evaluation engineering 中文意思是什麼

evaluation engineering 解釋
工程評價
  • evaluation : n. 1. 估價,評價。2. 【數學】賦值,值的計算。
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. Evaluation of bladder acellular matrix graft used as cell carrier for tissue engineering in rabbits

    兔膀胱無細胞基質作為組織工程學細胞載體的評價
  2. It applies the theory of system engineering and gives a fuzzy comprehensive evaluation method of apts and an application example

    在研究中應用系統工程理論提出了先進的公共交通系統的模糊綜合評價方法,並給出了評價示例。
  3. Electric engineering bidding base line evaluation and bidding techniques

    電力工程標底評價與報價技巧
  4. Evaluation of decorative engineering completed after use

    裝飾工程竣工使用后評價
  5. Evaluation of investment risk in hydraulic engineering based on bp network

    網路的水利工程投資風險評價
  6. The third, it analyzes some question about feasibility analysis and provides some means to solve theses question. the fourth, it studies some important problem about real estate feasibility analyzing such as : the market segment and market position of real estate, consumer market and consumer buying action analyzing, the financial evaluation of real estate project, the analysis of risk of real estate project, the indefiniteness analyzing of real estate project. in the part of feasibility analyzing of s real estate project, it analyzes the feasibility of the s project from three aspects including marketing feasibility, engineering and technology feasibility, economical feasibility, then makes a conclusion of feasibility analyzing of s project, together with some suggestion to the problem of s project

    第四,對房地產開發項目可行性分析中應重點關注的一些問題進行了較為深入的探討,具體包括:準確地進行房地產市場細分與定位:房地產市場細分的準則,房地產市場定位的任務,房地產市場定位的誤區與對策;認真研究消費者市場及消費者購買行為:影響消費者購買行為的因素,消費者購買決策過程分析,消費者購買行為分析,消費者分析通常應涉及的問題;科學地進行開發項目的財務評價:靜態評價及其優缺點,動態評價及其優缺點;加強開發項目的風險分析:房地產開發項目風險的特點類型,風險的總體狀況及變化趨勢,開發項目風險的防範策略;重視開發項目的不確定性分析:盈虧平衡分析,敏感性分析,概率分析。
  7. Indeterminacy analysis in engineering economical evaluation

    工程經濟評價的不確定性分析
  8. Meanwhile, it sets an example for other metallurgic engineering ( reform ) projects in decision - making and evaluation of a project

    同時也達到舉一反三,為其他冶金工程(改造)項目進行評價和決策提供借鑒參考的目的。
  9. Cell cultivation, pyrogen and hypersusceptibility tests were applied in the biographic evaluation and the results indicated that all the materials were negative and the cell could grow well on the surface of collagen sponge. so the material prepared in this study can be used as the scaffold of tissue engineering cornea

    本實驗還對材料進行了角膜細胞的初步培養,結果顯示,材料能良好地支持角膜細胞的生長,該材料可作為組織工程人工角膜的支架材料。
  10. Lama exper in evaluation, planning, edsign, environmental appraise, engineering cost, inspection and relative scientific research subject advisory of haror, wharf, breakwater, and slipway project in prot and waterway engineering

    擅長對水運工程中的港口、碼頭、防波堤、船臺、滑道等工程項目的評估、規劃、設計、環境評價、工程造價、監理及有關科研課題的咨詢。
  11. The paper introduces the risk analysis and evaluation method of engineering investment based on fuzzy mathematics and a new way of calculating steelyard weight. the new way of calculating steelyard weight remedies the limit of the common way and reduces the time of calculating. the paper keeps the principle of synthesizing the way of the qualitative analysis and quantitative analysis

    文章介紹了基於模糊理論和一種新的權重系數計算方法對工程項目投資進行風險分析和評估,這種新的權重系數計算方法彌補了常規方法的局限性,並大大地減少了計算量,遵循定性分析與定量分析相結合的原理,將模糊理論與這種新的權重系數計算方法有效的結合在一起。
  12. As the popularization and application of integrate logistics support engineering thinking at our country industry field and the military continuously, the evaluation of equipment integrate logistics support capability become the mostly means to check up the stand and fall of equipment character of supportable design, the efficiency of the equipment using supportability and the decision - making to equipment ' s continuous model development, at the same time, along with the development and maturity of computer simulation technique, the research of analysing and evaluating equipment ' s effectiveness steps into a new stage, we can get the handle and maintain data on the base of originally lasting accumulating in existence by utilizing the computer emulating technique, which is necessary to analyzing and evaluating the ground - to - ground missile ' s integrate logistics support effectiveness, via simulating the handling and maintaining process of ground - to - ground missile weapon, we can evaluate the ils effectiveness comp rehensively, impersonally, veraciously, consequently, provide decision - making gist to make the best support project

    隨著綜合保障工程思想在我國工業界和軍方不斷普及和推廣應用,裝備綜合保障能力的評估成為檢驗裝備保障性設計好壞、裝備使用保障效能高低以及裝備后續型號發展決策的主要手段,同時隨著計算機模擬技術的不斷完善和成熟,裝備效能分析與評估研究進入了一個新階段,我們可以在導彈武器綜合保障效能分析與評估所需使用與維修數據原始積累的基礎上,利用計算機模擬導彈武器在真實使用環境中的使用維修過程,達到對導彈武器系統的綜合保障能力進行更全面、客觀、準確的評價目的,從而為裝備保障部門制定最優的保障方案提供更好的決策依據。
  13. The establishment of srqd system inaugurates one path to surficial rock mass quality evaluation, and the establishment of irqd system is of significant value in reducing prophase engineering cost and in ensuring engineering safety. etc

    表面rqd指標體系的建立,為巖質邊坡表面破碎程度評價指出了一條未來的研究道路。整體rqd指標體系的完善對減少工程前期費用、保證工程安全等,均具有非常重要的工程意義。
  14. Standard for quality inspection and evaluation of petroleum construction engineering - pipeline crossing and aerial crossing project

    石油建設工程質量檢驗評定標準管道穿跨越工程
  15. The evaluation of sand liquefaction is the most important content of engineering reconnaissance and the aseismatic design. so evaluating the sand liquefaction objectively and exactly is the precondition of taking preventive measures on areas where liquefaction easily occurs. it also relates closely to the safety and economic benefits of the projects

    地震砂土液化評判是工程勘察和抗震設計的一項首要內容,故客觀、準確地評價砂土液化,是對有可能發生液化的區域或地段進行有針對性的預防處理的前提,是關繫到工程建築的安全使用和工程建設的經濟效益的重要問題。
  16. In this paper, two key strategies in earthquake risk assessment and risk management for urban areas are studied. one is ground motion based vulnerability evaluation method for buildings which needs to be solved urgently in earthquake risk assessment in china. the other one is financial instruments, such as insurance, reinsurance and catastrophe bonds ( cat bonds in brief ), combined with engineering earthquake risk evaluation which must be faced in earthquake risk management after china entered wto

    本文集中研究了地震風險評估和風險管理中的兩個重要問題,一個是當前地震風險評估中急需解決的,基於地震動參數的房屋建築易損性評估方法;另一個是我國加入wto以後地震風險管理必然會面臨的,與工程地震風險評估密切結合的地震保險、再保險和巨災債券等金融手段。
  17. Evaluation report of the engineering contracting market in singapore

    新加坡工程承包市場評估
  18. To evaluate the mine engineering geological conditions and for making - up an engineering activity plan that guides the mine development, an engineering geological environmental analysis of aoshan mining area in nanshan mine, maanshan iron and steel co. was made. through rock property analysis, single factor analysis and comprehensive evaluation, the coordinability of various factors were determined

    為評價礦山工程地質狀況,指導礦山開發的工程活動規劃,開展了馬鋼南山礦凹山礦區的工程地質環境分析,通過巖性分析、單因素分析及綜合評價,得出各因素的可協調性結果。
  19. The design for assembly ( dfa ) is an important enabling technology in concurrent engineering. g boothroyd and p. dewhurst of university of massachusetts firstly gave this terminology when they applied a method to evaluate the performance of product assembly design. dfa evaluation method is still developing with the deep research of concurrent engineering

    Dfa這一術語,最早是由美國馬薩諸塞大學( universityofmassachusetts )的gboothroyd和p . dewhurst提出的,當時主要採用的是計算評分的方法來對產品的可裝配性進行定量的評價。
  20. Feasibility study on construction project, investment budget calculation, engineering project cost estimation, final account settlement and calculating the cost bottom data for tendering project and project ' s economic evaluation, engineering cost surveillance and control

    建設項目可行性研究、投資估算、工程概(預、估)算及標底編審、項目經濟評價、工程造價監控。
分享友人