hydrogenerator 中文意思是什麼

hydrogenerator 解釋
加氫反應器
  1. The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework

    三峽工程左岸電站水輪發電機中性點接地方式的選擇應和發電機100 %范圍定子一點接地保護相關聯。
  2. Analysis and comparison of four transposition methods in the stator bar of hydrogenerator

    水輪發電機定子線棒4種換位的分析與比較
  3. Due to the success in yantan project, the similar method are applied in three gorges project, the maximal potential vibration excitated by hydraulic disturbance of hydrogenerator set in three gorges hydropower house are estimated

    在此基礎上將本文方法應用於三峽工程,對三峽廠房在機組垂直動荷載作用下的最大可能振動作了計算預測。
  4. There is no effective method to forecast and estimate the hydraulic vibration of hydraulic turbine up to now in the world, much less research in - depth for powerhouse structure resonance excitated by hydraulic disturbance of hydrogenerator set

    目前國內外尚無完善的水輪機水力振動預估方法,而對機組水力振動引起的廠房結構共振更是未深入研究。
  5. Design of hydrogenerator house in tengxigou water power station

    四湖溝水利樞紐壩型比較施工導流設計
  6. Hydrogenerator rotors : zero frequency of torsional vibration and resonance

    水電機組轉子軸系扭振零頻的計算和共振分析
  7. Guide for installation technology of bulb turbine hydrogenerator unit

    燈泡貫流式水輪發電機組安裝工藝導則
  8. Based on the vibration test in yantan hydropower house, in this paper the author adopt les method which belong to three dimensions unsteady turbulent flow numerical analysis to simulate vibration resource characteristics of hydrogenerator set, a harmonic vibration model of powerhouse substructure is put forward to carry out firstly a precise modal analysis and dynamic response analysis for generator floor. the numerical calculation results agree well with the surveyed data in situ

    本文結合巖灘水電站廠房振動的試驗研究,採用非定常湍流數值分析的大渦模擬方法進行混流機組水力振動振源模擬;提出一種水電站廠房下部結構簡諧振動模型,首次進行了發電機層樓板結構的精確模態分析和水力激振荷載下的動力響應分析,各項計算結果與實測數據吻合良好。
  9. The capacity and size of modern hydrogenerator set are larger with rapid developing of hydroelectric engineering, specific speed of hydraulic turbine increase too. the phenomenon of excessive vibration in some load area is founded ubiquitously

    隨著水電工程建設的高速發展,現代水輪發電機組的容量和尺寸日趨增大,比轉速也相應提高,普遍出現在某些工作區域內振動過大的現象。
  10. Longyang gorge 320mw hydrogenerator is taken for example and the calculating results and the measured results are compared to test the accuracy of calculation

    以龍羊峽320mw發電機為例進行了計算,將理論計算結果與實驗結果進行了比較,驗證了計算的準確性。
  11. Longyang gorge 320mw hydrogenerator is taken for example and the calculating results and the measured results are compared to confirm the accuracy of calculation

    以龍羊峽320mw發電機為例進行了計算,將理論計算結果與實驗結果進行了比較,驗證了計算的準確性。
  12. Principle of automatic control hydrogenerator re

    自動調節原理及水輪機調節
  13. Wireless sensor network, which is a new way for collecting data, provides an excellent choice for hydrogenerator condition monitoring

    無線傳感器網路作為一種新的數據採集技術為水電機組狀態監測提供了一種極佳的選擇。
  14. However, the powers of sensor nodes are provided by their equipped batteries and currently they can ’ t guarantee the network ’ s long time working. so energy - efficient mechanisms such as balancing the energy consumption of network, increasing redundant nodes, sleeping, data aggregation and data compression are used to prolong the network lifetime in hydrogenerator condition monitoring

    但由於傳感器節點採用電池供電,現有技術條件下電池的壽命不能滿足無線傳感器網路長期工作的需要,所以採用均衡網路節點消耗的能量、增加冗餘節點、採用休眠機制、進行數據融合和數據壓縮等機制高效的使用傳感器節點的能量、延長網路的壽命是無線傳感器網路用於水電機組狀態監測必須解決的問題。
  15. Since 1991, our country has imported the elastic metal plastic tile from the former soviet union to use in the thrust bearing of large scale hydrogenerator, which has played important role in solving the tile burning failure so as to enhance the operation reliability of the generating unit

    我國從1991年開始從前蘇聯引進彈性金屬塑料瓦用於大型水輪發電機的推力軸承上,對解決燒瓦事故,提高機組的運行可靠性起到很大作用。
分享友人