first terminal 中文意思是什麼

first terminal 解釋
開頭終結符
  • first : adj 1 最初的,最早的。2 最上等的,第一流的。3 基本的,概要的。4 高音(調)的。n 1 最初,第一;第...
  • terminal : adj 1 終端的,終點的,結尾的;極限的。2 定期的,每期[季]的;每學期的,學期終[末]的。3 期終的;末...
  1. First, a terminal double bond was introduced into 3 - amino - 9 - ethylcarbazole ( aec ) via methacryloyl chloride to obtain the compound, 3 - ( n - methacryloyl ) amino - 9 - ethylcarbazole ( mec ). second, mec was copolymerized with butyl methacrylate to prepare the mec - immobilized polymer particles. the resultant polymer particles were used as a fluorescence probe, which was almost free of dye leaching, and had higher photostability in comparison with free aec

    首先利用甲基丙烯酰氯向3 -氨基- 9 -乙基咔唑( aec )分子中引入末端雙鍵,得到帶末端雙鍵的熒光指示劑3 - ( n -甲基丙烯酰基)氨基- 9 -乙基咔唑( mec ) ,然後通過乳液聚合技術將mec共價固定到聚甲基丙烯酸丁酯基體上,制得一種共價固定了mec的聚合物顆粒。
  2. Aimed at the trends of ftu in our country and overseas, the thesis first give the summary of characteristics towards current feed terminal unit used in electric automation, then detailed introduce the adoption of microchip msp430f149 for the cpu design

    論文結合國內外ftu的現狀和發展趨勢,對ftu的主要功能進行了分析研究,設計了以ti公司msp430f149單片機為ftu核心的控制器系統硬體電路,並對硬體電路的設計原理、電路組成及元器件選擇進行了詳細分析。
  3. Firstly, the connected end sets of the relay lines are got using the breadth first search algorithm and the connected relationship of wiring terms is got in the electrical circuit diagram according to different cad block structure of different element type. secondly, the appropriate specification of the relay element is chosen by using the equinoctial graph algorithm, and the panel layout diagram is generated automatically by the combining automatic layout and manual intervention. finally, the optimized path algorithm which passes each vertex in the completed non - directional graph once and only once is put forward, this algorithm and the prim minimum spanning tree algrotithm can generate the inner panel wiring diagram and terminal wiring diagram automatically

    首先,採用廣度優先搜索演算法查找電氣原理圖中的連通導線端點集,並根據不同類型的繼電元件對應的cad圖塊結構的不同,得到電氣原理圖中元件接線端子之間的連接關系;其次,根據二分圖匹配演算法為電氣原理圖中繼電元件選擇合適的型號和規格,並採用人工干預和自動布置相結合的方法完成屏面布置圖的自動生成;最後,提出了完全無向圖中經過每個頂點一次且僅一次的優化路徑演算法,利用該演算法和經過預處理的prim最小生成樹演算法自動生成屏內安裝接線圖和端子接線圖。
  4. First step of the experiment, the research of terminal point pr ' s value, stannic salt solution consistency and reacts solvent that the influence factor of gel to prepare has been carried on

    第一步的實驗,對制備凝膠的影響因素進行了錫鹽溶液濃度、反應終點ph值、反應溶劑的研究。
  5. In most plants, the terminal growth is affected first.

    大多數植物,先是頂端生長受阻。
  6. There are three input variables in the analysis. the first two are the rental levels and the terminal market value of the office, and the same assumptions as in the irr analysis are used

    這項分析有三項可變因素,其中第一二項是租金水平及該辦事處的最終市值,我們採用了與計算內部回報率相同的假設。
  7. First floor, arrival terminal

    入境大堂1樓。
  8. Morning departure by ferry terminal to vancouver island - victoria. first stop at the world famous butchart garden and chinatown

    早上專車前往碼頭乘搭卑詩省渡海輪,前往溫哥華島。
  9. The extracellular 100pl ( ecl1 ) and ecl2 was linked by disulfide bond to maintenanced the stability of the protein secondary structure. in recent years, we showed that ccr5 as a co - receptor could interact with hiv - 1 infect ion. ccr5 was paid closed attention to since it was cloned in 1996. the aim is to - obtain the sequence of first extracillular domain of 3 chemokine receptor 5 ( ccr5 ) n - terminal gene fragment with high level expression in e. coli and to prepare its specific antibody f ( ab ' ) ;, and its detected method

    Ccr5具有g蛋白偶聯受體家族( g - proteincoupledreceptors , gpcrs )所特有的7個跨膜區( transmembrinedomains , tm ) ,呈螺旋, tm的氨基酸有很高的保守性,膜外第一襻( extracellularloop1 , ecl1 )和ecl2之間有二硫鍵相連,以維持蛋白質二級結構的穩定性。
  10. The tuen mun cross - boundary ferry terminal is the only private funded and operated service in the sar, and the first cross - border ferry operation in northwestern new territories

    屯門跨境渡輪碼頭為香港特別行政區唯一私人投資及經營的跨境碼頭,亦是新界區首個跨境碼頭。
  11. First, the structure of sdr and the physical - channel of td - scdma are expounded, then software and hardware models of the terminal receiver, which use the sdr structure of wideband and bandpass sampling in if ( intermediate frequency ), are put forward

    首先對軟體無線電的組成結構和td - scdma物理通道進行了闡述,在此基礎上提出了基於寬帶中頻帶通采樣軟體無線電結構的td - scdma終端接收機的軟硬體模塊設計方案。
  12. An unusual rice calmodulin isoform, oscam61, was first obtained in our lab, which contains an n - terminal cam domain and a c - terminal basic extension with a potential prenylation site. in vitro activity assays confirm oscam61 as a functional calmodulin. using the green fluorescent protein ( gfp ) as a visual marker, we further studied subcellular localization of oscam61 in stably transformed tobacco cells

    利用綠色熒光蛋白( greenfluorescentprotein , gfp )作為標記,研究了oscam61在煙草細胞中的定位, gfp - oscam61融合蛋白(具有開放的異戊烯化修飾位點)定位於細胞質膜和細胞器膜上,而oscam61 - gfp (異戊烯化修飾位點被gfp封閉)定位於細胞核的核質中。
  13. The mo - dified first - come - first - served algorithm, time - adva nc e algorithm and constrained position - shift algorithm are put forward to automat ically plan the most efficient landing order, to assign optimal spaced landing times to all arrivals without violate the spacing requirements for different typ es of aircraft and to enhance the usage of the runway under heavy traffic condit ion in the terminal area

    為了能夠在終端區交通繁忙的情況下高效地為到達的飛機流安排合理的著陸次序,並在不違反飛機間距要求的情況下給出各飛機經過優化的著陸時間,提高機場跑道的利用率,提出了經過改進的先來先服務、帶有時間提前量、帶有約束的位置偏移三種排序演算法。
  14. The level adjustment circuit 100 lowers the clock signal input to the first clock terminal ck1 by a predetermined value from h level and provides the signal to the gate of the transistor q5

    電平調節電路100將送往第一個時鐘終端ck1的時鐘信號從h電平降低一個預定值,並將此信號送往晶體管q5的輸入端。
  15. Xiaohu terminal has become the first strategic oil depot in guangdong province while xingang undertakes the discharge operation for guangzhou baiyun international airport

    新港油碼頭承擔廣州白雲國際機場航空油接卸任務,輸油管直通機場。
  16. First berth at terminal no. 9 operational in 2003

    九號貨櫃碼頭首個泊位明年運作
  17. The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too

    第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。
  18. The first phase of the area covers 3. 06 square km and includes warehouses, cold storage, a container terminal and processing and logistics services

    第一期工程佔地面積3 . 06平方千米,包括了倉庫,冷藏庫、集裝箱碼頭區、加工和物流服務區。
  19. At the second turnover, we lost our two ladles, and we had a rest, and bought a cup of ginger soup against cold, baked corns and potatos for strength. gaining the strength from the food, we got the terminal successfully, and found out from our guide that we were the first boat to finish the drifting in our group

    第二次翻船后,兩個舀子也掉了。我們休息了一下,買了杯姜湯防感冒,吃了烤土豆和玉米以增體能。吃過后,我們順利地到達了終點。結果,導游說我們是本團中最先上岸的。
  20. Luchaogang railway container terminal, the first terminal which bring into china railway container transport co., ltd and transportation command of shanghai railway bureau, is going to operated formally in 1st dec of 2005, also is the first completed and operated railway container terminal in the national railway medium and long - term 18 container terminals development plan which the ministry of railways formulates

    蘆潮港中心站於2005年12月1日正式對外營運,是納入中鐵集裝箱運輸有限責任公司和上海鐵路局運輸指揮的全國第一個集裝箱中心站,也是鐵道部制定的鐵路中長期發展規劃建設十八個集裝箱中心站中第一個建成投入運行的鐵路集裝箱中心站。
分享友人