high water discharge 中文意思是什麼

high water discharge 解釋
高水位量
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  1. A statistical model is developed and indicates high correlation between the accretion of modem yellow river delta and the water and sediment discharge of yellow river, and the model shows the necessary water and sediment discharge per year to ensure the equilibrium of alluvion and erosion of yellow river delta

    黃河三角洲凈造陸面積與黃河入海水沙量的統計模型說明,黃河三角洲沖淤動態平衡時的黃河入海徑流量為71 . 93億m ~ 3 a ,輸沙量為1 . 853億t a 。
  2. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃河三角洲沖淤演變時,從1976年黃河改道清水溝流路入海到2000年,整個黃洞三角洲凈造陸201 . 5km ~ 2 ,淤積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口河嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;清水溝河嘴大量淤積,淤積速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;清水溝河嘴南側到支脈溝一段岸線與刁口河嘴以西到灣灣溝一段岸線基本穩定。
  3. The water current flows over the top of the dentoid baffle to the hydraulic jump as additional momentum. while it is cooperated with a stilling basin, the flowing condition emerged in the basin may be improved greatly and the length and downstream water depth required by the basin can be decreased to a great extent. such an appliance may be also used to solve the problems of insufficiently dissipating water flow energy and aerating flow, which are often faced with those hydraulic engineering constraction as acted by high waterhead, great specific discharge and low froude number

    本文通過齒墩頂部的擴散水舌所形成的附加射流,從上部射入水躍,即可改善消力池內的水流流態,又可降低第二共軛水深,減小水躍長度,增進水躍消能效果,同時還能解決大單寬、低佛勞德數條件下摻氣和消能不足的問題,試驗證實它是一種安全、經濟的消能工。
  4. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河床以及杭州灣北岸深槽的影響
  5. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  6. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  7. It is found, through further study on the water temperature distribution in the high flow year, the low flow year and the cold year, that the influences of discharge and weather are limited on the water tem

    又就豐水年、枯水年和低氣溫年的水溫分佈作的進一步研究發現,水量和氣象條件對大型深水溫結構影響有限,其水溫結構具有較強的穩定性。
  8. Research on elastic slab vibration of inverted arch plunge pool under high water head and large discharge

    高水頭大流量作用下反拱水墊塘彈性單底板塊振動規律研究
  9. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  10. Reverse osmosis is in a salt water such as raw water than natural infiltration to exert greater pressure on the pressure and make the water from the high concentration side infiltrate low concentrations party to the original edema water pressure to the membrane elements on the other side into pure water and raw water minor impurities, colloid, organic matter, heavy metals, bacteria, viruses and other harmful substances and are all retained from the sewage discharge into export

    反滲透就是在有鹽份的水中如原水施加比自然滲透壓力更大的壓力,使水由濃度高的一方滲透到濃度低的一方,把原水腫的水分子壓到膜的另一邊變成純凈水,而原水中的細微雜質膠體有機物重金屬細菌病毒及其他有害物質都統統截留下來並經污水出口排放掉。由於反滲透膜的孔徑僅0 . 0001
  11. This series of pumps are especially suitable for water supply and discharge in high and low residence constructions, hospitals, hotels, department stores and office buildings, water for fire control, distant distance transportation, as well as water supply in production process

    該系列泵特別適用於高低層建築的住宅、醫院、旅館、百貨大樓、辦公大樓等的給排水及消防用水、遠距離輸送及生產工藝循環中用水等。
  12. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道工程的安全管理難度。
  13. 1 the company has excellent production condition and public facilities such as self - provide power plant supplying high voltage wire of 35 kv, two sets 16000 kva transformers in power station, one deep well with water discharge of tons per hour, water pool with water pcapacity of 150 tons, one water tower with 100tons, two boilers with four tons, three compressed air machines to make sure the requirement of production. the company located at no. 62haozhuang st. taiyuan city and is 0. 7 kilometer away from dongshan expressway and also 2. 5 kilometer away from the railway station. the company was also equipped with communication facilities for example international telephone and fax

    該公司具有良好的生產條件及公用設施:有自備電廠供給35kv高壓進線,變電站16000kva變壓器兩臺深井一眼,每小時出水50噸蓄水池150噸水塔1個,容量100噸4噸鍋爐兩臺,空壓機三臺,保證生產需求。公司位於太原市郝莊正街62號,距東山過境公路0 . 7公里,離車站貨場2 . 5公里,交通十分便利。有國際電話及傳真機等通訊設施。
  14. The fitness of four negative electrode materials such as al, fe, zn, cd, and of six membranes materials : microfiber glass mat separator, polyethylene, polypropylene, polyvinyl chloride, vinylon, soapnated cellulose acetate, and of four current collects : carbon fiber ; nickel foam ; nickel foam sthongthened by iron wire net, punched silver grid in the super - iron alkaline batteries was comparatively studied. the influence of two storaged method ( with and without electrolyte ) and two impurities ( zno, fe ( oh ) 3 ) to the experiment cell ' s self - discharge nature was also comparatively studied. at last, the nature of discharge. structure and electrochemistry of experimental cell with k2feo4 as cathode active material prepared by three different methods : high temperature reaction, hypochlorite oxidizing and electrolysis, was comparative ly studied. we can conclude : i ) the open - circuit potential and the flat of work potential and the percent of capacity of k2feo4 till 1. 0v during the discharge at constant load of experimental cells decreased by the order of al / k2feo4, zn / k2feo4, cd / k2feo4, fe / k2feo4. as for the nature of charge - discharge cycle, cd / k2feo4 fe / k2feo4 zn / k2feo4. in water solute electrolyte, although al / k2feo4 can n ' t be used as storage battery, it have great potential as primary cell or storage cell from the aspect of its discharge capacity. discharge power

    採用組裝實驗電池、 x -射線衍射( xrd )和循環伏安( cv )的方法,從實驗電池的放電特性、充放電循環特性、自放電特性,不同高鐵酸鹽的結構特性和電化學特性幾個方面,對4種金屬負極材料( al 、 fe 、 zn 、 cd ) 、 6種隔膜材料(復合玻璃纖維、幅射接枝聚乙烯、改性聚丙烯、聚氯乙烯、維尼綸無紡布、皂化再生纖維素) 、 4種集流體材料(泡沫鎳、以鐵網為加強層的泡沫鎳、切拉銀網、炭纖維編織網)在堿性高鐵電池中的適用性進行了比較研究;對2種雜質組分( zno 、 fe ( oh ) _ 3 )和2類不同貯存方式(干、濕)對實驗電池自放電特性的影響進行了比較研究;對3種方法(高溫固相反應、次氯酸鹽氧化、直流電解)所制k _ 2feo _ 4的實驗電池的放電特性、結構特性和電化學性能進行了比較研究。
  15. Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations

    (三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。
  16. Discharge - sand gate offers double disk cooling system creditable condition for low temperature ; when sand temperature is very high, it can change the way of discharge - sand gate into intermittent type : put rating sand to double disk and spray water for falling temperature until temperature falls designed range ; open the discharge - sand gate and discharge sand ; and then takes anther cycle ; this type has good effect after real testing, which is the effective way for exerting cooling function of double disk

    卸砂門這種控制方式給雙盤冷卻系統的可靠降溫提供了條件,當型砂溫度較高時可將卸砂門改成間歇式的,先將雙盤內加入給定的砂量,噴水后直到溫度降到給定的范圍后,卸砂門打開將砂子卸出,然後進行下一循環,這一方式經實際運行驗證效果良好,是充分發揮雙盤冷卻作用的有效途徑。
  17. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  18. They are also used for industrial and urban water supply and discharge, pressurized water supply in high - rise constructions, distant distance water supply, cold and hot water circulation pressurization in heating, bathrooms and boilers, water supply in air - conditioning and refrigeration system, and used to match other equipments

    也可適用於工業和城市給排水,高層建築增壓送水、遠距離送水、採暖、浴室、鍋爐冷暖水循環增壓空調製冷系統送水及設備配套等場合。
  19. Lay - flat water discharge hose is light in weight, and flexible with good cold and hot resistance, high working pressure, it is ideal tool for pump, water discharge in agriculture and building

    質輕,柔軟,存放佔用用空間小,耐候性好,使用壓力高,是水泵的配套用管,農業灌溉,建築工程排水的理想管材
  20. High density non - thermal plasma generated by pulsed high - voltage discharge is a new advanced oxidative technology in water treatment, which combines electronic, chemical oxidation and light into one process to degrade organic substances in wastewater and kill bacteria

    摘要利用高壓脈沖放電在水中產生高密度的低溫等離子體來降解水中有機物、殺滅水中病毒細菌,是集電、化學氧化、光於一體的水處理高級氧化技術。
分享友人