deep hole drilling 中文意思是什麼

deep hole drilling 解釋
深孔鉆孔
  • deep : adj 1 深的;深處的;…深的,有深度的。2 深遠的;深奧的,奧妙的;深謀遠慮的。3 深陷…中;埋頭…中,熱...
  • hole : n 1 洞,穴,孔;(衣服等上的)破洞;傷口;漏洞;窩,坑;水流的深凹處,(河道的)緩流窪。2 (獸的...
  • drilling : n 1 鉆孔;【礦物】鉆井;〈pl 〉鉆屑,鉆粉。2 操練,訓練。n 【農業】條播。 ridge [furrow] drilling...
  1. New drill bit for drilling small diameter deep hole

    新型小徑深孔鉆頭
  2. Then the article analyses the effecting elements about the economic result of blasting and puts forward some improving measures, and summarizes optimizing model on economic result of blasting both internal and overseas bearing upon. the theory is based on the blasting cost model, which proposed by dr. zhong hanrong. combining with the specialties of water and electricity engineering, starting off through blasting result, it emphasizing considers drilling cost, deep hole bench blasting cost, reblasting cost, and the cost of bottom fleet hole blasting that in mixed loading emulsion explosive blasting

    本文在加拿大鐘漢榮博士提出的爆破成本模型基礎上,結合水電工程的特點,從爆破效果出發,著重考慮了應用混裝乳化炸藥爆破的鉆孔成本、深孔梯段爆破成本、二次爆破成本和爆破后根底淺孔爆破成本,以塊度、振動、安全為約束條件,以這四項成本最小為目標函數,廣泛收集各種爆破經濟技術條件,建立了爆破優化經濟數學模型。
  3. Drilling was slow, requiring many years and even decades to complete a single deep hole.

    鉆進是緩慢的,往往需要幾年甚至幾十年才完成一眼深井。
  4. Various deviation surveying, preventing and controlling systems used for continental scientific drilling and deep hole drilling in crystalline rock are collected and summed

    收集和總結了主要科學鉆探項目和結晶巖深孔取心鉆探項目採用的鉆孔測斜、防斜和糾(造)斜系統。
  5. Drilling time will be lasted and lateral force on casing exerted by drill pipe will increase in case of drilling deep well, ultradeep well, high inclined hole, extended reach well and horizontal well, therefore, friction and wear between casing and drill pipe became a severe problem

    在深井、超深井、大斜度井、大位移井及水平井中,鉆井時間延長、鉆柱作用在套管上的側向力增高,因此套管和鉆柱的摩擦與磨損問題越來越突出。
  6. Medical equipment - artificial hollow bones, high precision parts deep hole drilling

    醫療器材?人造骨中空孔、精密零件深孔加工
  7. Deep - hole drilling

    深孔鉆削
  8. According to the problems occurred during the first stage of five well drillings in qianmiqiao qianshan structure, technical measures, such as optimal well configuration, bottom hole assembly, bit type and drilling fluid were taken during the second stage of another five deep drillings and better results were achieved. it is helpful to explore and develop in qianmiqiao qianshan structure in dagang oilfield

    分析了千米橋潛山構造第一階段5口井施工過程中遇到的技術難題,從優化井身結構、優選鉆具組合、鉆頭優選、優選鉆井液體系及組織管理等方面給出了相應的技術措施和對策,並在第二階段5口井的施工中進行了應用,且取得了明顯的效果,為大港油田千米橋潛山構造的勘探開發奠定了堅實的基礎。
  9. Abstract : according to the problems occurred during the first stage of five well drillings in qianmiqiao qianshan structure, technical measures, such as optimal well configuration, bottom hole assembly, bit type and drilling fluid were taken during the second stage of another five deep drillings and better results were achieved. it is helpful to explore and develop in qianmiqiao qianshan structure in dagang oilfield

    文摘:分析了千米橋潛山構造第一階段5口井施工過程中遇到的技術難題,從優化井身結構、優選鉆具組合、鉆頭優選、優選鉆井液體系及組織管理等方面給出了相應的技術措施和對策,並在第二階段5口井的施工中進行了應用,且取得了明顯的效果,為大港油田千米橋潛山構造的勘探開發奠定了堅實的基礎。
  10. This paper presents the study of the full scale drilling simulating test device under the condition of bottom hole pressures. this device is the first one in china hich can simulate the bottom hole pressures in 6000m deep well

    本文研究論述的全尺寸鉆井井底壓力模擬裝置,是我國第一臺模擬井深6000米壓力環境的全尺寸鉆井模擬試驗裝置。
  11. Utility vibration cutting ultrasonic vibration mini - deep hole drilling

    超聲振動鉆削小深孔工藝及裝備
  12. Multi - spindle deep hole drilling machine

    多軸深孔鉆床
分享友人