dam length 中文意思是什麼

dam length 解釋
壩長
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • length : n. 1. 長,長度,長短。2. (時間的)長短,期間。3. (賽艇的)一艇的長度;一馬的長度。4. 程度,范圍。5. 【板球】球程;投至適當距離的球。6. 【語言學】音長。7. 一段,一節。
  1. Fluid noise mainly comes from out put pulsation of rate of flow, the main reason of out put pulsation of rate of flow is the instant high pressure return flow that obturation cubage produced when the big round curve pressure transition. the v trough on the port plate can reduce the fluid noise. in this paper, the author based on the acting of dam a river and condensability of liquid and used matlab language as tool to calculate the v trough on the original port plate and drew out the p - t diagrammatic curve and analyzed its shortcoming and improved the design of original v trough and got that the best size of its angle was 12. 3 and its length was 5mm and the cross section was an equilateral triangle

    流體噪聲主要來源於輸出流量脈動,造成輸出流量脈動的主要原因是閉死容積在大圓弧段壓力切換時產生的瞬時高壓迴流,在配流盤上開設v型尖槽可降低因高壓迴流而引起的流體噪聲,本文以截流作用和液體的可壓縮性為理論依據,以matlab語言為工具,對原配流盤上的v型尖槽進行了理論計算,繪制出p - t圖線,分析了它的不足,並對原有v型尖槽進行了優化設計,得出了v型尖槽的最佳幾何尺寸:配流盤平面上的v型尖槽的兩邊的夾角為12 . 3 ,槽長5mm ,槽的橫截面為等邊三角形。
  2. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  3. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  4. Accessing the data, the knowledge, the model and the relative parameter from database, knowledge - base, model - base and the interface, the expert system automatically infers and calculates the maximum depth and length of stilling basin the bantai hydraulic project and the xiangyanghe dam have been given as the example

    以班臺閘和向陽河壩為工程實例,根據數據庫、知識庫、模型庫中的相關數據、知識經驗、模型,以及人機交互界面的相關參數,進行分析推理計算,求出最大消力池深和池長,對系統的相關功能模塊進行的驗證。
  5. Pineapple dam nature trail is about 0. 9 km in length and follows the footpath starting from the shing mun country park visitor centre and running along the western edge of the shing mun or jubilee reservoir

    一九三三年以前,此地盛產菠蘿,因而以菠蘿壩為名。此地區曾作為興建水塘的采泥區,植物被嚴重破壞后經大規模的植林,始有現今的景象。
  6. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
分享友人