divided beam system 中文意思是什麼

divided beam system 解釋
分束系統
  • divided : adj. 1. 被分割的;分離的;對立的,意見分歧的。2. 【植物;植物學】(葉)分裂的;全裂的。
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. Generally, the skew bridge ' s calculation theories can be divided into three types : the category 1 is the plank theories method, such as the finite difference method, the finite element method and the finite strip method, etc ; the category 2 is the beam theories, such as the grid beam theories, the general grid theories, the rigid cross - beam method, the elastically - supported continuous beam method and the bar system analytical method, etc ; the category 3 is the practical method, such as the g - m revising method, the grid - beam simple method and ghali form coefficient method, etc

    目前關于斜梁橋的計算理論和方法概括起來,大致可以分為三類:第一類為板理論方法,如有限差分法、變分法、有限單元法、有限條法等;第二類為梁理論法,如格構梁理論、一般格構理論、剛性橫梁法、彈性支承連續法、桿件結構的分析方法;第三類為實用計演算法,荷載橫向分佈的計算方法如g ? m修正法、格構梁的簡易法、 ghali表格系數法等。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. An interferometric lithographic experimental system with maskless and multi - beam exposure is built. an experimental system with wavefront divided by a trapezoidal prism and with selectable diaphragms for kinds of multi - beam, multiple - exposure interferometric lithography research is proposed. the experimental study on interferometric lithography is carried out

    建立了無掩模多光束多曝光干涉光刻實驗系統,提出了一種採用梯形棱鏡進行波前分割和利用可選擇光闌進行多種多光束多曝光干涉光刻研究的實驗系統,進行了干涉光刻實驗研究,對模擬和實驗結果進行了分析。
  4. The asipp microbeam has brought widespread attention, and has profound and far - reaching signification in bioengineering fields. this thesis mainly focuses on discussing study and implement of the control program for the asipp microbeam. the control program can be divided into three logical modules : microscope stage controller, count of the number of radiated ions and control of the electronic beam shutter, and micro - imaging system

    本課題作為實施單粒子束照射細胞系統的一部分,主要任務是通過對asipp微束裝置計算機控制的研究,設計「 asipp微束裝置計算機控制系統」軟體,確保實驗過程中定量輻射的精確度和定位輻射的準確性,實現真正意義上的「定點輻射」和「定量輻射」 。
分享友人