earned value analysis 中文意思是什麼

earned value analysis 解釋
已增價值分析
  • earned : 無理由的應得的/有正當理由的
  • value : n 1 價值;重要性;益處。2 估價,評價。3 價格,所值;交換力。4 (郵票的)面值。5 等值;值得花的代...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  1. The problem and solution of estimate at completion forecasting method in earned value analysis

    掙值分析中項目完工成本預測方法的問題與出路
  2. Lastly, in the terms of controlling the schedule and the cost, we cancelled the previous methods that time was indicated the schedule and that amount of capital invested was calculated the project schedule. we calculated the realistic project schedule by the means of the earned value that we calculated amount of capital required using the working procedure, in the meantime, we applied the analysis of the cost current curve to achieve the cost and the schedule integrated

    在進度與費用控制上,改變原來用時間表示項目進度或用完成投資額來計算項目進度的做法,用完成工序(或工作量)相應的計劃資金需求量,稱為掙值( earnedvalue ) ,來計量項目的實際進度,利用費用流曲線的分析,實現了費用與進度的聯合控制。
  3. Based on the theory of " earned value ", this article analyzed the requirement and breaks down the function then designs the modules by using object - oriented analysis and design. the subsystem is realized in vb. net and the database is built on sql2000server

    本文以「贏得值」理論為依據,運用目前流行的面向對象的系統分析和設計方法,對項目管理信息系統中的進度費用控制子系統的功能進行了需求分析、功能分解及模塊設計。
  4. To perform each task, earned value analysis uses three fundamental values : the budgeted cost of work scheduled ( bcws ), the actual cost of work performed ( acwp ), and the budgeted cost of work performed ( bcwp )

    對于每項任務,盈餘分析使用三個基本量:計劃工作量的預算成本( bcws ) 、已完成工作量的實際成本( acwp )和已完成工作量的預算成本( bcwp ) 。
  5. Analyze costs over time with earned value analysis

    用盈餘分析的方法分析成本(用時間表示)
  6. Earned value analysis measures a project ' s performance

    盈餘分析可分析項目的執行情況。
  7. Why you should perform earned value analysis

    為什麼應當執行盈餘分析
  8. You can also use earned value analysis to identify cost variances, such as the difference between a task ' s estimated and actual costs

    您也可以使用盈餘分析找出成本差異,如某項任務的估計成本和實際成本之間的差異。
  9. When you want to compare your expected progress with the actual progress to date for tasks that have resources assigned, you can use earned value analysis

    需要按日期比較分配了資源的任務的預期進度和實際進度時,可以使用盈餘分析方法。
  10. If you want to know whether the amount of money spent on a task or the project as a whole is proportional to the work that ' s been completed - in other words, whether you ' ll run out of money before the project ends - you can perform an earned value analysis

    如果您想要了解已經花在某項任務或整個項目上的錢數是否與已完成的工時成正比,換句話說,是否會在項目完成之前就花光了錢,那麼可進行「盈餘分析」 。