dam construction technique 中文意思是什麼

dam construction technique 解釋
築壩技術
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • technique : n. 1. (專門)技術;(藝術上的)技巧,技能。2. 手法〈如畫法,演奏法等〉。3. 方法。
  1. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通過壩基現場抽水試驗試驗資料整理,在揭示黃土壩基降水特性規律的基礎上,確定可以反映現場抽水條件的的實用降水計算模型和參數;再根據現場抽水條件試驗開發的成井技術和計算模型計算壩基和壩肩兩個水文地質單元的降水井方案,並按工程類比法確定最終的降水方案;最後,通過施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足施工的要求。
  2. According to status of huxi bank in xuzhou, jiangsu province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method in the base of study and analysis

    本文結合南四湖湖西大堤地下採煤的具體情況,利用數值分析理論及堤防加固技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  3. According to status of huxi bank in xuzhoujiangsu province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method in the base of study and analysis

    本文結合江蘇省徐州市湖西大堤地下採煤的具體情況,利用數值分析理論及堤防加固技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  4. According to status of mengshan clay core dam in zibo, shandong province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method hi the base of study and analysis

    本文結合山東省淄博市萌山水庫心墻壩的具體情況,利用數值分析理論及土石壩加固新技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  5. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,碾壓混凝土壩的規模和高度正在日益擴大, 300m級的碾壓混凝土重力壩和200m級的碾壓混凝土拱壩的研究正方興未艾,對碾壓混凝土築壩技術、施工工藝和機械化程度的要求也更高。
  6. With the advent of 21st century, a greater development is taking place in the dam construction in china, where this technique must play more important role. therefore it has great advantage of technology and economy and will bring a bright prospect to the development in the dam construction in china

    進入二十一世紀,中國的大壩建設面臨著一個更大的發展高潮,外摻氧化鎂微膨脹混凝土築壩技術必將在其中起著很大的作用,因此,該項技術在我國大壩建設中具有重大的技術經濟優勢和發展前景。
  7. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. The technique of dam construction by weakly expansive concrete added with magnesia ( wecam ) is a new technique developed in china, in which appropriate light - burnt magnesia is added to dam concrete when produced to generate a special delayed expansive stress to compensate shrinking stress due to decrease of temperature so as to prevent concrete cracks. it not only is in favor of simplifing the method of temperature control and an effective solution to the crack problem of concrete dam, but also simplify the technology of dam construction and bring down the project cost, further more, speed greatly up the construction of concrete dam

    外摻氧化鎂微膨脹混凝土築壩技術是指在生產大壩混凝土時,摻入適量的輕燒氧化鎂,利用其特有的延遲膨脹補償混凝土壩的溫度應力,以防止混凝土壩產生的裂縫,這不僅有利於簡化溫控措施,有效地解決混凝土壩的開裂問題;而且簡化了施工工藝,降低了工程造價,大大了加快施工進展。
  10. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑處理措施的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後防滲墻能安全施工和投入正常運用;完善了在復雜地質條件及強滲漏地層混凝土防滲墻的施工工藝和施工方法;提出了對病險水庫加固及在地質條件復雜地層中修建混凝土防滲墻的施工要點;同時提出了在強滲漏地層修建防滲墻的關鍵是在防滲墻施工前通過預注漿封閉強滲漏通道的重要論點;對塌坑一些處理措施中的不足之處亦進行了分析研究,供國內類似工程借鑒。
  11. On principal points in construction technique of concrete - rubble gravity dam

    淺談砼砌石重力壩施工技術要點
  12. The paper expounds the essentiality of the application of database in the emulation system of water resources and hydropower engineering construction process, introduces the ado ( activex data object ) which is a very convenient database link technique, and narrates the course and detail of the database design by an example on the construction process of some rock fill dam with a core wall

    摘要闡述了數據庫技術在水電工程施工過程模擬系統開發中的重要性;介紹了一種極為方便的數據庫鏈接技術ado數據對象;通過心墻堆石壩填築施工過程模擬的實例,闡述了模擬數據庫設計的過程和細節。
  13. When the acoustic logging technique is used to determine the stress release rebound tension fissure plane of the dam foundation in the construction of such dam foundation, we should make an analysis of the anomaly and the geophysical trend surface so as to guarantee the reliability of the geophysical data and guide the change of the design and organize the construction

    摘要在壩基施工過程中,利用聲波測井方法確定壩基卸荷回彈張裂面應進行相對異常和地質物探趨勢面分析研究,才能保證物探資料的可靠性及直接指導設計變更和施工組織。
分享友人