connected load 中文意思是什麼

connected load 解釋
接電負載
  • connected : adj. 有聯絡的,聯系著的;連續[貫]的。 connected ideas 連貫的思想。 a connected plan 通盤計劃。adv. -ly ,-ness n.
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. The main operating transformer connected by a adscititious tandem on - load - tap - changing one is the important mode. about this question readers can get a correct and detailed answer from this paper

    通過基本定義和有關名牌值進行了計算和分析,認為在正負極限檔,外加串聯調壓變的阻抗值相對額定檔的偏差很小,所以可不必在意這種變壓器整體阻抗的偏差值。
  2. When testing begins, the computer of the tested uav flight control system will be connected into the network as a slave. the master of the system will diagnose faults should there be any ; otherwise it will set flight parameters and load flight course data for the slave

    檢測時,無人機的飛控系統計算機作為從機連入網路,如果從機的飛控系統沒有故障,主機將為從機設置飛行參數和裝定航線數據;如果有故障,則主機為從機飛控系統診斷故障。
  3. In order to eliminate the influence of the output filter capacitor current on the grid current, a novel control strategy for the grid - connected inverter in grid - tied and off - grid modes is proposed. the control strategy can also realize seamless transfer between grid - tied and off - gird modes. the grid - connected inverter can supply power to the critical load when the grid is off

    本文針對傳統並網控制策略進網電流受輸出濾波電容電流影響的問題,提出了一種新的並網控制策略,該控制策略能基本消除輸出濾波電容對進網電流的影響,實現獨立與並網兩模式之間的無縫切換,對關鍵負載起不間斷供電的作用。
  4. But the grid voltage is different in many countries, so the research of an inverter, which can be used in many countries, will become a trend. a grid - connected inverter in grid - tied and off - grid modes has many advantages such as peak shaving to reduce the overall cost of power by generating during peak load hours in grid - tied mode, and standby generation to provide power during system outages until service can be restored in off - grid mode

    由於世界各國電網電壓的規格繁多,能夠研製出適合於多個國家電網電壓規格的逆變器將是未來發展的一種趨勢;獨立與並網雙模式運行的逆變器由於具有緩解電網用電緊張、減少發電站的發電量、在電網斷電時對負載起不間斷供電的作用等優點,也成為現在研究的一個熱點。
  5. E power distribution : outdoor switchyard, 69kv incoming from tpc ; 67mva connected load, hv lv switchboard 385 sets

    配電工程: 69kv受電設備容量67mva戶外變電所高低盤385隻。
  6. Thus, urban gas load forecasting is an important research. it is a very important research task to forecast city gas load, for one hand, it will affect the planning of city gas pipe network, on the other hand, it is connected to the investment benefits and security of entire natural gas pipelines, and it ’ s meaningful for urban gas optimizing attemperation and gas pipeline optimizing operation

    因此,預知燃氣負荷的大小也就是城市用氣系統的負荷預測是一項非常重要的研究課題,它不僅關繫到城市燃氣管網規劃,還關繫到整個天然氣長輸管線的投資效益和可靠性,對將來連接各城市的天然氣局域網路的優化調度和城市燃氣管網的優化運行都有十分重要的意義。
  7. By using 5000kn pressure - bent testing machine, the specimens of boulder concrete and crushed stone concrete were tested through three - point - bending method and wedge - split tensile method, the scale division of the index dial of pressure - bent testing machine is larger, whereas the predicted test - load is lesser, so the velocity of exerted load is controlled through observing the reading of the multimeter which is connected with the collecting systerm in order to continuously exert test - load

    本文使用5000kn壓彎實驗機,對不同強度等級的卵石混凝土和碎石混凝土試件分別進行了三點彎曲試驗和楔入劈拉試驗。試驗過程中,由於實驗機噸位較大,而試驗荷載預計較小,為了能夠有效地控制加載大小和加載速度,採用通過觀察與荷載傳感器相連的萬用表讀數控制加載速度的方法,連續加載。
  8. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節流調速系統的回油路上串接調速閥時,隨階躍負載的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是增加的,上升時間、峰值時間以及調整時間也是增加的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  9. Therefore, the power department and users are concerned aboui harmonic and reactive compensation. the power department usually manage compute and measure the electric net " s harmonic condition and connected or new - connected harmonic load. and need to measure the harmonic vol tage current in some electric net " point. then, by manual making an in - depth analysis and statistics on measured - data, it can reduce harmonic harm on public not to take some effective measures

    電力部門通常在實際中,需要對電網的諧波狀況、已接入和新接入系統的諧波源負荷進行管理、計算及測量,需要對電力網路各點的諧波電壓、電流實際水平進行測試,然後對測試數據進行人工分析統計,並以此採取相應措施降低或減少諧波對電網的危害。
  10. A novel distribution network optimal control approach for load balancing is presented based on the simplified model of distribution system, in which tie switches are regarded as critical elements. the two feeder lines connected with a tie switch are regarded as a feeder couple. load balancing ratios of feeder couples and total distribution network are defined and be used as indice of network reconfiguration, respectively

    提出一種以聯絡開關為核心的用於負荷均衡化的配電網路優化控制方法,將每個聯絡開關對應的兩條饋線看作饋線偶,定義了饋線偶和配電網的負荷均衡率,並以此作為網路優化的評價函數,這樣配電網路重構過程就由若干饋線偶內負荷均衡化過程組成,在此基礎上發展了以負荷均衡化和降低線損為目標的配電網優化方法。
  11. No - load steady - state voltage building of a - connected three - phase induction generator under single - phase operation

    三角接法三相異步發電機單相空載穩態建壓
  12. The screw - shell of plug - fuse type fuseholders and the contact of a post - extractor fuseholder adjacent to the mounting surface ( unless the post - extractor fuseholder is of deadfront construction ) shall be connected to the load side of the circuit

    臨近盤面安裝的插拔式保險管座的擰動式外殼和柱狀拔出式保險管座的接頭應該接到電路的負荷端上
  13. As a result, at all these connection points, the two coaxial cables are connected to different transmission equipment, sharing the traffic load from the tandem switch to a given end exchange, with half of the respective trunk circuits put into use, ensuring network safety. for such connectivity, see figure 4

    因此,在所有的同軸電纜連接處,都採用兩條同軸電纜接到不同的傳輸設備的方法,將匯接交換機到某一端局的話務量在這兩條同軸連接上進行負荷分擔,中繼電路各開一半,從而保證網路的安全性。
  14. Purpose of the rectifier transformers is to operate with the ac / dc power converters connected to them, to adapt the power line voltage to the voltage required by the load but can ' t provide galvanic separation between load and power line

    整流變壓器的作用是連接到ac / dc電源轉換器上將電源側電壓轉換為負載所需電壓但不提供負載和電源之間的電隔離。
  15. The resonance network is connected to the gate, then the output and input matching network is designed to satisfy the oscillation criteria. then harmonic balance method is used to analysize and optimize the output power and phase noise. to minimize the load pulling effect a buffer amplifier is designed to isolate the oscillator and the load

    本文在場效應管fet柵極上加上諧振網路(諧振網路是通過cst模擬得到的,它是串聯反饋迴路,介質工作在te01模,對于其後的fet ,它又相當於一個帶阻濾波器) ,然後設計輸入輸出匹配電路,使電路結構滿足起振條件,之後繼續用諧波平衡法模擬和優化,使振蕩器輸出功率合適,相位噪聲很低。
  16. Contacts 3 - 4, 5 - 6 and 7 - 8 are available for load duty, and if required, must be wired in series with the load device or devices, and that series branch circuit connected across a power source compatible with the load

    接線端子3和4 , 5和6 , 7和8適用於電負荷,如果需要,應與負荷裝置或其它裝置進行串聯連接,這些串聯支路電流將兼容電源與負載相連。
  17. Simulation results show that the developed scheme performs well in terms of qos performance metrics such as the lightpath hop length and the network maximal link load. for ip over wdm networks consist of oxcs and routers, which are inter - connected by optical fibers, chapter 3 presents a novel routing and wavelength assignment algorithm based on k - shortest path

    對于由大量路由器和oxc通過光纖互連而組成的ipoverwdm網路,第三章創新性地提出了將ip層矛咣層綜合考慮進行:路由選擇,並利用k ? ?最短路由對有長度限制的請求進行資源分配的演算法。
  18. Accorded to the experimental research, under different flow area of flow valve and different adjusted pressure of relief valve, conclusion that the regulation of the pressure p1, p2 in the two cylinder chambers varied with the change of step load were as follows : when the throttle valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod decreased, meanwhile, it ' s time of rise, time to peak and the governing time all decreased. while the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    通過試驗研究得出系統在不同的流量閥開度、不同溢流閥調節壓力(進口壓力)下,液壓缸兩腔壓力p _ 1 、 p _ 2隨階躍負載變化的規律:當出口節流調速系統的回油路上串接節流閥時,隨階躍負載的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是減小的,上升時間、峰值時間以及調整時間也是減小的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  19. The mathematical model of multi - loop, which is improved through selecting new stator loops in this paper, can be used to simulate the transient behavior of external short circuit at machine ' s terminal and internal short circuit in the stator, not only under no - load condition with single machine but also under load condition connected to power network

    本文改進了原來的多迴路數學模型中對定子迴路的選擇,不僅可對同步發電機機端各種外部短路故障和單機空載下的各種定子內部故障進行暫態過程的模擬,還實現了負載時內部各種故障的暫態模擬。
  20. Abstract : this paper deals with the simulation result analysis of three phase synchronous generator with rectified output with stator y connected, as well as with stator connected. the curves of overlap angle, displacement angle and power factor with load are presented, and the tendency of these curves are also described

    文摘:對整流負載時凸極同步發電機定子繞組及y聯結模擬結果進行分析,繪出反映整流特性的換流重疊角、位移角以及功率因數隨負載變化曲線,並對變化趨勢進行分析。
分享友人