index plan 中文意思是什麼

index plan 解釋
標準層
  • index : n (pl es dices )1 索引。2 指標,標準,標志。3 示[食]指 (=index finger)。4 指數。5 【印刷】指...
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. Cadastral survey plan index system

    地籍測量圖索引系統
  2. The research of the thesis shows : optimize theory describes and makes the target as model, array, level, and deals with every scheme that determines the nature and quantitative factor chosen in unison that appraised, its result is objective, true, reliable, can plan making policy to offer scientific basis finally of overall arrangement for the route of the highway ; the fuzzy comprehensive evaluation assessment is simple, clear, practical, can make more factors participated in judging, and overcome the subjective and random that existed when chosen the route scheme ; level analytic approach promises high grade highway route overall arrangement scheme judge and carries out the tr ansition to from single factor index multifactor synthesis of index judge, and the result is convincible

    論文研究表明:優化理論將描述與評價的對象模型化、序列化、層次化,並統一處理各方案比選中的定性與定量因素,其結果客觀、真實、可靠,能為公路路線規劃布局的最終決策提供科學依據;模糊綜合評判方法簡單、清晰、實用,能使更多的因素參與評判,克服了路線方案選擇時存在的主觀隨意性;層次分析法做到高等級公路路線布局方案由單因素指標評判過渡到多因素指標的綜合評判,結果具有說服力。
  3. Index - exhibitors - floor plan click the map to enlarge it

    您的位置:首頁-展商指南-展館平面圖
  4. It maintains an index plan in digital form of all leasehold lots and government land allocations as well as records of the land boundary surveys

    該處為所有已批租地段及政府土地物業,備存一套數碼形式索引圖則,同時又備存所有地界測量的記錄。
  5. It has also established a cadastral survey plan index system to facilitate the search of land boundary survey records

    該處又設立一個地籍測量圖索引系統,利便地界測量記錄的查閱工作。
  6. Applying the npv method, the network optimizing plan algorithm is presented based on the reliability index and the sensitivity index. the effectiveness of the method is verified by the planning of qinan power network

    論文應用凈現值方法,利用可靠性和敏感性指標,提出計及經濟性和可靠性的電網網架結構優化方法,並將其應用於綦南電網,證實了方法的有效性。
  7. Access plan directives that force the optimizer to use the designated access method for data retrieval, either sequential scan or index scan

    訪問計劃指示,強制優化器使用指定的訪問方法進行數據檢索,要麼是連續掃描,要麼是索引掃描。
  8. The organizing of space environment includes : organizing space in proper order, the field and security of space environment, the specific character of space environment. in the part of the plan and design of lawn, the function of lawn and the index of the plan, the technique of planning lawn were very important, so they were introduced in detail, children field and old peoples " field were welcomed, they were also introduced in detail

    居住小區的室外空間環境的組織包括:室外空間環境的有序組織、室外空間環境的領域性和安全性、室外空間環境的可識別性三方面;對于綠地的規劃設計,詳細介紹了綠地的作用、綠地規劃指標和小區中各種綠地的規劃設計的內容和方法;兒童游戲場、老年人活動場地及小品設施也是室外環境中必不可少的,對此,同樣詳細論述。
  9. Since high purified water for blood dialysis is obtained by reverse osmosis film separation, the quality of reverse osmosis unit is critical for water quality index, which should meet aami water supply standard, thus entailing a proper plan for the whole system

    血液透析用反透水處理系統採用反透膜法分離技術制取高品質純凈水,反滲透裝置的質量可靠性是關系產水指標能否達到美國aami用水標準的關鍵,合理的設計方案是必要的前提條件。
  10. Then it puts forward the countermeasures of improving the management. part five analyses the determination of the index to the land use plan in yubei district of chongqing city and sets forth the management measures accordingly. part six is the conclusion

    第五部分:實證研究?以重慶市渝北區為例本部分根據渝北區域實際,重點分析渝北區本輪土地利用總體規劃中指標的確定的方法,得出相應的結果,然後提出相應的管理措施。
  11. Combining the land use plan amendment this turn in yubei district of chongqing city, the thesis discusses the relevant theories, methods and techniques in determining the index to the land use plan and explores the correspondent management measures to direct the land use plan and serve for the economy

    本文正是在這樣的基礎上,結合這一輪重慶市渝北區土地利用規劃修編實際,詳細論述了土地利用規劃中指標的確定的相關理論、方法與技術,並積極探索相應的管理對策,以指導土地利用規劃管理實際,為經濟建設服務。
  12. Location index - plan

    位置索引圖
  13. Lot index plan

    地圖索引圖
  14. The model of performance management based on team can be briefly summarized as " two main lines and a cycle ". one line is the decomposition of the enterprise strategy based on bsc and the result of decomposition is the index system and action plan of department ; the other line is establishment the key performance indicator of job based on the process analysis and the result is key performance indicator and the clear duty of job ; conversely, the realization of job duty and kpi supports the completion of department index system and action plan, and further supports the realization of enterprise strategy ; then the process above forms a complete circulatory system

    基於團隊的績效管理模型可以概括為「兩條主線,一個循環」 ,即:基於bsc的企業戰略分解,這條主線形成部門指標體系和行動計劃;基於流程分析的關鍵指標制定,這條主線形成了崗位關鍵績效指標和細化的崗位職責;反過來,崗位職責的履行、崗位kpi的實現促成了部門行動計劃完成和部門指標體系的達成,並最終支撐企業戰略的實現,從而形成了一個完整循環系統。
  15. In the light of its special property being not easy to gain strength, through mechanics researches on different methods to stabilize this kind of low _ liquid _ limit silty soil as subbase material, evaluated both technically and economically, we have got a cement lime stabilization plan to meet the index requirements for non _ side _ limit strength of compression of subbase of class2 road stipulated in the specification ; by means of improving the workmanship, thickening the loose layer of soil, adding soil on covering weave fabric before compaction, such problems can be solved as very poor compaction, loose surface during compaction, roughness and unevenness, coats of layer and shear damages

    本文針對黃河沖積而成的低液限粉土其粘粒含量極低、土的不均勻系數很小、膠體活性差的工程特性,通過採用不同方法穩定該類土作底基層材料的力學性能研究,從技術、經濟角度綜合評價,得到滿足規范抗壓強度指標要求的水泥石灰穩定方案。通過對原材料、試驗配合比設計、施工、等方面進行優化,從而顯著減輕了基層的早期及長期縮裂程度,從而提高了路面的耐久性。
  16. The achievements are as follows : 1 ) the system model based on the whole course in of erp project theory have been put forward, erp ' s project are divided into three stages in this model, evaluation is divided into four parts, and the indexes that should been evaluated at each stages and relationship among these stages has been described systematically ; 2 ) at proposed stage, according to the characteristic of erp project, feasibility analysis should been carried out from seven respects such as managing foundation technological foundation, the fund foundation, personnel foundations, basic data, understanding and demand to erp and goal of the enterprise ; 3 ) in selecting software, 18 indexes and three factors have been put forward including system quality of the software, the fact relating to the software supplier serves, and the fact relating to enterprise, then use ahp to evaluate ; 4 ) in project implementation the evalution flow model on the basis of implementing and the index system have been proposed. the index system include 14 indexes and three respects respect which are control of the goal and plan, quality of the system use, and quality of information. 5 ) performance measurement of erp project is proposed in four respects of balanced scorecard. and according to the characteristic of erp project performance, the result of measurement should been calculated with fuzzy mathematics, then a satisfaction index can be drawn

    主要成果表現在: 1 )在評價erp項目評價理論基礎方面提出了基於全過程erp項目的評價體系模型,在此模型中將erp項目實施分為三個階段,評價分為四個部分,並系統論述了各個階段應該評價的指標,以及各個階段的相互關系; 2 )在項目可行性分析部分,根據erp項目的特點提出了從七個方面分別是:管理基礎、技術基礎、資金基礎、人員基礎、基礎數據、對erp的認識與需求,和企業的目標對erp項目進行可行性分析; 3 )在軟體選型部分,提出了軟體系統質量因素、與軟體供應商服務有關的因素、和與企業有關因素三個方面18個指標的評價體系,並用層次分析法進行評價; 4 )在項目實施階段,提出了基於實施過程的評價流程模型,同時提出了評價指標體系從計劃,目標的控制、系統使用質量、和信息質量三個方面14項指標來評價實施過程; 5 )在項目績效評價部分,提出以平衡記分法的四個方面評價erp項目的績效,建立了bsc - erp評價模型,並根據erp項目績效的特點提出了用模糊數學對評價結果進行計算,得出一個滿意程度指標。
  17. Based on the system engineering theory, and through detailed analysis of economic techniques of the engineering work plan examples of the common used long span steel truss structures, utilizing the sequenced layer analysis, the current paper will establish the long span engineering work plan index system. also by the fuzzy mathematical principles, it builds multi - layer fuzzy complex mathematics judgment and calculate the weight coefficient of each index by application of fuzzy power duality method ; and based upon the experts investigation method builds each index judgment matrix. finally applying the current popular update system tool - power builder 8. 0 developed the " optimization system of ( construction ) fuzzy work plan " to solve and carry out the multi - layered fuzzy combination judgment ; then step on the analysis and research on the reliability of the optimal solution for further achievement of the final objective of the fuzzy optimization in selecting the construction work plan of long - span steel truss realization

    本文以系統工程學的理論為基礎,通過工程實例對常用大跨度鋼桁架結構施工方案進行詳細的技術經濟分析,運用層次分析法建立起大跨度鋼桁架結構施工方案的指標體系,利用模糊數學原理建立了多層次模糊綜合評判數學模型,採用模糊權重二元對比法計算出各指標的權重系數,並採用專家調查法建立各指標的評判矩陣,利用目前最流行的工具系統- powerbuilder8 . 0編制了《建築施工方案模糊優選系統》求解計算,進行多層次模糊綜合評判;調整權重和隸屬度,對數學模型最優解的可靠性作了進一步的分析和研究,從而達到模糊優化選擇大跨度鋼桁架結構施工方案的最終目的。
  18. What profit points to is profit after tax, what duty points to is duty of duty of value added tax, consumption tax, resource, business tax, stamp duty, city building waiting profit tax amount a moment is to point to sale tax of industrial company product gold, education expends duty of add, resource and profit total 4 the sum, but each taxes that does not include enterprise plan life to produce cost, it is reflective industry business the main index of total net income inside certain period

    利潤指的是稅后利潤,稅指的是增值稅、消費稅、資源稅、營業稅、印花稅、城建稅等等利稅總額是指工業企業產品銷售稅金、教育費附加、資源稅和利潤總額四項之和,但不包括企業計人生產成本的各項稅金,它是反映工業企業一定時期內全部純收入的重要指標。
  19. Process capability index ( pci ) is also an important method to measure and improve quality, which has play a key role in assuring quality evidence, lowering cost and raising customer satisfaction indexes ( csi ). this paper studies the applications of pci and control chart from the actual viewpoint, and discusses the applications of the probability a, ( 3 of type i, ii error of the control chart, the detecting power and pci based on x control chart. in addition we explore the relationship between qlf and pci, put forward the concepts of relative loss and loss extent, adopt the linear plan to optimize pci and decide the best loss extent of each process. an example is given

    )控制圖為例,討論了控制圖的兩類錯誤、檢出力與過程能力指數在實際中的應用;重要的是討論了質量損失與過程能力指數之間的關系,提出了相對質量損失、損失度等概念;研究了多道工序相對質量損失、損失度對總質量損失的影響,並從質量損失的角度出發,採用線性規劃的方法,優化多工序的過程能力指數,確定各道工序的最佳損失度,實證討論了這種關系,同時可以利用這種關系對供應商進行評價,給出了從全局的、動態的角度選擇供應商的方法,為上下游企業間的配合、監督及共同進步提供了理論基礎和實現途徑。
  20. The build and construction of ecology include the build and construction of green space overall arrangement, the build and construction of the index, the build and construction of seedling security system, the build and construction of bio - diversity system and the build and construction of the technological economic policy security system etc. these classified build and construction present the logic relation with each other : the build and construct of overall arrangement control the green skeleton of the city ; the index plan ensure the green skeleton can exist forever ; the build and constructi on of seedling security system guarantee the index of city green space can put in practice in the light of plan ; the build and construction of bio - diversity system can afford the abundant gene pool for nursery stock system and can ensure the ecological stability of the city ; and the build of the technological economic policy security system can guarantee the implementation of a serious of build and construction upwards successfully

    為了符合生態園林城市的定位,綠地系統需緊緊抓住生態建構和景觀風貌建構兩個方向。其中生態建構包括各類綠地布局建構、指標建構、苗木保障體系建構、生物多樣性體系建構及技術經濟政策保障體系的建構等。這些分類建構互呈邏輯關系:布局建構控制了城市的綠色脈絡,指標規劃保障這個綠色脈絡得以生生不息,苗木保障體系的建構則保證城市綠地指標得以科學實施,生物多樣性體系保障則是為苗木體系提供豐富的基因庫,技術經濟政策保障體系的建立可以保障以上一系列建構的順暢實施。
分享友人