  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. Leakage in a dam foundation may sometimes be overcome by digging deep into it so as to build a cutoff wall into the foundation.

    壩基漏水的現象,有時可以用深挖地基建造堵截水墻的辦法來克服。
  3. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  4. During bank slope excavation in cofferdam in a harbor construction, the work had to be suspended due to water leakage ( river water and ground water ) into the foundation pit

    摘要某碼頭工程在採用圍堰進行岸坡開挖過程中,受江水和地下水位的影響,基坑內有水滲入導致工程無法進行。
  5. A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension.

    貫穿填土壩、水力沖填壩或壩基的一個細小的漏水孔隙以懸浮的方式帶走一些細小的土粒。
  6. This paper introduces foundation pit slope shoring method of soft foundation, control steps of settlement of surrounding structures, leakage - preventing technology of the adjacent lake and handle means of remain backwater

    摘要本文根據工程實例介紹了軟弱地層的基坑邊坡支護方法、防止周邊建築物沉降變形的控制措施、鄰湖防滲技術及殘留滯水的處理方法。
  7. Discussion about grouting to solve leakage problem of waterproof floor of deep foundation ditch

    灌漿處理深基坑隔水底板漏水的探討
  8. Leakage grout at percussion and grabing piles foundation in a lime vertical kiln and its filling grouting treatment

    某石灰立窯沖抓樁基礎漏漿及充填灌漿處理
  9. The information of the carbon and oxygen isotopes in the ground - water ' s in carbonate plays an indicated role in the seperation the ground water system. and in the end of the paper, some prelimilary suggestion have been naturally put forward for the stop of the leakage in the dam foundation

    中稀土sm tb的比值反應了水巖相互作用過程中巖溶作用以及黃鐵礦氧化作用的強弱。地下水中碳酸鹽碳氧同位素的信息對地下水系的劃分起到指示作用。最後,對壩基的防滲提出初步的建議。