in situ soil test 中文意思是什麼

in situ soil test 解釋
原地土壤試驗
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • situ : 西楚
  • soil : n 1 泥土,土壤;土質。2 土地,國土。3 滋生地,溫床。4 農業生活,務農。n 1 臟東西,污物,污穢,污...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. The soil - rock foundation was applied in highway of changde - zhangjiajie, and in order to assure soil - rock foundation quality by shocking and compaction test, different virtual height of soil - rock foundation was constructed and it ' s quality was controlled for in - situ test, it was considered as parameter for virtual height, shocking and compaction quantities, shocking and compaction sediment rate and maximum diameter of packing materials

    摘要針對常張高速公路採用沖擊壓實技術壓實土石混填路基的問題,選取試驗段進行了不同虛鋪厚度路基的施工工藝及質量控制等試驗研究,提出了虛鋪厚度、沖壓遍數、沖壓沉降率(單級沉降量) 、填料最大粒徑等施工控制參數。
  2. Furthermore, both current in - situ conductivity test data interpretation methods and gshp design methods are based on models that only consider heat conduction. therefore, the groundwater flow may impact the results of in - situ thermal property of soil, and then the ghe size, and make the short - time economics of gshp comparatively unattractive consequently

    此外,由於現場對巖土熱物參數的測試及分析也都僅考慮了熱傳導的影響,這勢必影響現場測試結果的精度,最終又會引起換熱器大小的變化,使土壤源熱泵的經濟性受到挑戰。
  3. The in - situ test result shows that using the lime - soil pile to treat the collapsible loess under the bridge is feasible

    現場檢驗表明,本文提出的採用灰土樁處理橋基濕陷性黃土地基是可行的。
  4. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  5. Based on the distribution regularities of stratigraphic sandy soil in the tianjin yongdingxin river estuary area, the in - situ standard penetration test ( spt ) method and the indoor dynamic triaxial test method were used to make the sandy soil liquefaction discrimination

    摘要根據天津永定新河口灘塗地層沙性土分佈規律,採用現場標準貫入試驗和室內動三軸試驗兩種方法進行了沙性土的液化判別。
  6. Based on a thorough investigation of the engineering geological condition for the reservoir region of the huizhou pumped storage power station, the in - situ trial pit water injection test, boring water injection test, and water pressure test were performed to study the permeability of rock and soil mass

    摘要在對惠州抽水蓄能電站庫區工程地質條件進行詳細調查的基礎上,採用現場試坑注水和鉆孔注水、壓水試驗等方法了解巖土體的透水性。
  7. Research on project of in - situ test for seasonal frozen soil subgrade treatment in plateau

    高原季節性凍土路基處治的現場試驗方案研究
  8. ( 4 ) to determine liquefaction potential in site, several viable approaches are used, and these are ( 1 ) the standard penetration test ( spt ), ( 2 ) measurement of in - situ shear wave velocity ( vs ), and ( 3 ) use of test data and seed & idriss method. considering the non - linear of the soil, we calculate the earthquake response of the soil with the hardin - drnevich model and the finite element method. finally, we estimate the liquefaction capability of the site during earthquake in xuzhou, jiangsu province

    中國地展局工程力學研究所碩士學位論文川採用《建築抗震設計規范》 ( gb50on一2001 )基於標準貫入試驗的判別法、基於場地剪切波速的液化判別方法和seed一idriss簡化法對可液化場地進行了液化判別;考慮土的非線性,採用等效線性化模型,利用有限元方法進行了場地的地震反應分析;並對滬蓉高速鐵路徐州段可液化場地的地震液化性能做出了綜合評價。
  9. Standard test method for logging in situ moisture content and density of soil and rock by the nuclear method in horizontal, slanted, and vertical access tubes

    在水平傾斜和垂直通道管中用原子核法對滲出土壤和巖石的潮氣含量和密度測定的標準試驗方法
  10. Based on the in - situ test of subgrade over soft soil reinforced by vacuum combined with fill preloading, the soil settlement property, controlling effect of post - construction settlement and preloading time that satisfy the settlement standards are analysed

    摘要根據某真空聯合堆載預壓法加固深厚層軟土的試驗成果,分析了地基沉降規律、控制軟土地基路基工后沉降的效果,以及滿足高速鐵路路基工后沉降標準要求的預壓時間。
  11. Secondly, a study of one kind of composite soil nailing, that is, a combination of soil nails with waterproof cement - soil mixing pile wall, was carried out by laboratory model test, the retaining structures were modeled according to a similarity rule that geometric length of the structure is in inverse proportion to deformation duration of the structure and the staged excavation and retaining was carried out during experiment to simulate actual construction procedures in situ

    其次,通過模型試驗研究了土釘與水泥土樁聯合支護型式的變形、破壞形態以及作用原理。試驗模型箱為無蓋六面箱體,內空凈尺寸長寬高為3 . 4m 1 . 0m 2 . 0m ,試驗填料為重塑土,土釘採用硬質鋁管。
分享友人