flood protection 中文意思是什麼

flood protection 解釋
防洪;防汛
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • protection : n 1 保護,保衛,防禦,掩護,包庇,照顧 (from; against)。2 保護者,防護物 (against); 〈美俚〉...
  1. To avoid the retardation of flood water, improve the discharging conditions and reduce flooding frequency and flowage damage on flood retarding basins, huai river commission made a decision to adjust and regulate the middle courses of huai river. the authorial thesis is based on the main part of huai river flood - protection planning, i. e., the flood - protection planning of huai rivers middle courses. author of thesis participated in the drawing up and the administrating of the plan

    為了擺脫中、小洪水行洪不暢,減少行、蓄洪區在中、小洪水條件下的行洪機遇,淮河水利委員會在淮河流域總體防洪規劃中,決定重點解決淮干中遊河道防洪問題,論文作者親自參與制定了淮河中、上遊河道防洪規劃制定工作,並組織、領導規劃中各項骨幹工程的施工建設,前後數年之久。
  2. Ced requested csce to provide adequate evidence on the legality of the source of materials. csce produced a letter showing that the materials came from the flood protection works contractor

    土木工程署要求中國建築證明該批石料來源的合法性,該公司遂出示一封信件顯示有關物料來自進行東涌河治理工程的承建商。
  3. In september 2003, ced s contractor, china state construction engineering ( hk ) ltd ( csce ), approached rural committee s flood protection works contractor to inspect the materials of the stockpile to see if the materials were acceptable for use in ced s project

    今年九月,本署承建商中國建築工程(香港)有限公司(中國建築)與該名受聘于東涌鄉事委員會的承建商接觸,以檢視該批石料是否適合土木工程署工程之用。
  4. The concrete abatise groups frame as an advanced technique is used in flood protection, river regulation and bank protection works

    混凝土榪槎群框架結構是防洪、治河、護岸工程中出現的一項新技術,針對其水流特性的基礎性研究還很不足。
  5. Flood protection products - specification - temporary and demountable products

    防洪用品.規范.臨時和可卸式產品
  6. Flood protection products - specification - building apertures

    防洪用品.規范.建築物排水孔
  7. On 18 september 2003, ced s consultant inspected jointly with the contractor the pebbles stockpiled near hau wong temple at tung chung and was advised that the materials belonged to a construction company carrying out " flood protection " works for the stream

    土木工程署的工程顧問,在二三年九月十八日聯同承建商檢視堆存於東涌侯王宮附近的卵石時,獲告知該等物料屬一間在東涌河整治河道的建築公司所有。
  8. Decision consultation of large water project, flood and flood protection problems, water resources and water environment

    大型水工程決策,如跨流域調水,水利規劃等;洪水與防洪問題,水咨詢開發與利用等,水環境問題等
  9. ( 1 ) the principles and approaches are explored on the post - evaluation of water resources planning and projects. ( 2 ) the post - evaluation model of the adjusting and regulating planning of huai river middle courses for flood protection. based on the model, the economical evaluation and comprehensive evaluation are completed in the chapter 5

    一是探討水利規劃、水利工程項目后評價的原理、方法;二是建立淮干河道整治規劃后評價的模型,在此基礎上,對淮干中遊河道整治規劃及工程項目進行了經濟評價、綜合評價。
  10. ( 2 ) in the chapter two, several general plannings of huai river catchment are discussed and successful and failing experiences are also summarized on the flood protection of huai river. ( 3 ) in the chapter three, the executive practice is analysed on the adjusting and regulating planning of huai river middle courses for flood protection

    第二較為詳細地總結了新中國成立以來,淮河流域幾次規劃的成功經驗與存在的問題,分析了五十年代治淮方略及其骨幹工程為淮河防洪奠定的良好基礎;同時指出六十年代、七十年代治淮工作指導思想中存在的問題。
  11. Water engineering of agricultural lands ; terms ; flood protection, coastal protection, pumping stations

    農業地帶水利工程.術語.第2部分:洪水防護海岸防護
  12. Flood protection products - specification - building skirt systems

    防洪產品.規范.建築物踢腳板系統
  13. The town is now counting the cost of its failure to provide adequate flood protection.

    該鎮未採取適當的防洪措施,現在吃到了苦頭。
  14. North west new territories village flood protection study

    新界西北部鄉村防洪措施研究
  15. The town is now counting the cost of its failure to provide adequate flood protection

    該鎮未採取適當的防洪措施,現在吃到了苦頭
  16. With the stage i and stage ii works completed, the river section downstream of lo wu has been improved to the required flood protection standard of " one in 50 years "

    深圳河治理工程計劃的第i及ii期已完成,羅湖下游一段的河道已獲得改善,達到能抵禦五十年一遇暴雨的防洪標準。
  17. However, since the contractor has produced a letter from the tung chung rural committee ( tcrc ), claiming that the materials came from the flood protection project for the stream now underway, the consultant considers that before establishing the " non - legality " of the source, there are difficulties in invoking the terms and conditions of the contract to stop the contractor from transporting such materials to the construction site at its own risk and bearing all consequences and liabilities

    但由於承建商曾出示一份東涌鄉事委員會發出的信件,聲稱石料乃來自進行中的東涌河治河工程,工程顧問表示在未能確定該等石源是非法前,若根據工程合約條款禁止有關承建商在自負所有可能後果及責任的情?下運載石料進入工地,實存在困難。
  18. The paper selected changtan reservoir in guangdong province as case study site, investigated the impacts of 4 upstream reservoirs on changtan reservoir ' s design inflow floods and explored changtan reservoir ' s flood - protection standards, regulating rules and potential for integrated water resources utilization after newly - constructed upstream reservoirs being taken into account

    論文以廣東省長潭水庫為研究對象,闡述了受人類活動影響的水庫設計洪水調度研究方法,研究了水庫在其上游修建了若干個中小水庫以後,其設計洪水調度所受的影響程度,分析比較了研究結果,探討了水庫在考慮上游多個水庫影響下的防洪標準、調度原則及水資源綜合利用特點。
  19. Village flood protection scheme

    鄉村防洪計劃
  20. In view of this, will the government inform this council of the reasons for the delay of the commencement of construction work on the flood protection schemes in the remaining nine villages

    有見及此,政府可否告知本局,餘下九個鄉村的防洪計劃工程延遲動工的原因為何?
分享友人