floating bridge 中文意思是什麼

floating bridge 解釋
浮橋;纜索渡船。

  • floating : adj. 1. 漂浮的,浮動的,流動性的。2. 【醫學】游離的。3. 移動的;不定的。4. (塗工的)第二道(漆等)。5. (船貨)未到埠的,在海上的,在運輸中的。
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Applied of erecting by floating in pun down cast - in - place cantilever bridge

    浮船渡運法在拆除懸澆結構橋中的應用
  2. Wende bridge has a long history which could traced back to the six dynasties. it was a floating bridge at that time

    文德橋伴隨著歷史的變遷,經歷了多少風風雨雨,它的奇景聞名於世世代代。
  3. Construction of a floating bridge will allow more traffic between inner mongolia and ningxia ' s steel and power plants

    內蒙和寧夏交界處正在修建一座浮橋,這樣寧夏的鋼鐵廠和內蒙的電廠之間就可以有更多的物資運輸。
  4. In 1471, han yong, governor of guangdong & guangxi, cast iron pillars for the building of a floating bridge over the guijiang river

    明成化七年( 1471年) ,兩廣總督韓雍和太監陳平等籌建浮橋用生鐵鑄造浮橋鐵柱,豎在桂江口兩邊岸上。
  5. Abstract : the corrosion and corrosion resistance design of long - term used floating bridge discussed in this paper, according to the design and practical operation of daxie floating bridge over sea and on the basis of corrosion data collection and the study of four years

    文摘:根據大榭跨海浮橋設計與使用的工程實踐,在多年數據採集和跟蹤研究的基礎上,對中長期浮橋的腐蝕與防腐設計進行探討。
  6. It is difficult to test the moving - load - induced dynamic vertical displacement of a floating bridge, because the vertical displacement of a floating bridge consists of the contributions from the structural deformation, the variations of the gaps between the pontoons and the variation of the draught, and it is much larger than that of an immovable bridge

    摘要通載浮橋的動態位移,由於其位移幅度相對于固定橋要大得多,而且其垂向位移是由結構變形、間隙變化以及吃水變化等多種因素引起,一般難以對其進行動態位移測試。
  7. In addition, other exemplifications, such as huayan temple in datong, double towers in taiyuan and the " iron bull " floating bridge in pujindu of the yellow river, reflect the ideas of combination of confucianism and buddhism, confucianism and literature and " the harmony and unity of heaven and human " respectively

    而山西省的一些其他建築藝術例證,如大同華嚴寺、太原雙塔與蒲津渡黃河鐵牛浮橋,則分別體現了儒佛會通、儒風文運與天人合一的古建築文化理念。
  8. The 40t floating crane played a very important role in the construction of the whole bridge and solved many difficult problems

    在全橋的施工過程中, 40t浮吊起到了非常大的作用,解決了許多施工難題。
  9. The confederation bridge actually consists of 65 separate sections which were each built on land and then moved into precise positions by a satellite - guided floating crane

    同盟橋實際上是建立在土地上,然後以衛星指導流動起重機搬進準確位置的65單獨部分組成。
  10. Analysis of floating and hauling construction of 150 - m span half - through basket handle steel arch bridge

    跨徑中承式提籃鋼拱橋浮拖施工分析
  11. A floating structure, such as a flat - bottomed boat, that is used to support a bridge

    浮舟用於支撐浮橋的船隻,可以輕易移動的建造物,如平底船
  12. Based on the construction of large diameter pile foundations at deep water riverbed without overburden for the shengmi bridge in nanchang, the construction difficulties and construction control key points involved in the method for bored pile construction with floating gantry are described

    摘要通過對南昌生米大橋深水無覆蓋層大孔徑樁基施工實踐,介紹浮式龍門鉆孔樁施工方法中的施工難點和控制重點。
  13. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  14. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  15. Sometimes, like a log floating down the river, there moved over the bridge, hemmed in on all sides, a baggage - waggon, piled up high and covered with leather covers

    有時候,儼如河上飄浮的圓木,一輛連隊的大車或是軍官的大車,滿載著物件,覆蓋著皮革,在四周的眾人護衛下從橋上駛行。
  16. Asia - bridge software enterprise has to study and solve the problem at present. the essay focuses on the asia - bridge software staff floating and analyzing relevant reasons by questionnaire and interviewing face to face. the main reasons for brain drain in asia - bridge enterprise are unreasonable salary and wages system ; lack of fairness ; improper welfare system ; no chance for staff training and no efficient evaluation program etc. the article has demonstrated some new ideas and thoughts to solve those problems based on the analysis and accepted some advanced and typical experiences in home and aboard, such as individual salary and wages system ; self - service welfare plan and completed training system and form asia - bridge enterprise culture in order to solve the erosion of the qualified people in asia - bridge software enterprise

    本文首先對人員流動及其相關理論進行了研究;採取定性和定量分析相結合的方式,對亞橋軟體人員流失的現狀進行了充分分析;基於對亞橋軟體人員配置現狀與人員特徵的充分把握,以比較研究、調查問卷及面談法為主要手段,找出了造成亞橋軟體人員流失的主要原因,重點包括:薪資制度結構不合理、激勵性不強,福利制度適應性差、福利項目對于員工需求的針對性不強,員工培訓缺乏充分的培訓需求分析做基礎、培訓方式方法過分單一,不能科學合理的確定所需求人員的數量及關鍵素質,企業文化有待完善等等;本文以前述理論為指導,充分借鑒了國內外先進典型企業相關經驗,結合亞橋軟體自身問題與特點,制訂了諸如建立個性化薪資制度、推行自助餐式福利計劃、完善培訓體系及改進人員需求確定、培育適合的企業文化等對策,以解決亞橋軟體人員流失問題;本文還就解決亞橋軟體人員流失問題的配套措施進行了探索。
  17. Looking south from the longevity hill, one feels as if the seventeen - arch bridge and the nanhu island were floating on the kunming lake

    南湖島自萬壽山上南望,十七孔橋和南湖島猶如浮於昆明湖上。
分享友人