filled soil 中文意思是什麼

filled soil 解釋
填實土壤
  • filled : adj. 滿的,填滿的;充氣的;加載的。
  • soil : n 1 泥土,土壤;土質。2 土地,國土。3 滋生地,溫床。4 農業生活,務農。n 1 臟東西,污物,污穢,污...
  1. The intense eluviation and weathering of soil with groundwater and run - off result in the enhancing of capacity of transference of some elements, such as si, al, fe, mn. the chemical reactions of the colloid particles in the soil water make those crannies or holes filled by some epigenetic clay minerals and quartz. then a great deal of white reticulate clay comes into being in the quaternary laterite of the dongting basin

    地下水和地表水強烈的淋溶作用使土壤中硅鋁鐵錳等元素的遷移能力增強,土壤膠體粒子之間的化學反應,使得這些孔隙空間在後期逐漸被次生黏土礦物和石英所充填,最終,在洞庭盆地第四系紅土地層中形成大量的蠕蟲狀和根狀白色網紋。
  2. Combining with the research task researching on the deformation and stability of deep excavated cuts and high filled embankment of the traffic department in fujian province, based on the residual soil slope project on the project site at k15 + 183 of yong - zhang highway ( yong ' an section ), adopting non - linear theory, modern monitoring technology and numerical simulation technology, the deformation and stability of cutting cliff debris and residual soil slopes have been studied systemically and synthetically in the thesis. at the same time theory analysis, the analysis and estimate of field monitoring are taken into account in this course. main research work and working achievement are summed up as follows : ( 1 ) with the acquaintance of the trends and development about the deformation and stability of slopes at home and abroad, slopes are classified and summarized systemically

    並通過k15 + 183工點路塹土質邊坡的各類位移變形的監測成果驗證了該程序的正確性及適用性; ( 5 )通過應用大型有限元軟體ansys模擬分析,不僅分析了其隨著開挖時間步的應力應變關系,並模擬了與實際測斜管相匹配的測斜路徑,通過對各開挖時間步的模擬計算分析,得到了與實測數據較符合的結果; ( 6 )綜合監測分析成果和極限平衡理論計算分析成果,對k15 + 183工點路塹邊坡的原設計坡率和幾何形態進行了優化計算分析,取得了較為滿意的結果。
  3. Construction technology of filled soil highway embankment in expansive soil region on soft soil ground

    公路軟基膨脹土地段填土路堤施工技術
  4. It is concluded that the filled soil is silt soil with high liquid limit and plastic limit, which has the low swelling property in natural state

    結果認為,此路基填土為高液限和塑限的淤泥質軟土,天然狀態下具有弱膨脹性。
  5. It was indicated that the density of the filled soil and the drainage condition of the slope were the major factors controlling the deformation and failure of slope caused by the rise of ground water level

    分析結果表明:填土密度和斜坡排水條件是影響斜坡因地下水位上升而變形和破壞的重要因素。
  6. Lime - soil compaction pile foundation belongs to composite one and can obtain obvious technology and economic benefits when it is used to collapsible loess or filled soil, when is widely used in the north - west and north china

    灰土擠密樁屬于復合地基,用於處理厚度較大的濕陷性黃土或填土地基時,可獲得顯著的技術經濟效益,在我國西北和華北地區已廣泛採用。
  7. According to the results of the compaction test and hearing ration test, it is discovered that the filled soil also has the swelling property after being compressed, which may result in the crack of the subgrade with the change of the water contents

    通過對路基填土的擊實試驗和承載比試驗表明,填土壓實之後具有一定的膨脹性,在含水量變化差異性影響下的脹縮變形可能導致路基開裂。
  8. As for actual embankments, the hydraulic head, cross section shapes, properties of filled soil, geological conditions and so on all vary greatly, it ' s hard to define precisely the distribution of seepage field and take effective seepage prevention measures

    因實際工程中堤防的作用水頭、堤身斷面、填土性質、地質條件等均千變萬化,導致難以全面而準確地分析其滲流場分佈並採取有效的防滲措施。
  9. Too much embankment of filled soil will result the destroy of road surface or instability of high - stack soil ; soil pressure at the top of culvert is the key parameter of culvert structure design, more or less of the parameter will result in economic waste or failure of structure

    堤頂沉降過大,輕者破壞路面,重者路堤失穩,涵洞頂部土壓力是涵洞結構設計的控制指標,計算過大導致經濟浪費,過小導致涵洞開裂,影響其使用壽命。
  10. In view of soil mechanics, the uplift mechanism is more complicated than any other soil engineering problems. factors such as uplift behavior of soil, crack development, filled soil quality and progressive failure are shown having greatly influenced on pullout behavior

    從土力學觀點來看,基礎上拔機理遠比其它土工問題復雜,土的抗拉性能、土體中裂縫開展過程、填土質量以及土的漸進性破壞等因素,嚴重影響著基礎上拔的性能。
  11. The deformable framework is made up of soil particles, the pore space is filled with flowable liquid and gas

    土體顆粒組成的孔隙結構構成可變形骨架,以變形為其運動學特徵;流體充滿互相連通的孔隙,以流動為特徵。
  12. Foundation stabilization of hydraulic filled sand and sublayer soft soil by dynamic compaction method

    強夯法加固水力吹填砂及其下軟弱地基
  13. The tide of expressway construction is now moving from the developed areas to the western undeveloped areas. in consideration of the completed expressways and future orientations, stability of suggrade will be a major issue in a period of time, particularly the stability of subgrade filled with soil and stone, in the practice of engineering, there exist unclear attitude towards the soil - stone mixtures

    隨著我國交通基礎設施建設規模的不斷擴大,我國高速公路截至2002年末通車里程將達到20000公里,公路建設正由發達地區向西部欠發達地區發展,從已完成的高速公路以及今後的發展方向看,路基的穩定將是今後一個時期解決的主要問題,尤其是土石混填路基的穩定性問題。
  14. Variation of the soil suction of unsaturated soil slope under alternative action of infiltration and evaporation is studied taking a filled road slope and an excavated one as examples

    將公路填方和挖方路基邊坡作為典型算例,研究了入滲、蒸發交替作用下非飽和土邊坡內吸力的變化。
  15. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下水對豎向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。
  16. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  17. Initiates prepared brooms, dustpans, sickles, hammers and other tools needed to clean up the environment and changed into their work outfits before setting off for their destination. we cleaned the road, removed wild grass, shoveled soil, dredged ditches, filled holes and removed trash

    同修們事先已準備好了掃帚畚箕鐮刀鋤頭等各項整理環境的工具,在更換好工作服后,大家便乘坐交通工具到達目的地,展開道路清掃除草鏟土整地疏通水溝填土清除垃圾等工作。
  18. And it should be ascribed to silt according to the view of its mineral composition, particles distribution, physical and mechanical indices. not only is the content of cla > relatively high, but also the exchange capacity of ion, chiefly high - electronvalent calcareous ion, is great. due to aggregations filled with pore among inter - particles, the soil has the engineering properties of silty clay

    從其礦物成分、顆分試驗及物理力學指標來看,它應歸屬于粉土,但由於土中的粘粒含量較高,且粒間充填集聚體,土的離子交換容量較大,交換陽離子以高價鈣離子為主,故其仍表現出粉質粘土的工程特性。
  19. ( 2 ) respectively by elastic theory analyses and methods of structural mechanics, transverse static analytical equations for flexible pipeline rigid pipeline are established whose outcomes are applied in numerical example to compare those with that by finite element method. ( 3 ) considering interaction of filled soil, pipeline and foundation, with an eye to non - linear soil model, in view of the initial geo - stress field and the effects of interface between soil and pipeline, and by finite element method the calculational model and method are built for transverse stress in pipeline. then, by the great finite element analytical software ansys, those outcomes are applied in calculation example of positive buried pipe to educe the distribution of circumjacent soil pressure and stresses on cross section and to compare it with that calculated by conventional ways before those outcomes are applied in engineering case of positive buried pipe with flexible filled materials to confirm distribution of soil pressures after the measure for reduction and to compare it with measurements. as a result, the model set up in this paper is proved to be applicable after all above - mentioned analyses

    本文基於彈性理論和有限元原理與方法,分析了上埋式地下管道橫向力學計算方法和性狀並探討了上埋式地下管道的減荷等問題: ( 1 )在分析現有幾種典型的管道垂直土壓力計算方法的基礎上,探討了影響垂直土壓力的主要因素以及改進的方法; ( 2 )分別通過彈性理論分析法和結構力學的方法,建立了地下管道柔性圓環和剛性管涵的橫向靜力計算方程,並應用在算例中,把所得結果和有限元方法所得結果進行對比分析; ( 3 )考慮填土、管道和基礎的共同作用、土體的非線性特性、初始應力場以及土體和管道的接觸面因素的影響,利用有限元的思路,建立了地下管道橫向力學有限元計算模型和方法,並且採用大型有限元分析軟體ansys ,針對上埋式管道工程算例,得出了管周土壓力以及管道橫截面應力的分佈狀況和規律,並和理論值進行對比;針對施加柔性填料的上埋式管道工程實例,得出了減荷后的土壓力分佈,並和實測值進行了對比。
  20. While there, his friends gave him a silver goblet filled with polish soil

    臨行前,華沙音樂學院的師生們為他送行,並贈以盛滿祖國泥土的銀杯。
分享友人