fill rock 中文意思是什麼

fill rock 解釋
充填料
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  1. Stress analysis of the rock fill dam with asphaltic concrete core wall

    冶勒堆石壩瀝青混凝土心墻型式及尺寸研究
  2. Application of concrete extrusion sidewall in face rock - fill dam in shuanghekou

    混凝土擠壓邊墻在雙河口面板堆石壩中的應用
  3. And the consumption which are caused by the deformation of the rock mass and the consumption which fill all the void space of the joint can be got. then the block coefficient k of the this geologic condition can be got by the actual consumption of the injection grout in the practical grouting

    本論文中主要通過有限元法來計算巖體的變形,並進而求得由巖體變形引起的那部分注漿量和完全充填節理裂隙的注漿量,再根據實際工程的實際注漿量來計算試驗所代表的地層的充填系數k 。
  4. ( 3 ) according to the actual geology situation in the material field, use the " alternation " principle of the value engineering analysis methods, and then find a better construction method to satisfy the requirement of rock - fill material, through using chamber blasting to substitute muffling and using an - fo to substitute ammonium nitrate explosive, and then huge economical benefits were gained, for example, the unit cost of its rock - fill material reduced from 11. 77 m3 to 7. 17 / m3, and directly reduced the total cost by 4. 26 million of cost

    ( : 3 )依據料場的實際地質情況,通過價值工程活動,利用價值分析的「代替」原理,在滿足堆石料功能不變的條件下,採用洞室爆破代替深孔梯段爆破,採用按油炸藥代替錢梯炸藥,使得堆石料的開采成本顯著降低,從投標價的h . 70元/ m3降低到7 . 17元/ m3 ,降低了4 . 53元/ mj ,以上壩堆石料94 . 2萬m 「計,直接降低成本426 . 75萬元,產生了巨大的經濟效益。
  5. I was so amaz d with the thing it self, having never felt the like, or discours d with any one that had, that i was like one dead or stupify d ; and the motion of the earth made my stomach sick like one that was toss d at sea ; but the noise of the falling of the rock awak d me as it were, and rousing me from the stupify d condition i was in, fill d me with horror, and i thought of nothing then but the hill falling upon my tent and all my houshold goods, and burying all at once ; and this sunk my very soul within me a second time

    完成圍墻后的第二天,我幾乎一下子前功盡棄,而且差點送命。事情是這樣的:正當我在帳篷後面的山洞口忙著幹活時,突然發生了一件可怕的事情,把我嚇得魂不附體。山洞頂上突然倒塌下大量的泥土和石塊,從巖壁上也有泥土和石頭滾下來,把我豎在洞里的兩根柱子一下子都壓斷了,發出了可怕的爆裂聲,我驚慌失措,全不知道究竟發生了什麼事,以為只不過像上回那樣發生了塌方,洞頂有一部分塌了下來。
  6. Application of distributed optical fiber temperature sensing technology to leakage monitoring for rock - fill dams with face slabs

    分散式光纖溫度傳感技術用於面板堆石壩面板滲漏監測
  7. The foundation for an earth - fill dam would be the natural soil or rock on which the dam is placed. concrete footings or piles and pile caps are often referred to as foundations without including the soil or rock on which or in which they are placed

    一)關于支持基礎結構影響土壤. (三)關于基礎結構支持關巖. (二)結構得到一堆地基樁,使樁可安裝在土壤和終止一切小費支持是從土壤中,也可以安裝,使復蓋巖小費.結合混凝土地基土壤和巖石上的地基或支持
  8. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石壩工程、灰渣築壩技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平的成果。
  9. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和總結。
  10. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  11. Rock fill mound foundation

    毛石堆地基
  12. Figure 7 - typical section of rock fill mound foundation for cooling water pumping station

    圖7 -冷卻用水抽水站毛石堆地基剖面圖
  13. The use of a vertical seawall resting above the rock fill mound would minimize the width of the base

    在毛石堆上建造垂直海堤可減少底座的闊度
  14. The rock fill mound has the lowest construction cost, about 9 million for the criii including the cost of rock

    -毛石堆的造價最低,佔中區填海第三期工程約900萬元包括石填料的成本。
  15. The pile foundation or mat foundation methods would cost considerably more than 10 times that of a rock fill mound foundation

    -樁柱地基與席式地基的造價較毛石堆地基的造價超出10倍。
  16. The slope of the rock fill mound is inclined about 35 degrees to the horizontal. the deeper the dredging level, the wider the base of rock fill required

    -毛石堆與水平面的角度約35o ,越挖得深,毛石堆地基底座的闊度便要越大。
  17. The rock fill mound foundation has the merit of simple construction method. after dredging the soft marine clay, the rock fill is then laid into position by barge until the desired elevation is reached

    -毛石堆地基的優點是建造方法簡單,只需在挖走松軟的海泥后,以躉船把石填料投放在適當位置至所需的高度。
  18. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照築壩所用材料,可以把壩稱為混凝土壩、填土壩、堆石壩,水力沖填壩等等。
  19. Test and research on asphalt concrete core of rock fill dam

    瀝青混凝土防滲墻施工技術
  20. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
分享友人