dam construction 中文意思是什麼

dam construction 解釋
堤壩工程
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. According to status of huxi bank in xuzhou, jiangsu province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method in the base of study and analysis

    本文結合南四湖湖西大堤地下採煤的具體情況,利用數值分析理論及堤防加固技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  2. According to status of huxi bank in xuzhoujiangsu province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method in the base of study and analysis

    本文結合江蘇省徐州市湖西大堤地下採煤的具體情況,利用數值分析理論及堤防加固技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  3. According to status of mengshan clay core dam in zibo, shandong province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method hi the base of study and analysis

    本文結合山東省淄博市萌山水庫心墻壩的具體情況,利用數值分析理論及土石壩加固新技術,在深入分析研究的基礎上,提出相應有效,可行的加固措施。
  4. Zipingpu multi - purpose dam construction project is located at yingxiu - dujiangyan reach, upstream of minjiang river, west sichuan

    紫坪鋪水利樞紐工程位於四川省西部的岷江上游,映秀至都江堰市沙金壩河段上。
  5. Specifications for rolled earth - rockfill dam construction

    碾壓式土石壩施工規范
  6. Charateristics and load carrying capacity of csg dam construction materials

    壩築壩材料特性與抗荷載能力研究
  7. According to observations of some existing rcc dams at home and abroad, the rcc dam construction technologies are successful in general, but the problems of seepage still exist

    根據對國內外已建碾壓混凝土壩的運行觀測,總體來說碾壓混凝土築壩技術是成功的,但普遍都存在著滲漏問題。
  8. With the advent of 21st century, a greater development is taking place in the dam construction in china, where this technique must play more important role. therefore it has great advantage of technology and economy and will bring a bright prospect to the development in the dam construction in china

    進入二十一世紀,中國的大壩建設面臨著一個更大的發展高潮,外摻氧化鎂微膨脹混凝土築壩技術必將在其中起著很大的作用,因此,該項技術在我國大壩建設中具有重大的技術經濟優勢和發展前景。
  9. Feasibility study on dam construction for water storage in poyanghu lake

    鄱陽湖建閘蓄水的可行性研究
  10. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  11. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  12. Specifications for concrete face rockfill dam construction

    混凝土面板堆石壩施工規范
  13. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石壩建設中,借鑒道路園林工程中道沿機的擠壓滑模原理,創造性使用邊墻施工法,在每填築一層墊層料之前,用擠壓式邊墻機製作出一個半透水混凝土小墻,然後在其內側按設計鋪填壩料,用振動碾平面碾壓,合格后重復以上工序。
  14. The technique of dam construction by weakly expansive concrete added with magnesia ( wecam ) is a new technique developed in china, in which appropriate light - burnt magnesia is added to dam concrete when produced to generate a special delayed expansive stress to compensate shrinking stress due to decrease of temperature so as to prevent concrete cracks. it not only is in favor of simplifing the method of temperature control and an effective solution to the crack problem of concrete dam, but also simplify the technology of dam construction and bring down the project cost, further more, speed greatly up the construction of concrete dam

    外摻氧化鎂微膨脹混凝土築壩技術是指在生產大壩混凝土時,摻入適量的輕燒氧化鎂,利用其特有的延遲膨脹補償混凝土壩的溫度應力,以防止混凝土壩產生的裂縫,這不僅有利於簡化溫控措施,有效地解決混凝土壩的開裂問題;而且簡化了施工工藝,降低了工程造價,大大了加快施工進展。
  15. Article 26 no excavation of sand, dike and dam construction, dumping of rubbish, reduction or expansion of river - beds, or demolition operations may be carried out within 200m either upstream or downstream of large highway bridges and highway ferries

    第二十六條不得在大型公路橋梁和公路渡口的上、下游各二百米范圍內採挖沙石、修築堤壩、傾倒拉圾、壓縮或者擴寬河床、進行爆破作業。
  16. Through the non - linear fem static and dynamic analysis of the rcc gravity dam of kelashuoke reservoir by ansys, the deformation and stress law of dam body and its foundation under various working conditions is studied so as to get to know the working situation of the dam body and foundation rock under design conditions and to evaluate the reliability of the dam construction scheme

    摘要採用美國ansys結構分析軟體,通過對喀拉朔克水庫碾壓混凝土重力壩方案進行非線性有限元靜力和動力分析,研究探討了壩體及基礎在各種工況下的變形和應力規律,以了解壩體和基巖在設計條件下的工作形態,對方案的可靠性進行了評價。
  17. Existing problems and suggestions on management of warping dam construction

    淤地壩建設管理中存在的問題及建議
  18. Large - scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction

    摘要盤石頭水庫面板堆石壩,在填筑前進行了大型碾壓試驗,復核設計壓實標準,確定各區築壩材料的填築參數,供壩體施工採用。
  19. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  20. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
分享友人