dam block 中文意思是什麼

dam block 解釋
壩塊
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • block : n 1 片,塊,大塊;粗料,毛料;木料;石料;金屬塊;【建築】塊料,砌塊;【地質學;地理學】地塊。2 ...
  1. So, apart from many historical relics and tourist attractions, such as the ghost city of fengdu, stone treasure block, zhang fei temple and white emperor city, the 6, 000 meter long dam area adds much lustre to chongqing

    長江三峽的大半段已出現在重慶市境內, 6000米的庫區名勝古跡,諸如豐都鬼城,石寶寨、張飛廟、白帝城,使重慶更添風采。
  2. Application of the dam with laid dry block stone casing

    棘洪灘圍壩干砌石護坡塌陷原因分析及處理
  3. A separate structure is provided to block the space between the arch dam and the reservoir bank.

    需要另有一種單獨的結構物來填補拱壩的庫岸之間的空間。
  4. The base is divided into finite block element. so, the stress and load that this system divided can be calculated. combining analyzing morrow point dam on colorado river with this method, the rationality of it is validated

    應用上述方法,結合morrowpoint雙曲拱壩,計算了該壩的分載與徑向位移,其成果合理,驗證了本文建立的壩體虛擬彈性地基梁與壩基塊體有限元組合的拱壩分載法的合理性,且滿足工程精度的要求,有一定的實用價值。
  5. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  6. Analysis of xinanjiang dam no. 2 amp; amp; no. 3 block foundation thick shale softening amp; amp; argillation mechanism amp; amp; tendency

    3號壩段壩基厚層頁巖軟化泥化機理及趨勢分析
  7. Through analyzing the seepage observation data of huangtankou concrete gravity dam, foundation seepage behavior are reasonably evaluated. the reason of seepage force rising of individual monolith is impervious elements " flaw and drain holes " block. 4

    分析黃壇口大壩壩基滲流監測資料,正確評價了壩基防滲排水系統的工作狀態,指出了個別壩段滲透壓力升高是由於壩基防滲帷幕缺陷和排水孔被堵造成,為工程加固提供了科學依據。
  8. A study on the structural deformation of a special dam body with a comprehensive analysis method is presented, by taking section 33 of the qingtongxia dam as an example. the dam block is located at the abutment on the right bank, like an “ earth - retaining wall ”, whose cross section is “ high - heeled shoe ” sheped. because of the special structure and load condition, its deformation toward the downstream is large. deep research of its deformation law is conducted, and analysis of the special structure, the boundary condition of this dam block is performed, and the physical genesis of the large deformation of the dam block is revealed

    以青銅峽大壩33壩段為例,提出應用綜合分析法研究特殊壩體結構的變形規律.該壩段位於右岸壩頭,類似一「擋土墻」 ,斷面形狀如「高跟鞋」 .由於結構及受力條件特殊,產生了向下游的較大變形.本文應用綜合分析法(多種模型分析、結構計算等)對其變形規律進行了全面的分析研究,並重點對該壩段的特殊結構和邊界條件進行深入分析研究,弄清了該壩段向下游有較大變形的物理成因
  9. 5. based on longtan project, temperature control and crack prevention of a typical overflow section block of the high rcc gravity dam is studied as a case study

    以「十?五」國家電力公司科技攻關項目為背景,深入系統地進行了龍灘高碾壓混凝土重力壩典型溢流壩段的溫控防裂研究。
分享友人