extra terms 中文意思是什麼

extra terms 解釋
額外條款
  • extra : adj 1 額外的,附加的,補充的。2 另外收費的。3 特大的;特優的,特級的。n 1 外加物;贈品,附加物;...
  • terms : 按貨幣計算
  1. Abstract : based on the analysis of the main failures discovered in pavement on steel deck plate and the demanding service condition of the pavement on steel deck, high - temperature rutting test, low - temperature bending test and controlled stress flexural fatigue test are used to study the performance of asphalt mixtures modified by epoxy resin including high - temperature stability, low - temperature cracking - resistance, and fatigue cracking - resistance, which are served to evaluate the modification effect of epoxy resin of different contents. with the addition of epoxy resin, all the three performances are improved greatly. however, when the amount of epoxy resin added is over a certain value, the modification effect will be stable with no extra benefit detected. finally, in terms of the properties of the three respects, 20 ?, 30 ?, 30 ? are given separately as the proposal adding contents

    文摘:在分析鋼橋面鋪裝層主要病害和特殊工作環境的前提下,分別採用高溫車轍試驗、低溫小梁彎曲試驗和控制應力小梁彎拉疲勞試驗,研究了不同環氧樹脂摻量下的環氧樹脂改性瀝青混合料的高溫穩定性、低溫抗裂性和抗疲勞性能.試驗結果表明:環氧樹脂對這3個方面都有很大的改進效果,但改性效果和樹脂的添加量並不是一個無限遞增的關系,當添加量超過一定數值以後,改性的效果將趨于平穩.最後就高溫、低溫、疲勞3個方面分別提出環氧樹脂添加量為20 ? , 30 ? , 30 ?的建議值
  2. Based on the analysis of the main failures discovered in pavement on steel deck plate and the demanding service condition of the pavement on steel deck, high - temperature rutting test, low - temperature bending test and controlled stress flexural fatigue test are used to study the performance of asphalt mixtures modified by epoxy resin including high - temperature stability, low - temperature cracking - resistance, and fatigue cracking - resistance, which are served to evaluate the modification effect of epoxy resin of different contents. with the addition of epoxy resin, all the three performances are improved greatly. however, when the amount of epoxy resin added is over a certain value, the modification effect will be stable with no extra benefit detected. finally, in terms of the properties of the three respects, 20 ?, 30 ?, 30 ? are given separately as the proposal adding contents

    在分析鋼橋面鋪裝層主要病害和特殊工作環境的前提下,分別採用高溫車轍試驗、低溫小梁彎曲試驗和控制應力小梁彎拉疲勞試驗,研究了不同環氧樹脂摻量下的環氧樹脂改性瀝青混合料的高溫穩定性、低溫抗裂性和抗疲勞性能.試驗結果表明:環氧樹脂對這3個方面都有很大的改進效果,但改性效果和樹脂的添加量並不是一個無限遞增的關系,當添加量超過一定數值以後,改性的效果將趨于平穩.最後就高溫、低溫、疲勞3個方面分別提出環氧樹脂添加量為20 ? , 30 ? , 30 ?的建議值
  3. If insurance for additional amount and / or for other insurance terms is required by the buyers, prior notice to thiseffect must reach the sellers before shipment and is subject to thesellers ' agreement, and the extra insurance premium shall be for thebuyers ' account

    如買方需增加保險額及/或需加保其他險,可於裝船前提出,經賣方同意後代為投保,其費用由買方負擔。
  4. 2 if more than 5 % of the landed shipment are bales two grades inferior to the contract grade in terms of quality and staple, then in addition to price deduction compensations as in articles 8. 1 and 8. 2, the buyer shall be given extra liquidated damages equivalent to 20 % of the contract value of the total defective bales

    2如果合同規定品級、長度與到岸檢驗品級、長度相差2個級的棉包數量占該批棉包總數量的比例超過5 %的,除按上述8 . 1 、 8 . 2條款規定的差價率補償外,還應按全部降級棉包合同金額的20 %作為違約金賠償給買方。
  5. 2 under cfr / cif terms : the seller shall notify the buyer of the ship name, ship age ( for aged ship the seller shall pay the over - age extra premium ), ship flag, shipment date, shipment port, destination port, contract number, number of the bill of lading, total price, gross weight and net weight within 48 hours after the shipment notification from the shipping line

    2如為cfr / cif成交:賣方應在收到船公司的裝運通知后48小時內,通知買方船名、船齡(老船賣方要付超齡加保費) 、船旗、裝船日期、裝船口岸、目的港、合同號、提單號、總金額、毛重、凈重。
  6. In practical terms it didn't matter, since the extra amount would have appeared as a credit on the following month's bill.

    這本來沒有什麼,多交的部分會被算作預付的下月貸款。
  7. Under cfr / cif terms : the seller shall notify the buyer of the ship name, ship age ( for aged ship the seller shall pay the over - age extra premium ), ? ship flag, shipment date, shipment port, destination port, contract number, number of the bill of lading, total price, gross weight and net weight within 48 hours after the shipment notification from the shipping line

    如為cfr / cif成交:賣方應在收到船公司的裝運通知后48小時內,通知買方船名、船齡(老船賣方要付超齡加保費) 、船旗、裝船日期、裝船口岸、目的港、合同號、提單號、總金額、毛重、凈重。
  8. Both no doubt judged that the return on investment, in terms of increased fees, outweighed the extra borrowing costs

    兩校都被確定投資的利潤,從增加的費用方面考慮,超過了其成本。
  9. You could grow into extra capacity over time, but too much extra can waste time and money in terms of excess hardware, setup and configuration, and ongoing management of the infrastructure

    隨著時間的推移,您可能會逐步熟悉一些額外的功能,但是過多的功能可能會在以下方面造成時間和資金的浪費:過多的硬體、設置和配置,以及正在進行的基礎設施管理。
分享友人