cut-off dam 中文意思是什麼

cut-off dam 解釋
截流壩
  • cut : vt (cut; cutting)1 切,割,截,斬,砍(樹),剪(發等);切斷,割下;採伐;剪下;修剪,刈。 I h...
  • off : adv 1 〈運動〉向那邊,隔開。 be off 走,去,逃。 I must be off 我得走了。 Where are you off to 你...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆水利樞紐壩基防滲墻施工過程中,通過生產性試驗選擇出了適合該防滲墻工程施工干擾大、工期緊、質量標準高的要求的施工技術,解決好了孔口塌孔的預防、處理及鋼筋籠和預理灌漿管下設等技術難題,保證了該防滲墻工程的成功建設。
  2. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑處理措施的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後防滲墻能安全施工和投入正常運用;完善了在復雜地質條件及強滲漏地層混凝土防滲墻的施工工藝和施工方法;提出了對病險水庫加固及在地質條件復雜地層中修建混凝土防滲墻的施工要點;同時提出了在強滲漏地層修建防滲墻的關鍵是在防滲墻施工前通過預注漿封閉強滲漏通道的重要論點;對塌坑一些處理措施中的不足之處亦進行了分析研究,供國內類似工程借鑒。
  5. Through the analysis of the status of huangbizhuang reservoir and other problems, such as its destruction caused by water seeping, and with the reference to the internal successful application, the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no. 0 + 840 and stake no. 5 + 740

    通過分析黃壁莊水庫現狀及存在的滲透破壞等問題,類比國內成功的工程實例,本工程副壩在樁號0 + 840至5 + 700採用在壩體和壩基建混凝土防滲墻處理措施。
  6. To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water. in this article, the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed. including the rock - fill dam, the stress and deformation distribution of cut - off wall, the deformation of sloping core, the incresment and subduction of pore water pressure and the effective stress situation calculation

    為確保大壩安全,並為大壩施工期和蓄水期運行決策提供必要的技術支持,本論文根據上壩土料的應力一應變一強度特性、滲透和固結等特性,對壩體進行了彈塑性應力變形計算和固結分析,包括大壩堆石體、防滲墻的應力及變形分佈和斜心墻的變形、孔隙水壓力增長及消散和有效應力狀態計算等。
  7. Demolition of concrete cut - off wall of dam by controlled blasting

    大壩防滲墻施工導墻控制爆破拆除
分享友人