girder space 中文意思是什麼

girder space 解釋
縱梁間距
  • girder : n. 【建築】縱梁,大樑,撐柱,撐桿,大型工字梁。 a framed girder構桁。adj. -less
  • space : n 1 空間;太空。2 空隙,空地;場地;(火車輪船飛機中的)座位;餘地;篇幅。3 空白;間隔;距離。4 ...
  1. The shell is divided into orthogonal or oblique crossing girder systems, which make up a space rigid frame structure, then an analysis is made of the endogen force of the shell structure based on the curved lever space rigid frame structure

    該方法通過將殼體結構離散成相互垂直或斜交的曲桿梁系組成的空間剛架結構,進而分析曲桿空間剛架結構的內力,達到殼體內力分析的目的。
  2. Astronautors aboard the spcae shuttle discovery can cross another item off their " to - do " list : a second spacewalk. two astronauts spent 6 and a half hours unhooking a girder from the international space station. that started the delicate process of moving a gaint solar power tower to another part of the orbiting outpost

    發現者好航天飛機上的宇航員進行了第二次太空行走,離完成任務又近了一步.兩名宇航員花了六個半小時的時間從國際空間站上卸下一個橫梁.他們要這個太空前哨上的一個巨大太陽能塔移到另一邊,今天只是這個精細復雜的工作的開始
  3. This paper takes the steel constructions workshop building of bao ji bridge girder plant as background, inquiring into using isothermal level jet airflow to cut off workshop in the middle to organize airflow in it, attempting to resolve the problem of ventilation and dust removal in large space which has changeable dust source

    本文以寶雞橋梁廠鋼結構車間的噴丸打磨廠房為工程背景,探討運用等溫水平射流進行空間隔斷,合理組織室內氣流,嘗試解決具有高大空間、變動塵源特點的高大廠房通風除塵問題。
  4. The plexiglass model test is carried out by two selective shape, the stress of each test operating loads was obtained in order to validate the correctness of the finite element modeling. in this paper, a regularity of shear lag effect of main sections in two kinds of box girder is given. as the foresight project of double - level - driveway continuous box girder, this research fully utilizes the space of box girder structure and flexural and torsional properties of high - depth box girder, which have innovative significance and applied foregroundin engineering

    對所選擇的結構形式進行縮尺有機玻璃模型試驗,得到實腹連續箱梁和空腹箱梁在各種試驗工況荷載下的應力,通過換算分析,驗證了本文所建立的有限元模型的準確性,由此得到兩種箱梁各主要斷面剪力滯效應的變化規律。
  5. In this thesis, the construction and monitoring general method of cable replacement work for qianwei minjiang river cable - stayed bridge is introduced firstly, then, using large - scale commercial finite elements analysis software, algor, a space solid model is developed. in order to give attention to internal force and deformation, the thesis simulates the factual situation of the bridge by adding boundary elements. the analyzed items include : cable forces, deflections, stress of box - girder and maximum horizontal deformation of tower under different cable - replacement cases, which can be used to tutor design and construction for other similar works

    本文以犍為岷江大橋換索工程為背景,首先介紹了該橋換索施工與監控工作的大致情況,並應用大型商業有限元軟體algor建立了該橋空間計算模型,建模過程中為了真實地模擬結構換索前的內力狀態,實現內力與線形兼顧,本文使用了「添加邊界元還原結構內力」的方法。
  6. As a result of the complicated analysis of the curved thin - walled box girder, there has little feasible methods to designs the diaphragm ’ s space between

    由於曲梁的受力復雜,分析繁瑣,並沒有實際可行的計算方法確定橫隔板的設置間距,在規范中對箱梁沒有明確條文規定。
  7. Two astronauts spent six and a half hours unhooking a girder from the international space station

    兩名宇航員共花六個半小時將一根大樑從國際太空站上取下。
  8. Standard headroom monorail hoist. it is applicable on single - girder crane which has a monorail, the space between two wheels of the trollwy is adjustable

    標準凈空高度單梁電動葫蘆,用於單軌道系統的單梁起重機,行走機構的走輪寬度可調節。
  9. Because the intervals of two side girders are relatively large in the structure of the floor, it is not even and some and out of shape that its bridge of panels must be produced at the same time horizontally and crookedly and vertically except deforming wholly, level analyse can receive the satisfied result already at this moment, is it is it accord with floor structure real work state, girder of cable - stay bridge just to analyse with whole out of shape relevant non - linear space of function while being out of shape while being above - mentioned to consider only, but about this research rarely seen to report bridge worker is it understand their receive strength characteristic in an all - round way to need badly publicly

    由於肋板結構中兩個邊主梁的間距較大,其橋面板除整體受力變形外必然同時產生橫向彎曲和縱向不均勻局部變形,此時平面分析已不能得到滿意的結果,只有考慮上述變形與整體變形相關作用的非線性空間分析才符合肋板結構主梁斜拉橋的實際工作狀況,但有關這方面的研究鮮見公開報道,橋梁工作者急需全面了解其受力特性。
  10. Second, change the diaphragm ’ s space between, retain the other thing, analyze the influence of the stress and deformation of box ? girder cross section and the beam web. based on the analysis upwards, the writer studied the rule of the influence of the stress and deformation box ? girder cross section and the beam web with different diaphragm ’ s space between. according to the results of finite element analysis, the writer puts forward some suggestions which will provide some reference for the following design

    本文利用ansys有限元分析程序,對指定斷面,不同曲率的曲箱梁,建立完備的有限元模型,分別對二個方面的問題進行了分析:其一,通過對箱梁在有無跨中橫隔板時截面頂板及腹板的變形和應力分佈的對比分析,闡述了設置跨中橫隔板的重要性;其二,在相同工況下,通過改變橫隔板的設置間距,分析對箱梁翼緣及腹板的受力影響。
  11. In this paper, the reinforcement method with steel plate adhering to a real queen - post girder in bridge was analyzed by using the space entity simulation model, and the effect was validated by load test on site

    摘要針對某座橋梁下部結構蓋梁採用粘鋼法進行加固,對其加固效果採用有限元模型進行模擬分析計算,並通過現場荷載試驗進行驗證。
  12. In recent years, during the detection of the established reinforced concrete or the prestressed concrete box girder bridges etc. the large structures, we can find that the concrete in particular structural positions such as the anchorage zones of prestressed reinforcement with dense reinforcement, the prestressed pipe in which the space of reinforcement or the thickness of concrete cover is small, the top and bottom flange of box girder and so on has brought great difficulty to concrete construction because of the small size and densely - packed reinforcement

    對于變截面t梁、工字梁、箱梁等常見結構,截面形式復雜,一些部位尺寸較小且密集配筋,如梁頂板,梁底板,預應力管道間,混凝土不可避免的造成不密實導致耐久性降低,而這些問題往往為設計者所忽略。對于新建橋梁混凝土的密實度問題,尤其是新建橋梁關鍵部位的混凝土密實度和耐久性問題,人們研究和關心的較少,這也為橋梁的質量監督控制和使用壽命埋下了隱患。
  13. In this thesis, the internal force and transfiguration of the double reticulated dome under different load combination are studied ; the linear and nonlinear analysis are separately performed ; compare the difference between space girder element and space truss element ; at last analyze the dynamical response under seismic action. the horizontal seismic response of double layer oblate lattice shell is analyzed by using step - by - step integration procedure. the effect of some parameters such as exterior load, different support conditions and damping ratio on the dynamic internal forces and dynamic properties is studied

    本文旨在研究雙層球狀網殼結構在各種載荷組合下的內力和變形,分別進行了線性和非線性靜力分析;進行了空間梁單元和空間桿單元兩種計算模型的比較;最後進行了在地震荷載作用下的動力反應分析,動力分析中用子空間迭代法得出了這類空間結構的動力特性,用時程法中的振型疊加法分析了結構在水平地震作用下的動態響應規律。
  14. Basing on the feature of the structure member, the structure is simplified to a 3 - d model consist of space beams and shells, so we can make response spectrum dynamic analysis on the finite - element models. at last nonlinear finite element dynamic analysis was made about the structures. the calculated results reveal the rule of dynamic response about model the and show that the aseismic behaviour and failure mechanism of shear wall structure with src supporting frames and src girder transfer floor is better than that of rc one

    在7度多遇和罕遇地震力作用下,通過對振型、側向位移、傾覆力矩和剪力在給定抗側力結構間分配的比較,以及對框支柱和剪力墻的地震響應、轉換層樓板應力比較等模擬分析,得到型鋼混凝土梁式轉換層框支剪力墻結構較鋼筋混凝土梁式轉換層框支剪力墻結構抗地震力特性上有較明顯的改善的結論。
  15. According to the characteristics of the structure and the loading of large rectangle aqueduct with longitudinal beams, we study the static structure calculation methods and compare the practical space method, the girder method and the solid 3 - d fem

    摘要根據大型多縱梁矩形渡槽槽身結構及其受力特點,研究了其結構靜力計算的方法,並對梁格法、三維實體單元有限元法和實用空間分析法進行了對比。
分享友人