  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面板堆石壩上游坡面傳統的墊層料超填、削坡、斜坡碾壓的施工方法存在許多弊端。
  3. Application of concrete extrusion sidewall in face rock - fill dam in shuanghekou

    混凝土擠壓邊墻在雙河口面板堆石壩中的應用
  4. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  5. Key way cutting construction on binding face of new and old concrete for dam heightening of danjiangkou project

    丹江口大壩加高工程新老結合面鍵槽切割施工
  6. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  7. Surveying setting - out of distorted face for right dam abutment in yushi reservoir

    玉石水庫右壩頭扭曲面開挖的測量放樣
  8. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石壩填築施工設計
  9. Rock material site selection and quality evaluation for rockfill dam with concrete face slab in songjianghe hydropower station

    松江河水電站面板堆石壩石料場選擇和質量評價
  10. The computation results show that the deformation of the dam appears in evident increment and the creep has an obvious influence on the deformation and stress of the face slab

    結果表明,考慮堆石流變后的壩體沉降有明顯的增加,對面板的應力變形狀態有較大影響。
  11. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面板、分期蓄水的水布埡高面板堆石壩,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施工程序減小面板應力變形具有重要意義。
  12. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和總結。
  13. Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action

    考慮拱效應的高面板堆石壩流變收斂機制研究
  14. Combined with a concrete face rock - fill dam in process, the simulation analysis on the face slab ' s temperature field and temperature stress is processed in connection with the condition of temperature sudden drop caused by daytime temperature differences and cold wave and so on during the construction period

    摘要結合某在建的混凝土面板堆石壩,針對施工期日溫差及發生寒潮等氣溫驟降情況,進行了氣溫驟降條件下面板溫度場及溫度應力的全過程模擬分析。
  15. Technical specifications for joint seal of concrete face rockfill dam

    混凝土面板石壩接縫止水.技術規范
  16. The parameters of the creep constitutive model can be obtained from the back analysis according to the observed deformations of concrete face rockfill dam ( cfrd ) in prototype and then applied to predict the post deformation of the dam with the effect of creep taken into account

    採用該方法對某堆石壩9參數流變模型參數進行反演分析,計算結果表明,利用反演的模型流變參數所計算的壩體流變變形與實測資料在發展規律及數值上均比較吻合。
  17. Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam

    水布埡混凝土面板堆石壩填築料開采爆破試驗
  18. Specifications for concrete face rockfill dam construction

    混凝土面板堆石壩施工規范
  19. The stress - deformation behavior of diaphragm walls of concrete face rockfill dam built on thick alluvium deposit was analyzed using the numerical analysis method

    摘要採用數值分析方法對深覆蓋層上混凝土面板堆石壩的防滲墻應力變形性狀進行了研究。
  20. Application of acrylamide sand grout in treatment of upstream dam face in huangbizhuang reservoir

    丙乳砂漿在黃壁莊水庫壩上游面處理中的應用