Notwithstanding paragraph 1 of this standard, when the renewal inspection has been completed within three months before the expiry of the existing maritime labour certificate, the new maritime labour certificate shall be valid from the date of completion of the renewal inspection for a period not exceeding five years from the date of expiry of the existing certificate

    盡管有本標準第1款的規定,如果在現有海事勞工證書到期之前3個月內完成了換證檢查,新海事勞工證書應從完成換證檢查之日起有效,有效期自現有證書到期之日起不超過5年。
  3. A period of life characterized by physiological and psychic change that marks the end of the reproductive capacity of women and terminates with the completion of menopause

    絕經期,更年期生命的一個階段,特徵是標志婦女生殖能力終結及以停經完成為結束的生理、心理變化
  4. To the disabled job - seeker and will be free to decide whether to continue the employment upon completion of the work trial period

    三個月的試工。試工期滿后,僱主可自行決定是否繼續聘用有關員工。
  5. Auxiliary material will be supplied from domestic and overseas markets ; basic material will be supplied from domestic market in short period, in the long period it will be supplied by our factory after completion of the project of 6, 000t y tyre cord fabric

    原料供應:附屬原料由國內外市場供應,骨架材料近期由國內市場供應,將來由公司6000t y簾子線改擴建項目供應。
  6. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  7. By the discussion of the " marketing ration ", the formulating principles of new stock price in the future circulating transitional period, and the conditions of changing " checking system " to " registry system ", it emphasizes the marketing construction of new stock issuing system ; it emphasizes the use of marketing methods in order to improve the supply - demand relations, and balance the excessive speculation ; it emphasizes the importance of market measure in counteracting excessive speculation by effectively improving the supply - demand relation, the importance of regulating and raising the action ability of the market main body, the necessity of governmental funtion transformation and the completion of management structure in listed companies

    論文最後探討了研究新股短期價格行為對中國證券市場發展的啟示。通過對當前「市值配售」 、未來全流通過渡中新股發行價的制定原則以及實行「核準制」向「注冊制」轉變的條件的討論,強調新股發行制度改革的市場化建設;強調利用市場化手段,平衡過度投機行為,有效改善供求關系;強調規范和提高各市場主體的行為能力,切實解決政府職能轉換、上市公司治理結構完善等問題。
  8. By analyzing and calculating the structure and stress distribution status of foundation under time of completion, operating period and earthquake condition, the initial determination on the kinetic strength and liquefied possibility of underlying sand layer beneath the dam foundation are obtained

    分析一計算結構及地基在竣工期、運行期和地震作用下變形和應力分佈狀況,並初步判斷閘壩基礎卜伏砂層的動弧度及液化的可能性。
  9. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  10. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大壩基礎混凝土防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大壩施工填築竣工期、水庫蓄水運行期防滲墻的應力和變形隨墻體參數的變化而變化的規律,為大壩安全設計及防滲墻墻體材料的選擇提供了理論依據。
  11. Qualifications earned prior to the apprenticeship, such as completion of a basic craft course, may lead to shortening in apprenticeship period up to a maximum of 12 months

    練計劃前,已取得合適學歷,如職業訓練局訓練中心的基本技術課程,可獲縮減訓練期多達1 2
  12. Sorry, not percentage of completion, is " have you select to display the non - working period and / or holiday "

    對不起,不是進度百分比,是選了顯示停工時間或假期。
  13. Ningxiang county long tianfan the industry limited company is located within the boundaries of the beautiful and rich hunan province ningxiang county, the first period project area approximately 28000 square meters, have the fixed asset 2800 ten thousand yuan, the staff 200 people, the year productivity 240 tons ; the second phased project completion year after next productivity will amount to 500 - 600 ton

    寧鄉縣龍田釩業有限公司位於美麗富饒的湖南省寧鄉縣境內,首期工程佔地面積約28000平方米,擁有固定資產2800餘萬元,職工200餘人,年生產能力240噸;二期工程竣工後年生產能力達500 - 600噸。
  14. In addition, influence to density and strength of cement - stabilized soil because of molding delay and reasonable curing period from completion of subbase to the compaction of road - base are also researched. finally, experiment section of cement - stabilized silty soil subbase is constructed according to lab research results, and construction methods are summarized

    此外,研究了延遲成型時間對水泥穩定土的密度和強度的影響及底基層成型后至基層壓實前的合理養生齡期,最後,根據大量的室內研究成果進行了大劑量水泥穩定粉質土底基層試驗路的鋪築,並對施工工藝進行了總結。
  15. Assist or require applicants to personally do the construction, supervise the construction, demand completion of road reparation within a fixed period

    二、協調或要求申請人自行統一施工,並監督其施工及命其限期完成修復道路。
  16. The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line

    驗收時間:驗收考核在機組熱負荷試車結束后2個月的試生產時間內進行。
  17. The performance test shall be finished within the [ u ] [ b ] trial production [ / b ] [ / u ] period of 2 months after completion of hot commissioning of production line

    驗收時間:驗收考核在機組熱負荷試車結束后2個月的試生產時間內進行。
  18. The stage of college is an extremely important improvement and completion period in english study, in which the cross - cultural education is a very important link

    摘要大學階段是英語學習中極其重要的提高與完善時期,此階段的跨文化教育是非常重要的一環節。
  19. The locations and areas of the various pieces of land earmarked for housing production during the period from 2002 - 03 to 2005 - 06, together with the prospective commencement dates and estimated completion dates of the housing projects concerned ; and

    期間,本港預留作建屋用地的地點和面積及有關建屋計劃可動工日期及預計完成日期及
  20. Because settlement after completion of works is the key index of soft soil treatment, it is so important to calculate the final settlement accurately during the construction period

    由於工后沉降是決定軟基處理成敗的關鍵指標,因此施工期間最終沉降量的預估十分重要。
分享友人