  1. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  2. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦水電站700mw水輪機的參數選擇進行了研究,通過對國內外的大容量、高水頭水輪機的比轉速統計計算,利用水輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了水輪機主要參數選擇論證,提出了適合拉西瓦水電站水輪機的主要目標參數。
  3. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  4. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的水力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引水管道、調壓井、壓力主管的兩臺高水頭引水式水輪機調節系統大波動時的模擬模型,引入實際電站的參數,對甩負荷過渡過程進行了模擬計算,分析水力干擾對電站安全、穩定運行所造成的影響,並提出了一系列減輕水力干擾的措施。
  5. The models are compact and reliable operation, high in average efficiency. it is applicable to the head of water, and the power station which have great load changes

    該機型結構緊湊,運行可靠,平均效率高,適用於水頭及負荷變化較大的電站。